SCOTTSDALE, AZ--(Marketwired - June 17, 2013) - International Minerals Corporation (TSX: IMZ) (SWISS: IMZ) (the "Company" or "IMZ") announces an update of the July 2012 feasibility study for the Gemfield gold deposit ("Updated Study"), located on its 100%-owned Goldfield gold property in Nevada.

Compared to the July 2012 feasibility study, the Updated Study reports:

  • Estimated Proven and Probable mineral reserves have increased by 11% from 511,000 to 567,000 gold ounces (contained within 17.3 million tonnes ("Mt") at an average grade of 1.0 grams per tonne ("g/t") gold).

  • Annual gold production estimate has increased by 15% from 66,000 to 76,000 ounces.

  • Heap leach processing rate estimate has increased by 25% from 6,000 tonnes per day ("tpd") to 7,500 tpd.

  • Operating costs per tonne of ore processed have decreased by 8% from $15.67 to $14.38.

  • Total cash costs per ounce of gold remain unchanged at $612.

  • Initial capital cost (including $24 million to re-align the highway) has increased by 14% from $133 million to $151 million.

  • Pre-tax net present value at a 5% discount rate ("NPV5") has increased by 12% from $102 million to $114 million. Post-tax NPV5 has increased by 23% from $75 million to $92 million.

  • Internal rate of return ("IRR") is higher, both on a pre-tax basis (at 23%) and post-tax basis (at 20%), compared to 22% and 18%, respectively, in the July 2012 feasibility study.

A base price of $1,350 per gold ounce was used in both studies to estimate the economic parameters.

A detailed comparison of the July 2012 feasibility study (see IMZ news release dated July 17, 2012) and the Updated Study is shown in Table 1.

Commenting on the results of the Updated Study, Steve Kay, President/CEO of IMZ, said, "It is very encouraging to see in the Updated Study that Gemfield can produce close to 15% more gold ounces per year compared to the 2012 feasibility study without an increase in total cash costs per ounce. In addition, overall project economics, measured by both IRR and NPV, have improved, showing that the 14% increase in capital cost in the Updated Study is more than offset by reduced operating costs and increased production."

Updated Study Details

The Updated Study for Gemfield was reviewed by the independent engineering firm, Micon International Limited of Toronto, Canada. M3 Engineering and Technology of Tucson, Arizona have been awarded the contract for the engineering, procurement and construction management ("EPCM") of the Gemfield project. SRK of Reno, Nevada is responsible for the engineering of the heap leach pads and Atkins, also in Reno, is responsible for the realignment of Highway 95. Basic engineering is substantially complete on the process facilities and heap leach site and is the basis for the capital cost estimate used in Table 1.

Table 1. Gemfield - Updated Study Data (all in US Dollars).

Item   Units   July 2012 Feasibility Study   June 2013 Updated Study
Base Case gold price   $ per ounce   $1350   $1350
Mine life   years   6.5   6.3
Average annual gold production   ounces/year   66,000   76,000
Life-of-mine gold production   ounces   430,000   483,000
Plant processing rate   Tonnes per day/year   6,000 / 2,190,000   7,500 / 2,734,000
Average metallurgical recovery - gold   %   84%   85%
Initial capital cost 1   $ millions   $133   $151
Sustaining capital cost   $ millions   $16   $13
Direct site operating costs 2   per tonne processed   $15.67   $14.38
Cash operating costs 2,5   per ounce Au   $526   $524
Total cash costs 2,5   per ounce Au   $611   $612
Payback period (non-discounted)   years   3.4   3.2
IRR pre-tax/post-tax 3,4   %   22% / 18%   23% / 20%
Pre-tax /post-tax cash flow (non-discounted) 3,4   $ millions   $168 / $132   $185 / $156
Pre-tax/post-tax NPV, 5% discount rate 3,4   $ millions   $102 / $75   $114 / $92
Pre-tax/post-tax NPV, 7% discount rate 3,4   $ millions   $83 / $59   $92 / $73
             
1)   Initial capital is based on Q1 2013 estimates and includes $24 million for the realignment of US Highway 95, $95 million for plant and infrastructure, $23 million for the mine and $9 million in Owners' costs. The initial capital estimate includes $14 million in contingency allowance. No escalation factors have been applied. IMZ management estimates that a two-year escalation factor (assuming production in late 2015) could result in capital costs increasing by up to $15 million.
2)   Direct site operating costs per tonne of ore comprise: mining ($6.65), processing ($5.75) and G&A ($1.99). Cash operating costs include direct site costs plus estimates of transport and refining charges. Total cash costs include cash operating costs plus a 5% Net Smelter Return ("NSR") royalty and the Nevada Net Proceeds on Minerals tax. "Cash operating costs" and "total cash costs" follow guidelines set by the Gold Institute.
3)   Cash flow and NPV estimates include a 5% NSR royalty payable to an arm's length third party.
4)   After-tax estimates include federal income taxes.
5)   By-product accounting was used in the July 2012 Feasibility Study. The Updated Study does not include any by-product silver credit as silver was not modeled as its content is not significant.

Sensitivity of the Gemfield project economics to gold price is summarized below in Table 2. The base case gold price of $1,350 per ounce is highlighted.

Table 2. Gemfield Update Study: Pre-tax Sensitivity Analysis to Gold Price (base case in bold)

Gold Price ($/oz)   $1,100   $1,350   $1,600   $1,850
IRR   10%   23%   34%   45%
Cash Flow ($ millions)   76   185   294   403
NPV 5% ($ millions)   31   114   196   279
NPV 7% ($ millions)   18   92   167   241

Mining

Standard open pit technology using 50 tonne haul trucks to create an ultimate pit with approximate dimensions of 900 meters ("m") by 1,000m and a maximum depth of 170m. Waste material has largely been characterized as benign in terms of acid rock drainage. The average life-of-mine waste-to-ore (strip) ratio is approximately 2.1 to 1, with inter-ramp slope angles ranging from 40 to 45 degrees.

Processing

Three-stage crushing (100% passing 1.0 inch) and cyanide heap leaching followed by carbon adsorption/stripping, electrowinning and smelting to produce gold/silver doré bars for shipment to an off-site refinery. Metallurgical testwork by previous owners of the Goldfield property, combined with IMZ's detailed testwork based on samples from the recent drill programs, form the basis for the process design criteria.

Environmental and Permitting
The Plan of Operations ("PoO") document is close to completion and will be submitted to the Bureau of Land Management ("BLM") within the next 60 days, at which time the Environmental Impact Statement ("EIS") process will commence with an estimated timeline for approval of 15 to 18 months. Permitting should start shortly after the EIS process commences and would run in parallel with the EIS process. Dependent on the preceding timelines, production might be expected in late 2015.

Updated Mineral Reserve and Resource Estimates

Mineral Reserve Estimate

The updated mineral reserve estimate for the Gemfield deposit is shown in Table 3 and was calculated by Sam Shoemaker SME, of Micon International Limited an independent Qualified Person. The updated reserve estimate represents a 21% increase in tonnage and an 11% increase in the contained ounces of gold compared to the previously-published reserve estimate (July 17, 2012). The increase in mineral reserves at Gemfield is primarily due to additional drilling at the southeast part of the Gemfield deposit.

Table 3. Gemfield Deposit - Estimated Mineral Reserves (as of June 17, 2013) at a gold price of $1,450 per ounce and an average cut-off grade of 0.25 g/t Gold.

Reserve Estimate Category   Tonnes   Gold Grade (g/t)   Gold Ounces
Proven   13,751,000   1.1   493,000
Probable   3,509,000   0.7   74,000
Proven and Probable   17,260,000   1.0   567,000
             
1)   The mineral reserves were estimated at $1,450 per ounce of gold, based on optimization and scheduling work conducted in March of 2013, when the spot gold price was approximately $1,600 per ounce of gold. IMZ management believes that using $1,350 per ounce of gold for the pit optimization would not significantly change the estimated reserves or mine schedule.
2)   Numbers are rounded to reflect the precision of a reserve estimate.
3)   The mineral reserves were classified using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), Standards on Mineral Resources and Reserves,
4)   IMZ is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that materially affect the validity of these reserve estimates.

Mineral Resource Estimate

Table 4 shows an updated mineral resource estimate for the Gemfield deposit. It was calculated by R. Mohan Srivastava (P.Geo), an independent consultant and Qualified Person.

Table 4. Gemfield Deposit - Estimated Mineral Resources using a 0.25 g/t cut-off (as at June 17, 2013).

Resource Estimate Category   Tonnes   Gold Grade (g/t)   Gold Ounces
Measured   15,500,000   1.0   524,000
Indicated   9,100,000   0.5   157,000
Measured and Indicated   24,590,000   0.9   681,000
Inferred   1,080,000   0.5   18,000
             
1)   Numbers are rounded to reflect the precision of a resource estimate.
2)   Estimated mineral resources that are not mineral reserves do not have demonstrated economic viability.
3)   To limit the influence of individual samples, high-grade assays were capped at 40 g/t in the main mineralized zone, and at 3 g/t outside this zone.
4)   Estimated dry bulk densities of 2.21 to 2.37 tonnes per cubic meter ("t/m3) were used for mineralized material.
5)   The grades were interpolated using the "Ordinary Kriging" estimation technique.
6)   The contained metal estimates remain subject to factors such as mining dilution and losses and process recovery losses.
7)   The mineral resources were classified using the CIM Standards on Mineral Resources and Reserves,
8)   The mineral resources are inclusive of the mineral reserves shown in Table 3.

The resource estimation was conducted using all drill assay data available as of mid-January 2013, representing a total of 655 core and reverse circulation drill-holes totaling approximately 94,500m.

The updated resource estimate represents a 44% increase in Measured and Indicated tonnage and a 18% increase in contained gold ounces compared to the previously-published resource estimate (July 17, 2012). The increase in estimated mineral resources at Gemfield is primarily due to additional drilling in the southeast part of the Gemfield deposit and the use of a lower reporting cut-off grade that corresponds to the most recent technical and economic data.

The ordinary kriging method was used for grade interpolation with the search oriented parallel to the mineralized zone, following its undulations and with a radius of 53m in the N25°E direction, 30m in the N65°W direction and 6m in the vertical direction, equal to the ranges of the variogram. A parent block size of 6m×6m×6m was used for estimation, with sub-blocks as small as 1.5m×1.5m×1.5m used to capture the small undulations in the main mineralized zone. 6m×6m×6m blocks were used for inventorying and reporting the mineral resource. All classified mineral resources lie in the oxide zone.

Resource classification was based on the following criteria:

  • Measured Resources have blocks within 1/3 of the variogram range of a drill-hole sample from at least four different drill holes in at least four octants.
  • Indicated Resources have blocks that are within 2/3 of the variogram range of a drill-hole sample from at least two drill holes in at least four octants.
  • Inferred resources have blocks that are within the variogram range of a drill-hole sample.

General

The technical information reported in this news release was reviewed by IMZ's Qualified Person, VP Corporate Development, Nick Appleyard. A National Instrument 43-101 Technical Report, completed by Micon International Limited, will be filed by IMZ on SEDAR within 45 days of the date of this news release.

Cautionary Statements:

Some of the statements contained in this release are "forward-looking statements" within the meaning of Canadian securities law requirements. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause our actual results, performance or achievements to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements in this release include statements regarding estimates of capital and operating costs; economic returns; timing and significance of future cash flows and revenue from the project; timing and scale of production and processing; and resource and reserve estimates. Factors that could cause actual results to differ materially from anticipated results include risks and uncertainties such as: risks relating to estimates of production and processing rates; risks relating to estimates of mineral resources and reserves; risks relating to capital and operating costs; risks relating to obtaining mining and environmental permits; mining and development risks; risk of commodity price fluctuations; estimates of taxes payable; political and regulatory risks; and other risks and uncertainties detailed in the Company's Annual Information Form for the year ended June 30, 2012, which is available at www.sedar.com under the Company's name.

A number of measures reported above are non-IFRS (International Financial Reporting Standards) financial measures which include: direct site operating costs per tonne; cash operating costs per ounce; and total cash operating costs per ounce. Management believes these items may be useful measures to analyze the economics of the Gemfield project, but readers of this news release should not rely on them in isolation.

The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise.



For additional information, contact:

In North America
Paul Durham
Vice President Corporate Relations
Tel: +1 203 883 8359

Or email us at: Email Contact

In Europe
Oliver Holzer
Marketing Consultant
+41 44 853 00 47

Web Site: http://www.intlminerals.com

Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

International Minerals Corporation

PRODUCER
CODE : IMZ.TO
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Intl. Minerals is a producing company based in United states of america.

Intl. Minerals produces gold and silver in Peru, develops copper, gold and silver in Ecuador and in Peru, and holds various exploration projects in Ecuador.

Its main asset in production is PALLANCATA in Peru and its main assets in development are RIO BLANCO - ALEXANDRA NORTH, RIO BLANCO - SAN LUIS and GABY in Ecuador and INMACULADA in Peru.

Intl. Minerals is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 270.7 millions as of today (US$ 252.7 millions, € 183.7 millions).

Its stock quote reached its lowest recent point on June 01, 2001 at CA$ 0.82, and its highest recent level on April 29, 2011 at CA$ 8.00.

Intl. Minerals has 95 653 001 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of International Minerals Corporation
2008 Annual report
Renewal Annual Information Form 2007
Nominations of International Minerals Corporation
4/8/2010Appointment of New VP
Financials of International Minerals Corporation
9/30/2013Reports Operating and Financial Results for the Fiscal Year ...
5/16/2013Reports Third Fiscal Quarter Ending March 31=2C 2013 Financi...
8/12/2010(Pallancata)Reports Strong Pallancata Mine Operating Results
11/17/2009(Pallancata)First Quarter Net Income of $1.2 Million; Net Equity Earning...
8/24/2009(Pallancata)IMZ Reports Strong Pallancata Operating Results & Initial US...
11/18/2008Sept. 30, 2008 Financial Results
5/20/2008 Realizes $4.12 Million ($0.04 per share) in Net Income for ...
Project news of International Minerals Corporation
7/17/2013s 2013 Cost Reduction Plans and Project Updates
6/25/2013Closes Sale of Rio Blanco Property in Ecuador
3/25/2013(Inmaculada)Announces Closing of $140 Million Loan Facility for Inmacula...
11/2/2012s Development of Goldfield Property
1/11/2012(Inmaculada)IMZ Announces Positive Feasibility Study at Inmaculada Gold-...
7/28/2010(Inmaculada)Reports New High-Grade Drill Results
5/5/2010(Inmaculada)New Drill Results
4/30/2010(Pallancata)Quarterly Production
3/26/2010(Pallancata)Reports Updates Reserve/Resource Estimates at Pallancata Sil...
2/24/2010(Pallancata)Record Production
2/4/2010(Inmaculada)Increased Resource Estimate at Inmaculada Project
11/12/2009(Pallancata)Record Quarterly Production at Pallancata Mine, Peru
7/16/2009(Pallancata)IMZ Update at Pallancata Mine, Peru and Gaby project, Ecuado...
5/23/2009(Pallancata)Got Gold? IMZ Reserves at 1M gold equiv oz. Investing in Gol...
5/15/2009(Pallancata)IMZ Announces 1st Quarter Production Results- Pallancata Min...
2/19/2009(Rio Blanco - San Luis)Updated Costs at Rio Blanco
2/17/2009(Pallancata)Record Production from Pallancata Mine, Peru
1/26/2009(Gaby)IMZ Announces Optimization Study Results-Gaby Project, Ecuad...
11/5/2008(Pallancata)Q3 Production Results for Pallancata Mine, Peru
10/2/2008(Pallancata) Reports Low Cash Costs at Pallancata Silver Mine, Peru
8/25/2008(Pallancata) Announces Major Increase in Reserves at Pallancata Mine
7/24/2008(Pallancata)Strong Production Results from Pallancata Mine
6/24/2008(Rio Blanco - Alexandra North)Reports High-Grade Gold Drill Results at Rio Blanco Project
Corporate news of International Minerals Corporation
9/19/2013Provides Gemfield Permitting Update and Earnings Guidance fo...
6/18/2013Announces Update of Feasibility Study at Goldfield=2C Nevada
5/2/2013Provides Earnings Guidance for Third Fiscal Quarter Ending M...
3/15/2013(Pallancata)s Reserve and Resource Estimates at Pallancata Silver Mine
2/14/2013Reports Second Fiscal Quarter Ending December 31, 2012 Finan...
1/30/2013(Pallancata)Reports Production Results From Pallancata Mine for Quarter ...
11/7/2012Provides Earnings Guidance for First Fiscal Quarter Ended Se...
7/17/2012Announces Positive Feasibility Study at Goldfield Gold Proje...
5/30/2012IMZ Reports Drill Results from Converse Project, Nevada
5/23/2012Announces Closing of Sale of Ruby Hill Royalty
5/15/2012Reports $6.8 Million in Pre-Tax Income for Third Fiscal Quar...
4/12/2012(Pallancata)IMZ Updates Reserve & Resource Estimates at Pallancata Mine,...
4/11/2012(Pallancata)s Reserve and Resource Estimates at Pallancata Silver Mine
3/20/2012Announces Metallurgical and Drill Results From Goldfield Pro...
2/15/2012IMZ Reports $12M in Pre-Tax Income for Quarter Ended Dec 31,...
2/14/2012Reports $12.0 Million in Pre-Tax Income for Second Fiscal Qu...
12/20/2011IMZ Announces Positive Preliminary Economic Assessment at Co...
12/15/2011IMZ Reports $15.2M in After-Tax Net Income for Quarter Ended...
11/29/2011Reports Drilling and Metallurgical Results From Converse Gol...
10/12/2011to Repurchase Shares
9/28/2011Reports Record Earnings of $58.4 Million Pre-Tax Net Income ...
8/24/2011Reports Increased Resource Estimate at Converse Gold Project...
8/18/2011on Rio Blanco Contract Negotiations With Ecuadorian Governme...
7/6/2011IMZ Reports Drill Results from Converse Project, Nevada
7/5/2011Reports Drill Results From Converse Project, Nevada, Includi...
7/1/2011IMZ Announces Expiry of Agreements with Chinese Company
6/17/2011IMZ Announces Drill Results from Goldfield Project, NV
5/17/2011IMZ Reports $12.9 Million in Pre-Tax Net Income for 3rd Fisc...
4/7/2011(Pallancata)IMZ Updates Reserve and Resource Estimates at Pallancata Sil...
2/25/2011(Inmaculada)IMZ Reports Increased Resources at Inmaculada Project
2/24/2011Reports Increased Resource Estimate at Inmaculada Gold-Silve...
2/15/2011IMZ Reports Record Net Income for Quarter Ended Dec 31, 2010
5/21/2010Commences Drilling at Goldfield, Nevada
5/18/2010US$3.3 Million Net Income for Third Fiscal Quarter
1/20/2010Drill Results for Recently Acquired Inmaculada Project
1/13/2010Completes Transaction to Acquire Ventura Gold
12/18/2009Ventura Shareholders Approve Arrangement Agreement
12/17/2009Resignation of VP
9/29/2009IMZ Year-End Financials Web Links
9/12/2009Webcasts from Denver Gold Forum & CEO Interview
8/20/2009IMZ Included in Swiss Performance Index of SIX
5/20/2009IMZ Reports Net Income of US$2.0 million for 3rd Quarter End...
2/20/2009Meet International Minerals' CEO Steve Kay at BMO Conference
2/18/2009Net Income $4.8M ($0.05 per share) for Fiscal 2Q
12/18/20082008 Review and 2009 Business Plans
9/30/2008 Reports Strong Year-End Balance Sheet
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (IMZ.TO)FRANKFURT (MIW.F)
2.83-1.05%1.88-2.24%
TORONTO
CA$ 2.83
12/27 15:59 -0.030
-1.05%
Prev close Open
2.86 2.80
Low High
2.80 2.86
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  2.83 -%
Volume 1 month var.
4,354 -%
24hGold TrendPower© : 13
Produces Gold - Silver
Develops Gold - Silver
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/12/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
error

 

 

THE REQUESTED URL IS UNCORRECT

Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.
  • Receive our research reports on junior mining companies
    with the strongest potential
  • Free service, your email is safe
  • Limited offer, register now !