RENO, NV--(Marketwired - November 13, 2014) - Ram Power, Corp. (RPG.TO) ("Ram Power" or the "Company"), a renewable energy company focused on the development, production and sale of electricity from geothermal energy, is pleased to announce its operating results for the quarter ended September 30, 2014. This earnings release should be read in conjunction with Ram Power's financial statements, and management's discussion and analysis ("MD&A"), which are available on the Company's website at www.ram-power.com and have been posted on SEDAR at www.sedar.com.

HIGHLIGHTS

San Jacinto-Tizate Project Overview

  • The San Jacinto-Tizate Power Plant generated 115,309 (net) MWh resulting in revenue of $12.9 million for the quarter ended September 30, 2014 (an increase of 15% over the same period in 2013) compared to revenue of $11.2 million in the third quarter 2013. Revenue for the nine months ended September 30, 2014 was $35.3 million compared with $36.3 million for the same period in 2013. 

Nicaragua Government and Stakeholder Initiatives

  • Minimum required electricity generation
  • There is a requirement in the San Jacinto project exploitation agreement that the amount of electricity generated by the plant be at least above a minimum prescribed amount. Until November 10, 2014, that minimum prescribed amount was 90% of the 72 MW (net)/day capacity of the plant. The Company has been experiencing resource declines in certain of its wells at the San Jacinto project, and as a result has not been operating above the minimum capacity required by the exploitation agreement. On April 18, 2014, the Nicaragua government agreed that the failure to meet the minimum capacity was a result of a force majeure and accordingly the Company has been relieved until May 31, 2016 from any penalties that would otherwise be applicable on account of the failure to meet the minimum electricity production. 
  • On November 10, 2014, the power purchase agreement between the Company and Disnorte-Dissur was amended to modify the penalty formula described above by: (i) reducing the capacity factor from 90% to 70%; (ii) changing from a binomic charge to a mononic charge; and (iii) defining parasitic consumption as undelivered energy not attributable to the seller. As a result, as long as the amount of electricity generated by the plant at its San Jacinto project is above 45 MW (net)/day, the Company will not be in violation of the covenants in its exploitation agreement relating to production. However, this change does not affect the minimum electricity production required under the Company's credit agreements, which minimum is an average of 55 MW (net)/day.
  • Concession Extension for San Jacinto-Tizate
  • In October 2014, Reform Law No. 443 was passed by the Congress of Nicaragua which, among other things, results in the extension of the Company's concession period from 25 years to 30 years (with the ability to apply at the end of the concession period for a further 30 year extension). As a result, the expiry of the San Jacinto concession has now been extended from the year 2026 to 2031 (with the ability to apply for a further extension until the year 2061). In addition, the Company is entitled to an extension under its power purchase agreement to the year 2029 (and not until 2031 on account of the fact that the license of distribution company only runs through 2029). 

Ram Power Corporate Update

  • As previously disclosed, Ram Power formed a Mergers and Acquisitions Committee in November 2013 to explore and evaluate a broad range of strategic alternatives for the Company to enhance shareholder value. The Mergers and Acquisitions Committee is tasked with exploring opportunities to increase operational efficiencies, strategic partnerships, asset sales or purchases, joint ventures, the sale of the Company, alternative operating models, or continuing with the current business plan, among other potential alternatives. 

"We continue to press forward with our interested parties in an effort to bring to a close our strategic Process for the Company," stated Antony Mitchell, Executive Chairman of Ram Power. "All parties have shown an absolute willingness to bring this process to a close with as much expediency as possible for the benefit of all our stakeholders."

FINANCIAL OVERVIEW
The financial results of Ram Power for the three and nine months ended September 30, 2014 and 2013 are summarized below:

  Three months ended  Six months ended  
(all figures in U.S dollars) September 30, 2014  September 30, 2013  September 30, 2014  September 30, 2013  
Total revenue $12,882,768  $11,241,582  $35,326,399  $36,341,952  
Other direct costs  (1,816,726 ) (1,814,764 ) (5,028,535 ) (4,517,831 )
Depreciation and amortization of plant assets  (6,607,355 ) (6,119,558 ) (19,536,407 ) (18,379,078 )
General and administrative expenses  (1,468,128 ) (2,043,338 ) (4,900,179 ) (7,647,583 )
Other operating costs  (555,690 ) (428,305 ) (846,264 ) (390,972 )
Operating income  2,434,869   835,617   5,015,014   5,406,488  
Loss on impairment  -   315,000   2,615,342   (18,348,852 )
Gain on warrant liability valuation  431,098   2,592,864   652,514   422,258  
Gain on prepayment option valuation  -   3,026,544   (1,357,000 ) (4,583,518 )
Other gains (losses)  1,359,077   (12,542,464 ) 1,879,298   (498,345 )
Current and deferred tax expense  (1,870,731 ) (2,056,107 ) (5,622,508 ) (6,168,323 )
Total loss and comprehensive loss  (3,636,423 ) (13,930,986 ) (15,993,975 ) (45,849,449 )
Total loss and comprehensive loss per share  ($0.01 ) ($0.05 ) ($0.04 ) ($0.15 )
              
        As at September 30, 2014  As at December 31, 2013  
Total assets         $430,739,646  $457,959,404  
Long-term debt          44,226,795   239,841,360  
Total liabilities          284,175,796   295,537,930  
Cash          16,845,286   22,549,994  
Working capital          (183,900,668 ) 6,329,850  

For the quarter ended September 30, 2014, the Company reported revenue of $12.9 million and a total loss and comprehensive loss of $3.6 million, or $(0.01) per share, compared to revenue of $11.2 million and a total loss and comprehensive loss of $13.9 million, or $(0.05) per share, for third quarter 2013. The 15% increase in revenue resulted from wells offline for the drilling remediation program in 2013. Total loss and comprehensive loss for quarter ended September 30, 2014 was impacted by the non-cash depreciation and amortization expense of $6.6 million, deferred tax expense of $1.9 million, offset by unrealized foreign exchange gains on translation of the Company's debentures of $2.2 million. 

The Company recognized a net loss of $16 million for the nine months ended September 30, 2014 compared to a net loss of $45.9 million for the same period in 2013, which resulted in a decreased loss of $29.9 million due to various factors, including $21 million decrease related to impairment losses on the Geysers project and $5.8 million decrease related to unrealized other gains and losses from foreign exchange and valuation of the Company's derivatives. Revenue for the nine months ended September 30, 2014 of $35.3 million was $1 million less than revenue for the same period in 2013 of $36.3 million. The drilling remediation program and turbine overhaul in 2014 contributed to the decline.

For the nine months ended September 30, 2014, the Company had net operating cash inflows of $7.6 million, net investing cash inflows of $0.5 million and net financing cash outflows of $13.8 million, which combined for a net decrease in cash of $5.7 million. The Company expended $6.7 million for additions to geothermal properties, principally related to San Jacinto drilling and turbine overhaul costs. At September 30, 2014, the Company had cash of $16.8 million, of which $14.3 million was held for current use in the San Jacinto project.

The Company had negative working capital of $183.9 million as at September 30, 2014 as a result of project debt compliance issues allowing the Company's lenders to accelerate the credit facilities at their discretion. Because of continuing losses and negative working capital, the Company's continuance as a going concern is dependent upon its ability to obtain waivers or restructure the San Jacinto project credit facilities (including by way of lowering the requirement to achieve a minimum level of electricity production at the San Jacinto project from the current minimum of 55 MW (net)/day), obtain the consent of the holders of its Debentures to delay the December 31, 2014 requirement to pay interest on the Debentures until such time as the Company has raised additional cash, and obtain adequate additional financing. 

The Company will need to raise additional capital through the strategic process in order to continue funding operating and exploration and development expenditures. However, it is not possible to predict whether financing efforts will be successful on terms acceptable to the Company (or at all) or if the Company will attain profitable levels of operations. The unaudited interim condensed consolidated financial statements being released today do not give effect to adjustments that would be necessary should the Company be unable to continue as a going concern.

As a result of the continuing strategic process of the Company, there will not be a quarterly earnings call with management for the third quarter. The Company will provide an update with respect to the strategic process at such time as developments require disclosure in accordance with applicable securities laws.

About Ram Power, Corp.

Ram Power is a renewable energy company engaged in the business of acquiring, exploring, developing, and operating geothermal properties, and has interests in geothermal projects in the United States, Canada, and Latin America. 

USE OF NON-GAAP MEASURES

Certain non-GAAP measures referenced in this news release have no standardized meaning under International Financial Reporting Standards ("IFRS") and, therefore, are unlikely to be comparable to similar measures presented by other issuers. Where we reference non-GAAP measures, we provide definitions. For example, EBITDA is commonly defined as earnings before interest, taxes, depreciation and amortization. EBITDA is most directly comparable to the GAAP measure operating income or loss, except depreciation and amortization expenses of plant assets are excluded in the calculation of EBITDA. Accordingly, where EBITDA measures are disclosed by the Company, they equal operating income or loss plus depreciation and amortization of plant assets. Although a non-GAAP measure, management believes users of the Company's financial information find EBITDA useful in assessing the Company's financial performance. In the Company's earnings releases, consolidated financial statements and MD&As, unless otherwise noted, all financial data is prepared in accordance with IFRS.

Cautionary Statements 

This news release contains certain "forward-looking information" which may include, but is not limited to, statements with respect to future events or future performance, management's expectations regarding the Company's growth, results of operations, estimated future revenue, requirements for additional capital, revenue and production costs, future demand for and prices of electricity, business prospects and opportunities. In addition, statements relating to estimates of recoverable geothermal energy "reserves" or "resources" or energy generation are forward-looking information, as they involve implied assessment, based on certain estimates and assumptions, that the geothermal resources and reserves described can be profitably produced in the future. Such forward-looking information reflects management's current beliefs and is based on information currently available to management. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "predicts", "intends", "targets", "aims", "anticipates" or "believes" or variations (including negative variations) of such words and phrases or may be identified by statements to the effect that certain actions "may", "could", "should", "would", "might" or "will" be taken, occur or be achieved. A number of known and unknown risks, uncertainties and other factors may cause the actual results or performance to materially differ from any future results or performance expressed or implied by the forward-looking information. Such factors include, among others, general business, economic, competitive, political and social uncertainties; the actual results of current geothermal energy production, development and/or exploration activities and the accuracy of probability simulations prepared to predict prospective geothermal resources; changes in project parameters as plans continue to be refined; possible variations of production rates; failure of plant, equipment or processes to operate as anticipated; accidents, labor disputes and other risks of the geothermal industry; political instability or insurrection or war; labor force availability and turnover; delays in obtaining governmental approvals or in the completion of development or construction activities, or in the commencement of operations; as well as those factors discussed in the section entitled "Risk Factors" in the Company's Annual Information Form. These factors should be considered carefully and readers of this news release should not place undue reliance on forward-looking information.

Although the forward-looking information contained in this news release is based upon what management believes to be reasonable assumptions, there can be no assurance that such forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. The information in this news release, including such forward-looking information, is made as of the date of this news release and, other than as required by applicable securities laws, Ram Power assumes no obligation to update or revise such information to reflect new events or circumstances.

Read the rest of the article at finance.yahoo.com
Data and Statistics for these countries : Canada | Nicaragua | All
Gold and Silver Prices for these countries : Canada | Nicaragua | All

Ram Power Corp.

CODE : RPG.TO
ISIN : CA7513081074
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Ram Power is a gold and copper development stage company based in Canada.

Ram Power develops gold, copper and in Nicaragua, and holds various exploration projects in Canada.

Its main asset in development is SAN JACINTO-TIZATE in Nicaragua and its main exploration property is ANA in Canada.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Ram Power Corp.
4/20/2015, Corp. Announces Private Placement and Recapitalization Tra...
3/20/2013, Corp. Announces Anticipated Closing Date for Senior Debent...
3/2/2011. Announces Closing of $50 Million Credit Facility
Nominations of Ram Power Corp.
9/30/2011, Corp. Announces Selby F. Little as Acting Chief Financial ...
9/28/2011, Corp. Announces Shuman Moore as President and Chief Execut...
Financials of Ram Power Corp.
10/31/2013Announces Release Date for Third Quarter Results
8/7/2013Announces 2013 Second Quarter Results
5/16/2013Announces 2013 First Quarter Results
4/25/2013Announces Release Date for First Quarter Results
3/27/2013Announces 2012 Year End Results
3/11/2013Announces Release Date for 2012 Year End Results
1/28/2013Announces a Corporate Reorganization and Strategic Initiativ...
11/1/2012Announces Release Date for Third Quarter Results
8/14/2012Announces Continued Positive Results With Record Revenue and...
8/2/2012Announces Release Date for Second Quarter Results
5/15/2012Announces Record First Quarter 2012 Results
5/3/2012Announces Release Date for First Quarter Results
3/31/2012Announces 2011 Year End Results
3/12/2012Announces Release Date for 2011 Year End Results
8/15/2011Announces Second Quarter 2011 Results
8/9/2011Announces Release Date for Second Quarter 2011 Results
6/6/2011Announces Release Date for First Quarter 2011 Results
4/1/2011Announces Fourth Quarter and 2010 Year End Results
Project news of Ram Power Corp.
8/15/2013(San Jacinto-tizate), Corp. Announces Updates for the San Jacinto-Tizate Project
7/18/2013(San Jacinto-tizate)Commences Drilling Operations at San Jacinto-Tizate
2/7/2013(San Jacinto-tizate), Corp. Announces Updates for the San Jacinto-Tizate Project
11/5/2012(San Jacinto-tizate)Announces Update for Its San Jacinto-Tizate Project
10/10/2012(San Jacinto-tizate)Announces Tariff Increase for San Jacinto-Tizate Project
7/26/2012(San Jacinto-tizate)Receives Initial Equity Distribution From Its San Jacinto-Ti...
6/7/2012(San Jacinto-tizate)Announces Update for San Jacinto-Tizate Project and Corporat...
2/21/2012(San Jacinto-tizate), Corp. Announces Updates for the San Jacinto-Tizate Project
2/6/2012(San Jacinto-tizate), Corp. Announces Updates for the San Jacinto-Tizate Project
3/25/2011(San Jacinto-tizate) Announces Successful Drilling Results at San Jacinto-Tizate
2/7/2011(San Jacinto-tizate) Announces General Corporate Update
Corporate news of Ram Power Corp.
9/28/2015POLARIS INFRASTRUCTURE ANNOUNCES SIGNING OF RIG SERVICES CON...
9/28/2015POLARIS INFRASTRUCTURE ANNOUNCES CHANGE OF AUDITOR
4/20/2015IIROC Trade Resumption - RPG
4/20/2015IIROC Trading Halt - RPG
4/20/2015Ram Power, Corp. Announces Private Placement and Recapitaliz...
3/30/2015RAM POWER ANNOUNCES 2014 YEAR END RESULTS
3/25/2015RAM POWER ANNOUNCES RELEASE DATE FOR YEAR END 2014 RESULTS
1/26/2015TSX Delisting Review - Ram Power, Corp. (Symbols: RPG and RP...
1/26/2015RAM POWER ANNOUNCES NOTIFICATION OF TSX CONTINUED LISTING RE...
1/26/2015Ram Power Announces Notification of TSX Continued Listing Re...
12/31/2014Ram Power Announces Strategic Process and Corporate Update
11/13/2014Ram Power Announces 2014 Third Quarter Results
11/13/2014RAM POWER ANNOUNCES 2014 THIRD QUARTER RESULTS
11/10/2014RAM POWER ANNOUNCES RELEASE DATE FOR THIRD QUARTER 2014 RESU...
11/10/2014Ram Power Announces Release Date for Third Quarter 2014 Resu...
8/12/2014Ram Power Announces 2014 Second Quarter Results
8/6/2014Ram Power Announces Release Date for Second Quarter Results
6/17/2014Ram Power Announces Results of Annual Meeting
5/27/2014Ram Power, Corp. Announces Completion of 30-Day Stabilizatio...
5/15/2014Ram Power Announces 2014 First Quarter Results
4/28/2014Ram Power, Corp. Announces Commencement of 30-Day Stabilizat...
4/22/2014Ram Power, Corp. Completes Sale of Geysers Project
4/7/2014Ram Power, Corp. Announces Stock Purchase Agreement With US ...
4/1/2014Ram Power Announces 2013 Year End Results
10/2/2013, Corp. Announces Operational Update Including:
8/20/2013(San Jacinto-tizate), Corp. Announces Update for San Jacinto-Tizate
8/1/2013(San Jacinto-tizate), Corp. Announces Conversion of San Jacinto-Tizate Phase II ...
7/2/2013, Corp. Announces Agreement With Project Lenders to Extend C...
6/18/2013Announces Results of Annual and Special Meeting
6/4/2013, Corp. Announces Signing of Drilling Contract and Agrees Wi...
3/27/2013, Corp. announces closing of C$50.9 million Senior Debenture...
12/12/2012Announces Termination of Power Purchase Agreement for Clayto...
3/27/2012, Corp. Announces the Signing of a Letter of Intent With SNC...
3/26/2012, Corp. Announces the Signing of a Mandate Letter With IFC f...
2/23/2012, Corp. Announces Updates for the Casita Project
1/9/2012(San Jacinto-tizate), Corp. Announces Commercial Operation of the Phase I Expans...
12/22/2011(San Jacinto-tizate), Corp. Announces Synchronization of the Phase I Expansion a...
12/6/2011, Corp. Announces Execution of Amendments to Credit Facility
10/26/2011, Corp. Announces San Jacinto Project, Casita Project and Ge...
9/15/2011, Corp. Announces San Jacinto Project and Corporate Finance ...
8/15/2011(San Jacinto-tizate)Confirms Resource and Closes $160 Million Credit Facility fo...
6/10/2011Northern California Power Agency Signs Power Purchase Agreem...
6/9/2011(San Jacinto-tizate), Corp. Announces Successful Production Test Results at San ...
6/8/2011, Corp. Announces Resolution of Credit Facility Non-Complian...
3/29/2011Northern California Power Agency Approves Power Purchase Agr...
3/24/2011(San Jacinto-tizate), Corp. Announces Successful Drilling Results at San Jacinto...
3/2/2011, Corp. Announces Closing of $50 Million Credit Facility
2/7/2011 Announces General Corporate Update
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (RPG.TO)
0.005+0.00%
TORONTO
CA$ 0.005
05/15 15:59 -
0%
Prev close Open
0.010 0.005
Low High
0.005 0.005
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.005 -50.00%
Volume 1 month var.
2,743,935 -50.00%
24hGold TrendPower© : 21
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.49+0.13%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.61+0.52%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54+2.64%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.60-1.14%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.03-2.08%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.26+4.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.22+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.84+0.55%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 50.34-0.16%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :