September 3, 2008 � Grand Junction, CO � Geovic Mining Corp. (�Geovic� or �The Company�, TSX:GMC, OTC.BB:GVCM), on behalf of its 60%-owned subsidiary Geovic Cameroon PLC (GeoCam), is pleased to announce results of an Optimization Study (OS) of the Nkamouna Cobalt-Nickel-Manganese Project in Cameroon, Africa. The OS includes many improvements to the December 2007 Feasibility Study (FS), and should facilitate the completion of project financing. All currency is expressed in US dollars as of the second quarter 2008. OS highlights include:

  • Initial capital disbursements reduced from $397 million to $379 million despite the inclusion of an $11 million circuit to recover manganese
  • After-tax, undiscounted cash flow estimated at $2.6 billion on revenues of $6.6 billion during the initial 17 years of production
  • Cash operating costs reduced from $3.12 to $2.02 per pound of cobalt, net of byproduct credits from nickel, manganese and scandium
  • Production scheduled to commence in late 2010 and increase to full capacity in early 2011

Financial Projections � Base Cases

GMC Chart 1.bmp

The OS is based on producing high-purity cobalt oxide, nickel carbonate, and manganese carbonate as well as average purity scandium oxide. No premiums or discounts were applied to the metal prices used in the OS. As project economics are most sensitive to product prices, financial projections are shown below for both metal and commodity prices as of September 1, 2008 and a possible low price scenario.

Financial Sensitivity to Product Prices


GMC Chart 2.bmp

Below is a summary of project operating costs, which are the next most sensitive aspect of project economics:

Project Operating Costs

GMC Chart 3.bmp

Process operating cost components are estimated at 42% for ocean and land freight on supplies (mainly soda ash, sulfur, and hydrochloric acid), 31% for purchases of those supplies, and 27% for operating and maintenance labor, repair parts, and energy. Operating costs are based on current prices and reasonable projections, however operating and capital costs may increase or decrease hereafter in response to changing global economic conditions.

Optimization Study - Discussion & Analysis

The three engineering companies listed below (the Alliance), in coordination with GeoCam personnel, examined the engineering and construction aspects of the Project with a primary focus on improving processing and related infrastructure costs and performance:

  • Bateman International Projects BV of the Netherlands, with an office in Brisbane, Australia
  • Roberts & Schaefer Australia Pty. Ltd., with an office in Brisbane, Australia
  • Group Five Projects (Pty). Ltd., based in Johannesburg, South Africa


Mine, tailings storage, G&A, and general project infrastructure capital and operating costs in the OS were escalated or modified as appropriate from the 2007 FS prepared by Washington Group International, Pincock Allen & Holt, and Knight Piesold Consulting, with updated local input from GeoCam. Scott Wilson Mining Group of Toronto, Canada reviewed and validated the financial model that includes the new production and cost estimates from the OS.

Processing changes included production of manganese carbonate rather than disposal of manganese hydroxide. Pyrohydrolysis or spray roasting of solutions to form high-purity cobalt and nickel oxides in the FS was replaced with direct precipitation to form high-purity cobalt and nickel carbonates, from which cobalt is further processed to produce high-purity cobalt oxide. A small process circuit was also added in the OS to recover minor quantities of scandium.

Nearly all electrical and thermal energy required by the project will be supplied from a combined heat and power plant fueled with local biomass (trees), thereby minimizing the consumption of much higher cost petroleum-based fuels. This energy system is also expected to earn carbon credits under the Kyoto Protocol.

The financial projections herein are based on 100% equity financing, but GeoCam intends to leverage the project with an appropriate level of debt financing. Consequently, additional capital will be required for debt finance fees plus funding a risk account to cover potential capital cost over-runs and/or construction delays. Such additional costs, financing fees, and risk accounts will be defined as project financing moves forward.

Project Plans

Now that this OS has been completed, GeoCam will focus on the following major activities necessary to advance the project:

  • Complete an information memorandum and appoint the lead arranger(s) to provide the debt component of project financing.
  • Improve infrastructure to enable initiation of major construction by mid-November 2008.
  • Secure product sale agreements in amounts and under terms that meet mutually acceptable requirements of GeoCam and its lenders.
  • Investigate long-term chemical pricing and freight arrangements, and evaluate options to produce some of the chemical requirements on-site to lower purchase and freight costs.
  • Continue development drilling targeted at expanding project resources and reserves, thereby enabling future production increases and/or extending mine life.
  • Further optimize the mine production schedule to increase ore grades, particularly in the early production years.
  • Complete an EPCM contract and receive a definitive capital cost estimate based on increased design definition, purchase orders, firm quotations, and advanced negotiations or execution of definitive sub-contracts.
  • Acquire additional staff necessary to monitor construction, train operators, and prepare a definitive capital cost estimate for the balance of project development and construction work to be completed by GeoCam (initial infrastructure, pre-production mining, and tailings dam installation).


David C. Beling, P.E., Executive VP and COO, is the Qualified Person responsible for the technical information contained in this press release. The Alliance is responsible for the OS using data obtained from the technical information presented to them by the Company. Additional Company and project information may be found on the websites www.geovic.net, www.sedar.com, and www.sec.gov.

Geovic Background

Geovic is a U.S.-based corporation whose principal asset is a significant cobalt-nickel-manganese deposit in the Republic of Cameroon, Africa, with initial production scheduled for late 2010. Geovic owns 60% of seven related properties on a 1,250 square kilometer Mine Permit in Cameroon. Nkamouna, the first property planned for production, has proven and probable reserves of 299 million pounds Cobalt, 830 million pounds Nickel, and 1,606 million pounds Manganese. Characteristics of these unique Cameroonian deposits can be found on the Company�s website at www.geovic.net.

For more information, please contact:

Andrew Hoffman
VP, Investor Relations
Geovic Mining Corp.
Direct (720) 350-4130
Toll-Free (888) 350-4130
ahoffman@geovic.net

or

Vanguard Shareholder Solutions
Direct 604-608-0824
Toll-Free 866-891-9456
ir@vanguardsolutions.ca



On behalf of the Board
John E. Sherborne, CEO

Footnotes

(1) IRR = Internal Rate of Return.
(2) NPV = Net Present Value using a cash flow analysis discounted at the rate shown; M = million
(3) US spot 99.8% cobalt cathode monthly mean price published by Platt�s Metals Week.
(4) Nickel metal prices from daily cash averages on London Metal Exchange.
(5) High-purity manganese carbonate spot price currently exceeds $1,000/tonne.
(6) USGS recent spot price for similar grade scandium oxide.


Important Notices

Statements contained in this press release that are not historical facts are forward-looking statements (within the meaning of the Canadian securities legislation) that involve risks and uncertainties. Forward-looking statements include, but are not limited to, statements with respect to the future price of metals; the estimation of mineral reserves and resources; the timing and amount of estimated future production, costs of production, and capital expenditures; costs and timing of the development of new deposits; and success of exploration activities, permitting time lines, currency fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage. In certain cases, forward-looking statements can be identified by the use of words such as �proposes�, �expects�, �is expected�, �scheduled�, �estimated�, �intends�, or variations of such words and phrases or state that certain actions, events or results �will� occur. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Geovic Mining to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such risks and other factors include, among others, risks related to operations; actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of metals; possible variations in ore reserves, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labor disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities and other factors as described in detail in the Company�s Annual Information Form and Annual Report on Form 10-K, quarterly reports on Form 10-Q, and other filings with the U.S. Securities and Exchange Commission and Canadian securities regulatory authorities. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements in this press release speak only as of the date hereof. Geovic Mining does not undertake any obligation to release publicly any revisions to these forward-looking statements to reflect events or circumstances after the date hereof to reflect the occurrence of unanticipated events.
This press release and other information released by Geovic uses the terms �reserves�, �resources�, �measured resources�, �indicated resources�, and �inferred resources�. United States investors are advised that, while such terms are recognized and required by Canadian securities laws, the United States Securities and Exchange Commission (the �SEC�) does not recognize them. Under United States standards, mineralization may not be classified as a �reserve� unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. Mineral resources that are not mineral reserves do not have demonstrated economic viability. United States investors are cautioned not to assume that all or any part of measured or indicated resources will ever be converted into reserve. Inferred resources are in addition to measured and indicated resources. Further, inferred resources have a great amount of uncertainty as to their existence and as to whether they can be mined legally or economically. It cannot be assumed that all or any part of the inferred resources will ever be upgraded to a higher category. Therefore, United States investors are also cautioned not to assume that all or any part of the inferred resources exits, or that they can be mined legally or economically.
National Instrument 43-101 Standards of Disclosure for Mineral Projects (�NI 43-101�) is a rule developed by the Canadian Securities Administrators, which established standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Unless otherwise indicated, all reserve estimates contained in this press release or released by Geovic in the future, have been or will be prepared in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum Classification System. The requirements of NI 43-101 are not the same as those of the SEC, and any reserves reported by Geovic in compliance with NI 43-101 may not qualify as reserves under the SEC�s standards.



















Geovic Mining
Vanguard Shareholder Solutions
Vanguard Shareholder Solutions (Vanguard) provides, for remuneration, corporate communications and investor relations services to the above mentioned client(s). The information contained in this email is based on existing disclosure documents or other publicly available information. You are encouraged to seek independent verification of any information that is important to your decisions. By responding to your inquiry neither Vanguard nor the above mentioned client(s) is offering securities or advising or soliciting the purchase or sale of securities.
To be removed from this list, please click here and send:
Data and Statistics for these countries : Australia | Cameroon | Canada | Netherlands | All
Gold and Silver Prices for these countries : Australia | Cameroon | Canada | Netherlands | All

Geovic Mining Corp.

DEVELOPMENT STAGE
CODE : GMC.TO
CUSIP : 373686 10 4
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Geovic is a nickel and copper development stage company based in United states of america.

Geovic develops nickel, copper, cobalt and manganese in Cameroon.

Its main asset in development is NKAMOUNA in Cameroon and its main exploration properties are NEW CALEDONIA LICENCES in New Caledonia and EAST MADA in Cameroon.

Geovic is listed in Canada. Its market capitalisation is CA$ 2.1 millions as of today (US$ 1.9 millions, € 1.4 millions).

Its stock quote reached its highest recent level on January 04, 2008 at CA$ 1.80, and its lowest recent point on December 03, 2014 at CA$ 0.01.

Geovic has 106 720 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Geovic Mining Corp.
7/3/2008Recommendation
Annual reports of Geovic Mining Corp.
2007 Annual Report
Nominations of Geovic Mining Corp.
6/25/2013Announces Election of Directors
1/24/2011Announces New Senior Management Appointments
6/16/2009ANNOUNCES APPOINTMENT OF JOHN T. PERRY AS DIRECTOR
2/17/2009 Announces the Appointment of Barbara A. Filas as Senior V.P...
9/25/2008APPOINTS MICHAEL GOLDBERG AS DIRECTOR
9/12/2008Appoints Conrad Houser as President of Geovic Energy
6/26/2008Management Appointments
5/20/2008 New Construction Management Appointments
Financials of Geovic Mining Corp.
11/15/2008(Nkamouna)FILES THIRD QUARTER FINANCIAL REPORT, ANNOUNCES NKAMOUNA PRO...
Project news of Geovic Mining Corp.
2/15/2011(New Caledonia Licences)Awarded New Caledonian Licenses to Explore Chromite Deposits
10/16/2009(Nkamouna)Cameroon Significantly Increases Resources at Nkamouna Cobal...
2/27/2009(Nkamouna)A first-hand look at Geovic's Nkamouna project, Cameroon
1/23/2009(Nkamouna)Provides Update on Nkamouna Cobalt Project
9/3/2008(Nkamouna)OPTIMIZATION STUDY IMPROVES GEOVIC CAMEROON COBALT PROJECT
6/25/2008(Nkamouna)Progress Update on Mada Drilling Program, Cameroon
Corporate news of Geovic Mining Corp.
9/17/2013Announces New Director
7/23/2013Cameroon Plc Agrees to a Definitive Agreement with China's J...
1/11/2013Announces Changes to Senior Management
1/11/2013Announces Changes to Senior Management
2/15/2012Provides Corporate Update
4/29/2011Initiates Cornudas Mountains Advanced Metals Exploration Pro...
6/15/2010Results of 2010 General Meeting
4/27/2010Nomination of Dr. Paul Rose For Election to Board of Directo...
4/7/2010Notice of AGM
3/23/2010Important Notice to Geovic Shareholders
1/12/2010Resolves Geovic Cameroon Accounting Disagreement
1/5/2010Several Positives to Start 2010
10/28/2009To Attend San Francisco Hard Assets Conference November 21-2...
8/28/2009in Canaccord Capital's Morning Coffee
8/14/2009Investor's Digest: Geovic
6/29/2009Reports Progress Towards Resolving Accounting Dispute
6/25/2009CAMEROON UPDATE
6/17/2009a world class cobalt-nickel play, reports Winston
5/29/2009Metal Bulletin - Geovic plans to have finance in place by mi...
3/9/2009Flexibility Preserves Value says Midas Letter
2/25/2009My Trip to Nkamouna
1/29/2009Lawrence Roulston updates Geovic Mining
1/23/2009Bucholtz asks: has the cobalt price hit bottom?
11/21/2008Energy website is now LIVE
11/21/2008Increases Cash Position
9/8/2008Progress Update on East Mada Drilling Program
8/27/2008Announces Commencement of Trading on OTC Bulletin Board, Tic...
8/27/2008ANNOUNCES COMMENCEMENT OF TRADING ON OTC BULLETIN BOARD
7/28/2008Cameroon Resource Investment
7/16/2008Al Korelin/Geovic Radio Interview
6/27/2008Geovic Mining Update
6/27/2008Contracts Investor Relations Firm for U.S. Market Developmen...
6/20/2008initiatives
6/3/2008The Market Traders interview with CEO Jack Sherborne
6/3/2008Winston Updates Geovic Mining
6/2/2008Recommendation - Winston's Growth Stock Report 5/30/08
5/28/2008Seeks Asian Financing for Cameroon Cobalt Project - Bloomber...
5/28/2008letter Recommendation
5/20/2008Investor Meeting, Newspaper Article
5/14/2008Marketing Initiatives
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (GMC.TO)
0.0200
TORONTO
CA$ 0.020
07/24 14:52 -
0%
Prev close Open
0.020 0.015
Low High
0.015 0.020
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.020 100.00%
Volume 1 month var.
2,000 100.00%
24hGold TrendPower© : -8
Produces
Develops Cobalt - Manganese - Nickel
Explores for Chromium - Copper - Manganese - Nickel
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/13/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.66-0.78%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.22-0.33%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.52-0.76%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64+0.00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.48+1.54%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.26+4.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.23+9.52%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.06%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 53.08+0.70%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :