Arian Silver Corporation

Published : March 31st, 2015

MD&A and Results for the Financial Year Ended 31 December 2014

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

 

 

Trading Symbols

AIM: AGQ

TSX-V: AGQ

FWB: I3A

 

31 March 2015

 

Arian Silver's MD&A and Results for the Financial Year Ended 31 December 2014

 

Arian Silver Corporation ("Arian Silver" or the �Company�), (AIM:AGQ, TSXV:AGQ), a silver mining company focussed on projects in the silver belt of Zacatecas, Mexico, is pleased to announce the release of its Management's Discussion and Analysis ("MD&A") and Financial Statements ("Financials") for the year ended 31 December 2014.

 

Jim Williams, Chief Executive Officer of Arian Silver, commented:  �Arian Silver made tremendous progress in 2014, advancing towards its goal of becoming a mid-cap silver producer. Despite the challenging environment in the junior mining sector, we successfully concluded a significant financing, which has enabled us to complete the refurbishment and construction of our processing plant, and which will take the San Jos� project into production.

 

I look forward to reporting on our progress throughout 2015 as we ramp up towards full scale production, growing the resource base through exploration activities, and creating significant value for our shareholders.�

 

Overall performance

This past year has seen Arian take great strides towards becoming a silver producer.

 

In August 2013, the Company purchased the El Bote processing plant (subsequently renamed �La Tesorera�) (the �Plant�) comprising a crushing circuit with a reported throughput of 150 tonnes per hour, a grinding circuit of four ball mills, two flotation circuits, thickening tanks and filters. Following the acquisition of the Plant in 2013 and during the year, the Plant was disassembled, refurbished, and transported to the Company�s 100%-owned site adjacent to the San Jos� mine, where during 2014, site preparations and civil works had been completed, and where the Plant was then reassembled.

 

In addition to the construction of the Plant, the Company developed the site infrastructure, including the installation of a 4km dedicated 35kV power line connecting the Plant to the grid. Site offices were constructed and haul roads built. Furthermore, Arian commenced construction of the water reservoirs, water management systems and the tailings facility which is nearing completion.

 

Development of the San Jos� and Santa Ana mine blocks continued and a new decline ramp commenced in the Soledad area. In total, over 1,700 metres of mine development work were completed since October 2014, when the Company entered into a new financing agreement. This development work will support production at levels up to the Plant�s design rate of 1,500 tonnes per day (�tpd�).

 

In October 2014 the Company entered into a US$32 million financing arrangement (�Quintana Financing�), restructuring its convertible loan note and funding the future development of the San Jos� project.

 

 

Summary financial information

 

Full Year

Full Year

 

 

2014

2013

Change

 

$000s

$000s

$000s

Revenue

-

129

(129)

Gross loss

(441)

(564)

123

Net loss for the period

(5,914)

(1,611)

(4,303)

Cash and cash equivalents

2,846

7,241

(4,395)

Total assets

35,865

28,366

7,499

 

The absence of revenue in 2014 results reflects the termination of toll milling operations in June 2013.

 

The net loss for the period increased year-on-year primarily on account of a gain of $3.7 million in 2013 in respect of the reported fair value of the derivative liability of the $15.6 million convertible loan note issued to Platinum Long Term Growth VIII, LLC in August 2013 (�Platinum Note�) and transaction costs relating to the Quintana Financing.

 

Cash and cash equivalents decreased primarily as a result of the offset of proceeds from the Base Metal Purchase Agreement (�BMPA�) and the issue of share capital against the cost of operating activities and investment in the purchase and refurbishment of the Plant.

 

Total assets increased during 2014 primarily on account of the investment in the Plant and the development of the San Jos� mine.

 


 

Review of operations

San Jos� Project, Zacatecas State

Overview

The 100%-owned San Jos� property lies 55 kilometres to the southeast of the city of Zacatecas and covers eight mining concessions totalling approximately 6,134 hectares. The property has significant infrastructure, including a 4x5 metre main haulage ramp extending more than 8.5 kilometres along the footwall of the San Jos� vein system, and a 350 metres deep, 500 tpd vertical shaft with an operational hoist. In addition, a number of shallower vertical shafts are located along the vein.

 

Production information summary for San Jos� mine

Full Year

2014

Q4

2014

Q3

2014

Q2

2014

Q1

2014

Head grade (mill): Ag grams per tonne (g/t)

-

-

-

-

-

Tonnes mined

6,632

(695)

-

1,588

 5,739

Tonnes milled

 -

 -

 -

 -

 -

Ag concentrate tonnes produced

-

-

-

-

-

Recovery %

-

-

-

-

-

Ag ounces produced

-

-

-

-

-

Ag ounces per concentrate tonne produced

-

-

-

-

-

Ag ounces sold

 -

 -

 -

 -

 -

Ag concentrate tonnes sold

 -

 -

 -

 -

 -

 

 

       

 

 

 

 

 

 

Quarter end inventory balances

 

       

Mined tonnes stockpile

33,647

33,647

34,342

34,342

32,754

Ag concentrate inventory tonnes

 -

 -

 -

 -

 -

Ag ounces included in concentrate inventory

 -

 -

 -

 -

 -

 

Production information summary for San Jos� mine

Full Year

2013

Q4

2013

Q3

2013

Q2

2013

Q1

2013

Head grade (mill): Ag grams per tonne (g/t)

189

-

-

 191

 174

Tonnes mined

14,501

 8,057

1,816

 4,628

 -

Tonnes milled

3,479

-

-

 3,221

 258

Ag concentrate tonnes produced

47

-

-

 43

4

Recovery %

42.74

-

-

41.42

60.90

Ag ounces produced

9,058

-

-

8,180

 878

Ag ounces per concentrate tonne produced

194

-

-

 190

 251

Ag ounces sold

9,058

-

-

 9,058

 -

Ag concentrate tonnes sold

37

-

-

 37

 -

 

 

 

 

 

 

 

 

 

 

 

 

Quarter end inventory balances

 

 

 

 

 

Mined tonnes stockpile

27,015

 27,015

 18,958

 17,142

 17,935

Ag concentrate inventory tonnes

-

-

-

 4

 4

Ag ounces included in concentrate inventory

-

-

-

 1,204

 878

 

 

 

Three

months ended

31 Dec 2014

Three months ended

31 Dec 2013

Twelve months ended

31 Dec 2014

Twelve months ended

31 Dec 2013

Change

(%)

Head grade - Ag grams per tonne

-

-

-

189

(100)

Tonnes mined

(695)

8,057

6,632

14,501

(54)

Tonnes milled

 -

-

 -

3,479

(100)

 

 

 

 

 

 

Silver concentrate tonnes produced

-

-

-

47

(100)

Silver ounces produced

-

-

-

9,058

(100)

Silver ounces per concentrate tonne produced

-

-

-

194

(100)

 

 

 

 

 

 

Silver ounces sold

 -

-

 -

9,058

(100)

Silver concentrate tonnes sold

-

-

-

37

(100)

 

Mining & milling

Mining activities continued at the San Jos� mine during Q4 2014 in preparation for the resumption of milling activities at the refurbished La Tesorera plant.

 

In August 2013, the Company purchased the El Bote processing plant (subsequently renamed �La Tesorera�) comprising a crushing circuit with a reported throughput of 150 tonnes per hour, a grinding circuit of four ball mills, two flotation circuits, thickening tanks and filters. Following the acquisition of the Plant in 2013 and during the year, the Plant was disassembled, refurbished, and transported to the Company�s 100%-owned site adjacent to the San Jos� mine, where during 2014, site preparations and civil works had been completed, and where the Plant was then reassembled.

 

The Company has built a strong local operating team that has lead the refurbishment and construction of the Plant, and continues to strengthen its team with experienced plant operators as it transitions from being a development to a producing mining company. Arian encourages its contractors, that wherever practicable, workers are hired from local communities; 90% of the personnel employed at the San Jos� project are from the surrounding ejido-based communities. The Company also employed a number of specialised contractors for the development of the necessary site works, tailings dam and electrical infrastructure for the plant.

 

Arian negotiated the buyback of a 2% Net Smelter Return (�NSR�) royalty on the San Jos� project from the previous owners, for $750,000 (including all amounts owed in respect of production from the Company�s earlier toll milling operations, paid in instalments over a six month period; the purchase includes any amounts owing for NSR payments due under the former toll milling operations.

 

By the end of 2014, the Plant was almost fully constructed, as scheduled. Commercial production is expected to commence at an initial rate of up to 500 tpd, increasing to a maximum of 1,500 tpd over the following 18 months.

 

 

Exploration assets

The Company holds 28 mineral concessions in Zacatecas totalling 7,822 hectares, including the San Jos� Project.

 

During the year, the Company applied for a drilling permit in the town of Guanajuatillo which lies on the San Jos� vein in between the Soledad and West End areas. Following several consultations with the local community, in the second half of 2014, the permit was granted and the Company commenced a 5,000 metre drilling programme in Q1 2015 to delineate the resources blocks beneath the town.

 

Information on Arian�s exploration assets are contained in a technical report prepared by A.C.A. Howe International Limited dated 20 March 2006 and entitled �Technical Report on the Calicanto and San Celso Projects, Zacatecas, Mexico�.. Additional information on Arian�s San Jos� Project is contained in a technical report prepared by CSA Global Pty Ltd dated 23 May 2013. Copies of these reports are available on the Company�s website www.ariansilver.com and on SEDAR at www.sedar.com.

 

Subsequent events

Operations

In January 2015, mechanical completion of the Plant was achieved and the Company commenced a phased commissioning programme, starting with the silver-lead circuit and then moving onto the zinc circuit.

 

In February 2015, the company commenced a 5,000 metre exploration programme within the town of Guanajuatillo, which lies on the San Jos� vein in between the Soledad and the West End area and which the Company had not previously explored, even though historic workings together with recent geological interpretation indicate that the vein continues underneath the town. This fifth phase of exploration is underway and scheduled to be completed within Q1 of 2015. Concurrently, the Company commenced construction of a third haulage ramp in the Guanajuatillo area to develop the western boundary of the Soledad resource blocks as well as to open up the Guanajuatillo area. This ramp is part of the mine development programme to ensure a sustainable operation for life-of-mine at 1,500 tpd.

 

In March 2015 the first lead-silver concentrate was produced at La Tesorera processing plant.

 

Share options

On 7 January 2015 the Company granted 50,000 share options under the Company�s share option plan. These share options are exercisable at �0.44 or C$0.79 per share up to 5 January 2020, subject to a four months hold period from date of grant.

 

Funding

Cash of $4..1 million was received in January 2015 pursuant to the terms of the BMPA. The Company has now received $11.8 million of the $15.4 million committed by Quintana Streaming.

 

Forward-looking statements

Certain information contained herein constitutes forward-looking statements. Forward-looking statements are frequently characterised by words such as �plan�, �expect�, �forecast�, �project�, �intend�, �believe�, �anticipate�, �expect�, �budget�, �scheduled�, �outlook� and other similar words or statements that certain events or conditions �may� or �will� occur.

 

Forward-looking statements are based on the opinions and estimates of management at the dates the statements are made, and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements.

 

These factors include the inherent risks involved in exploration and development, and mining of mineral properties, the uncertainties involved in interpreting drilling results and other geological data, fluctuating metal prices, the possibility of project cost overruns or unanticipated operating costs and expenses, uncertainties related to the necessity of financing, the availability of and costs of financing needed in the future, and other factors described in the Company�s MD&A under the heading �Risk Factors and Uncertainties�.

 

The Company undertakes no obligation to update forward-looking statements if circumstances or management�s estimates or opinions should change, other than as required by securities laws. The reader is cautioned not to place undue reliance on forward-looking statements (including, without limitation, statements relating to the mineral resource estimates, statements regarding the San Jos� Project, the ability of the Company to achieve, maintain and possibly increase planned levels of production, and the ability of the Company to generate positive cash flow from the San Jos� Project, the ability to continue or implement proposed drilling programmes on the San Jos� vein system and the Company's exploration, development and production plans and objectives).

 

These forward-looking statements reflect the current expectations or beliefs of the Company based on information currently available to the Company. Forward-looking statements are subject to a number of risks and uncertainties that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements, and even if such actual results are realised or substantially realised, there can be no assurance that they will have the expected consequences to, or effects on the Company. Factors that could cause actual results or events to differ materially from current expectations include, among other things, the performance of contractors and plant and equipment, and failure to achieve anticipated production levels and mineral grades for ore from the San Jos� Project, failure to establish estimated mineral reserves, the possibility that future exploration results will not be consistent with the Company�s expectations, uncertainties relating to the availability and costs of financing needed in the future, changes in the silver commodity price, changes in equity markets, political developments in Mexico, changes to regulations affecting the Company's activities, delays in obtaining or failures to obtain required regulatory approvals, the uncertainties involved in interpreting exploration results and other geological data, and the other risks involved in the mineral exploration and development industry. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Although the Company believes that the assumptions inherent in the forward-looking statements are reasonable, forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

 

Any mineral resource figures disclosed in the MD&A are estimates and no assurances can be given that the indicated levels of minerals will be produced. Such estimates are expressions of judgement based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. While the Company believes that the resource estimates included in the MD&A are well established, by their nature resource estimates are imprecise and depend, to a certain extent, upon statistical inferences, which may ultimately prove unreliable.. If such estimates are inaccurate or are reduced in the future, this could have a material adverse impact on the Company.

 

Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that mineral resources can be upgraded to mineral reserves through continued exploration.

 

Availability of documents on SEDAR

Additional information relating to the Company may be accessed through SEDAR on the internet at www.sedar.com or the Company�s website on www.ariansilver.com.

 

This press release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities of the Company in the United Sates. The securities of the Company have not been and will not be registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act") or any state securities laws and may not be offered or sold within the United States or to U.S. persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) and no stock exchange, securities commission or other regulatory authority accepts responsibility for the adequacy or accuracy of this release nor approved or disapproved of the information contained herein.

 

 

.
Data and Statistics for these countries : Mexico | All
Gold and Silver Prices for these countries : Mexico | All

Arian Silver Corporation

PRODUCER
CODE : AGQ.V
ISIN : VGG0472G1063
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Arian Silver is a silver producing company based in United kingdom.

Arian Silver produces silver, gold, lead and zinc in Mexico, and holds various exploration projects in Mexico.

Its main asset in production is SAN JOSÉ ZACATECAS in Mexico and its main exploration properties are SAN CELSO and CALICANTO in Mexico.

Arian Silver is listed in Canada, in Germany, in United Kingdom and in United States of America. Its market capitalisation is CA$ 41.4 millions as of today (€ 39.0 millions).

Its stock quote reached its lowest recent point on December 12, 2008 at CA$ 0.03, and its highest recent level on January 07, 2011 at CA$ 8.90.

Arian Silver has 318 491 926 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Arian Silver Corporation
1/18/2008Recommendation and Summary
In the News and Medias of Arian Silver Corporation
10/11/2007MineralSTOX Interview with Jim Williams
Annual reports of Arian Silver Corporation
Results For The Financial Year Ended December 31, 2007
Annual Report 2006
Financings of Arian Silver Corporation
9/24/2015Financing Update
10/1/2014Financing Update
8/23/2013Update on Financing
12/10/2009 Private Placement to Raise up to Cdn$3 Million
Nominations of Arian Silver Corporation
10/15/2013Appoints New Chief Financial Officer
1/7/2013Appoints New Chief Financial Officer
4/6/2011Appoints New CFO
3/17/2011CHIEF FINANCIAL OFFICER STEPS DOWN
8/4/2010Appoints New Broker
2/4/2008Appoints Chief Operating Officer
Financials of Arian Silver Corporation
6/29/2016Financial Results for the Year Ended 31 December 2015
10/14/2011Dundee Securities says Arian Silver Corp. (AGQ) is a Buy!
8/22/2011MD&A and Results for the Six Months Ended 30 June 2011
5/31/2011MD&A and Results for the Three Months Ended 31 March 2011
4/27/2011MD&A and Results for the Financial Year Ended 31 December 20...
12/1/2009MD&A and Financial Results for the Three and Nine Months End...
8/27/2009Financial results for the three and six months ended
5/28/2009Md&A and financial results for the three months ended 31 Mar...
Project news of Arian Silver Corporation
5/13/2016Arian Silver progresses metallurgical and mineralogical test...
3/14/2012Upgraded resources
1/16/2012(San José Zacatecas)Reports Further Encouraging Exploration Progress at San Jose
10/25/2011(San José Zacatecas)Reports Encouraging Progress on Phase 4 Drilling at San Jose
7/22/2011(San José Zacatecas)Announces Significant Increase in Mineral Resources at San J...
6/27/2011(San José Zacatecas)Reports Wide High-Grade Silver and Base Metal Intercepts
6/8/2011(San José Zacatecas)PROGRESS UPDATE ON SAN JOS CUSTOM MILLINGOPERATION THEFT OF ...
4/12/2011(San José Zacatecas)Announces Progress Update at San Jose; Increase in Concentra...
4/5/2011(San José Zacatecas)Continuing Exploration Drilling Intercepts High-Grade Silver...
3/14/2011(San José Zacatecas)Clarifies Its Disclosure
2/21/2011(San José Zacatecas)Intersects Widest Economic Silver Grades Yet 6 km West of Sa...
6/30/2010(San José Zacatecas)San José Production Statement
2/10/2010(San José Zacatecas)Progresses San José Property Towards Production
1/29/2010(Tepal)Executes Definitive Option Agreement with Geologix for Tepal...
1/19/2010(Tepal)Notified of Geologix's Intention to Exercise Tepal Option
11/6/2008(San José Zacatecas)Reports Phase-2 Assays on Initial 19 Holes at San Jose
9/24/2008(Tepal)Upgrades Tepal Resource Estimate
7/2/2008(San José Zacatecas)Exploration Update - San Jose Project
4/14/2008(Tepal)Drilling Intersects 110 Metres Grading 1.13 g/t AuEq at Tepa...
3/10/2008(Tepal)Initial NI 43-101 Resource Calculation at Tepal
3/3/2008Initial NI 43-101 Resource Calculation at San Jose
12/12/2007(San José Zacatecas)San Jose update
11/13/2007(Tepal) announces Tepal drilling results
10/30/2007(San José Zacatecas)San Jose Drilling Results
8/8/2007(Tepal)Reports Initial Drill Results at Tepal and Confirms Historic...
7/26/2007(San José Zacatecas)Drill Results Confirm and Discover Additional Mineralised Zo...
4/16/2007(Calicanto)Calicanto Drilling Report
Corporate news of Arian Silver Corporation
8/1/2016Result of Annual General Meeting
6/30/2016Notice of Annual General Meeting
5/4/2016Exclusive Option over Tailings Project in Mexico
4/28/2016Placing to raise £700,000
1/28/2016Placing and directors’ dealings
1/26/2016Final Closing of Settlement with Quintana Achieved
12/15/2015Trading to resume on AIM
11/3/2015Arian Silver Corporation - Receipt of Default Notice
10/29/2015Trading To Resume on TSX-V
10/29/2015IIROC Trading Resumption - AGQ
10/29/2015IIROC Trading Halt - AGQ
10/8/2015Notification Of Major Interest In Shares
10/5/2015Updated Mineral Resource Estimate
10/5/2015Arian Silver Corporation - Updated Mineral Resource Estimate
9/24/2015IIROC Trading Resumption - AGQ
9/24/2015Arian Silver - Financing Update
9/22/2015Arian Silver Corporation - Company Update
9/21/2015TSX-V Trading Halt; AIM unaffected
9/21/2015IIROC Trading Halt - AGQ
9/15/2015Company Update
9/14/2015Arian Silver Corporation - Company Update
9/3/2015Directorate Change – clarification
9/1/2015Arian Silver Corporation - Directorate Change - clarificatio...
9/1/2015Arian Silver’s Md&a and Financial Statements for the Three a...
8/31/2015Arian Silver's MD&A and Financial Statements for the Three a...
8/31/2015Directorate Change
8/10/2015Holding(s) in company
8/10/2015TR-1: Notification of Major Interest in Shares
8/2/2015July 15th, 2015Change of Advisor (More)
3/31/2015Arian Silver's MD&A and Results for the Financial Year Ended...
3/31/2015Arian Silver Achieves First Concentrate Production at San Jo...
3/30/2015Arian Silver Achieves First Concentrate Production at San Jo...
2/9/2015Arian Silver Acquires 2% Net Smelter Return Royalty on San J...
2/2/2015Arian Silver Commences a 5,000m Drilling Programme at San Jo...
1/23/2015Director/PDMR Shareholding
1/23/2015Arian Silver Corporation: Director/PDMR Shareholding
1/14/2015Operations Update
1/14/2015Arian Silver presents at Canadian Investor Conference
1/14/2015Arian Silver Presents at Canadian Investor Conference
1/14/2015Arian Silver Operations Update
1/7/2015Holding(s) in company
1/7/2015Arian Silver Corporation: Holding(s) in company
1/7/2015Grant of Share Options
1/7/2015Arian Silver Grant of Share Options
12/16/2014Appointment of Broker
12/16/2014Appointment of Non-Executive Directors
12/16/2014Arian Silver's MD&A And Results For The Three And Nine Month...
12/16/2014Result of General Meeting
12/9/2014Arian Silver Corporation: Result of General Meeting
11/26/2014Arian Silver's MD&A and Results for the Three and Nine Month...
11/18/2014Arian Silver Appointment of Non-Executive Directors
11/17/2014Arian Silver Appointment of Broker
11/12/2014Arian Silver Corporation: Notice of General Meeting
10/30/2014Arian Silver Restructures Quintana Loan Note
10/15/2014Arian Silver Raises $32 Million for San Jose
10/9/2014Arian Silver Corporation: Issue of Equity
10/1/2014Arian Silver Corporation: Financing Update
9/18/2014Arian Silver Corporation: Issue of Equity
9/16/2014Arian Silver Corporation: Significant Progress at San José P...
8/29/2014Arian Silver's MD&A and Results for the Three and Six Months...
8/29/2014Arian Silver Corporation: Financing Update
11/28/2013MD&A and Results for the Three and Nine Months Ended 30 Sept...
11/4/2013Progresses Refurbishment of the El Bote Processing Plant in ...
10/31/2013Director/PDMR Shareholding
9/2/2013Completes Financing and Acquisition of Company-Owned Mill
8/30/2013Consolidation of Shares
8/29/2013MD&A and Results for the Three and Six Months Ended 30 June ...
8/9/2013Share Consolidation-Timetable of Principal Events
8/5/2013Issue of Shares
8/1/2013Notice of General Meeting
7/26/2013Proposed Share Conso =?ISO-8859-1?Q?lidation,=20Mailing=20of...
7/12/2013Issue of Shares
6/25/2013Operations Update
6/10/2013Holding(s) in company
5/30/2013CEO Jim Williams Q&A: Market Fundamentals, Manipulation and ...
5/24/2013Files Technical Report
5/23/2013MD&A and Results for the Three Months Ended 31 March 2013
5/15/2013Result of Annual General Meeting
5/8/2013Issue of Shares
4/18/2013Notice of Annual General Meeting
4/16/2013"Transformed!" says Edison about Arian Silver Corporation
4/16/2013(TSXV, AIM: AGQ; FSE: I3A) Updated Research Report
4/15/2013Transformed!
4/5/2013Issue of Shares
3/14/2013Issue of Shares
2/19/2013Operations Update
1/31/2013Issue of Shares
1/10/2013(AGQ), Booth #2027, Vancouver Cambridge House
1/9/2013Issue of Shares
12/12/2012Issue of Shares
11/9/2012Issue of Shares
11/1/2012MD&A and Results for the Three and Nine Months Ended 30 Sept...
10/1/2012Can Boost Silver Recoveries says Independent Metallurgical R...
9/27/2012Enters SEDA Agreement
7/6/2012New Research Coverage on Arian Silver Corporation
6/13/2012Confirmation of Filing of Fixed Share Option Plan
5/3/2012Notice of Annual General Meeting
4/25/2012Files San Jos=E9 Technical Report Update
4/12/2012Director's Share Purchase
3/12/2012Increases Contained Silver at San Jos=E9 by 32% to More Than...
1/23/2012Issue of Shares
1/18/2012Drilling results
6/14/2011Director's Share Purchase
6/8/2011- AGM Result
4/20/2011Issue of Shares
3/1/2011share interest of Mr R Humphreys has fallen below 3% of the...
8/24/2010MD&A and results for the six months ended 30 June 2010
8/13/2010Issue Of Shares
7/29/2010Edison Research initiating coverage on Arian Silver
7/29/2010Initiation of coverage
6/23/2010AGM Result and Statement
5/27/2010MD&A and results for the three months ended 31 March 2010
5/18/2010announces Notice of Annual General Meeting
4/30/2010MD&A and Results for the Financial Year Ended 31 December 20...
4/21/2010Reports on Progress at San Jose
4/20/2010Reports Share Interest change and Issue of Shares
4/12/2010Share interest change and AGM date
3/25/2010reports on change in share interest
3/19/2010Directorate Change
2/5/2010Reports on Share Capital, Voting Rights and Share Interests
1/22/2010announces closing of transactions with Grafton
12/9/2009Announces a Reconstruction of its Share Relationship with Gr...
6/23/2009Reports on Annual General Meeting of Shareholders; Change to...
6/23/2009Releases Independent Preliminary Economic Assessment Report;...
2/26/2009ANNOUNCES FIRST STAGE CLOSING OF SHARE EXCHANGE TRANSACTION ...
2/24/2009Editorial from Minesite (February 16, 09)
1/27/2009Announces Share Exchange Transaction With Grafton Resource I...
1/20/2009Change of Address & Registered Office
9/1/2008Reports Results For The Three And Six Months Ended June 30, ...
8/21/2008Upgrades San Jose Resource Estimate
8/11/2008Exploration Update - San Jose
7/8/2008Provides Near-Term Production Potential on the San Jose Proj...
6/24/2008Engages CHF Investor Relations
9/13/2007Shoots for the Stars with International Mining Magazine
9/11/2007San Jose Exploration Results
9/5/2007Aquisition of Additional Concession Areas at San Jose
8/30/2007Q2 Press Release
8/13/2007New Near-Surface Silver Oxide Mineralization Discovered at S...
5/29/2007Calicanto Phase-One Drill Results
4/23/2007Tepal Drilling
5/26/2006is admitted to AIM
3/24/2006Newsletter March 2006
1/25/2006Newsletter Jan 2006
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (AGQ.V)LSE (AGQ.L)
0.130-7.14%0.170-0.58%
TSX-V
CA$ 0.130
12/01 15:57 -0.010
-7.14%
Prev close Open
0.140 0.140
Low High
0.130 0.140
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.130 -%
Volume 1 month var.
153,875 -%
24hGold TrendPower© : -15
Produces Lead - Silver - Zinc
Develops
Explores for Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/26/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :