Saracen Mineral Holdings Ltd

Published : May 10th, 2016

Commercial production declared at Thunderbox -160510ASX

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Cash | Debt | Diesel | Fixed | Gold Producer | Growth | Insurance | Oil | Recovery |

Commercial production declared at Thunderbox -160510ASX

Quarterly Report

SARACEN MINERAL HOLDINGS LIMITED

ACN: 009 215 347

Commercial production declared at Thunderbox

Production ramping up to ~300,000ozpa at AISC of

Corporate Details:

10th May 2016

ASX code: SAR

Corporate Structure:

Ordinary shares on issue: 800.8m

Unvested employee performance rights: 20.2m

Market Capitalisation: A$965m (share price A$1.205)

Cash & Bullion (31 March): A$34.3m Debt: Nil

Directors:

Mr Geoff Clifford

Non-Executive Chairman

Mr Raleigh Finlayson Managing Director

Mr Mark Connelly Non-Executive

Mr Martin Reed Non-Executive

Ms Samantha Tough Non-Executive

Substantial Shareholders:

Van Eck 8.6%

Wroxby 8.2%

Paradice Investment Management 8.0% Karara Capital 6.1%

Registered Office:

Level 4

89 St Georges Terrace Perth WA 6000

Telephone: +61 8 6229 9100

Facsimile: +61 8 6229 9199

For further details contact:

Troy Irvin Telephone +61 8 6229 9100

[email protected]

Key Points

  • Commercial production declared at the Thunderbox gold project in WA, effective April 1, 2016

  • Processing plant operating at nameplate capacity of 2.5Mtpa

  • Thunderbox produced 7,026oz in the month of April 2016 at 94.1% recovery with an AISC of A$1,107/oz

  • Group production ramping-up to ~300,000ozpa at AISC of

  • Commercial production at Thunderbox achieved after a capital investment of A$63.4m

  • Thunderbox free cashflow of A$1.6m (including capital) in the month of April with 6,052oz sold at average gold price of A$1,636/oz

  • 100% of the Thunderbox development funded from internal cashflows generated by the highly successful Carosue Dam project in WA

  • 100% of Thunderbox consideration now paid, totalling A$31.6m, including the purchase of the 1.5% NSR Norilsk royalty

  • Fixed price diesel contracts initiated covering approximately 50% of the Thunderbox consumption over the next two years

  • Pre-stripping of Zone C to commence in the September quarter, with installation of the gravity circuit in July 2016

  • Exploration drilling underway at King of the Hills (65km south of Thunderbox); initial results anticipated in the September quarter

Saracen Mineral Holdings Limited (ASX: SAR) is pleased to declare commercial production at its 100 per cent-owned Thunderbox Gold Project in WA.

Thunderbox, which was delivered ahead of schedule and under budget, achieved cashflow positive status just two months after commissioning commenced.

This milestone means Saracen has joined the mid-tier Australian gold sector, increasing its production rate to ~300,000 ounces a year at an all-in sustaining cost of

Beyond the initial open pit mine life of approximately five years, Thunderbox has promising underground potential. Drilling planned for later this year will aim to define a long-term underground mine, which will potentially extend the project life beyond 10 years.

All Thunderbox consideration now paid

All consideration for the acquisition of Thunderbox, totalling A$31.6m, has now been paid. This includes the purchase of the 1.5% NSR Norilsk royalty, and the A$3.0m final payment.

Table 1 - All Thunderbox consideration now paid

Consideration

A$m Comment

A$20m cash 20.0 Paid on settlement

A$3m cash 3.0 Paid on gold price > A$1,550/oz for a calendar month, 24 months following settlement

8.0m SAR shares* 7.9 Purchase of Norilsk royalty

US$0.5m cash** 0.7 Purchase of Norilsk royalty

TOTAL 31.6

A$/oz

EV/Reserve oz^ 39

EV/Resource oz^^ 13

* Based on 10 day VWAP of A99c prior to execution

** Based on AUD/USD 0.75

^ Based on Ore Reserves at 30 June 2015 of 802koz

^^ Based on Mineral Resources at 30 June 2015 of 2.46Moz

The total consideration confirms efficient allocation of capital, with the transactional Reserve and Resource multiples substantially lower than other comparable deals over recent years.

On a fully-funded (FF) basis i.e. including the capital investment of A$63.4m, the FF A$/Reserve oz is a compelling A$118.

Fixed price diesel contracts initiated

Saracen has taken the opportunity presented by historically low oil prices to partially fix the A$ diesel price. The fixed price contracts cover ~50% of the diesel usage at Thunderbox over the next 2 years.

Table 2 - Fixed price diesel contracts

Tranche

Delivery

Volume

Fixed Price*

#

Period

Litres

Litres per month

A$/litre

1

1 Jul 2016 - 31 Dec 2016

4,500,000

750,000

0.530

2

1 Jan 2017 - 30 Jun 2017

4,500,000

750,000

0.560

3

1 Jul 2017 - 31 Dec 2017

4,500,000

750,000

0.580

4

1 Jan 2018 - 30 Jun 2018

4,500,000

750,000

0.605

* The fixed price applies to the base Product Price (Diesel 10ppm), Ocean Freight, and Insurance and Loss for the volumes specified above. All other costs, charges and conversions of currency or metrics are added to the price.

The weighted average fixed price of A$0.569/litre (~A$0.62/litre including land freight delivered to site) is ~30% less than the Feasibility Study assumption of A$0.90/litre (delivered to site).

Thunderbox is a bulk open pit mine employing large scale mobile equipment, with the cost of diesel the largest single operating cost item. The partial fixing of the diesel price provides Saracen with a degree of price certainty over its biggest expense and will assist in managing future cash flows and production costs.

King of the Hills drilling

Exploration drilling is underway at King of the Hills (65km south of Thunderbox).

Figure 1 - Planned drilling at King of the Hills

The drilling will test potential higher grade zones identified to the south of the current underground workings. Initial results are anticipated in the September quarter.

Saracen Managing Director Raleigh Finlayson said Thunderbox had transformed the Company into a leading mid-tier Australian gold producer.

"Thunderbox gives us the level of production and cashflow sought after by international investors while enabling us to remain debt-free," Mr Finlayson said.

"The potential +10-year mine life of Thunderbox and the exploration upside at both Thunderbox and Carosue Dam means we have a sustainable production profile with strong growth prospects."

For further information please contact:

Investors: Media Enquiries:

Troy Irvin Read Corporate

Corporate Development Officer Paul Armstrong / Nicholas Read

Email: [email protected] Contact: (08) 9388 1474

Email: [email protected]

^^ The information on Thunderbox Mineral Resources and Ore Reserves has been extracted from the ASX announcement titled "2015 Mineral Resources and Ore Reserves" dated 15 October 2015. The report is available to view on the ASX Website at www.asx.com.au and on the Company's website at www.saracen.com.au.The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and, in the case of estimates of Mineral Resources and Ore Reserves, that all market assumptions and technical assumptions underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcement.

Read the rest of the article at www.publicnow.com

Saracen Mineral Holdings Ltd

PRODUCER
CODE : SAR.AX
ISIN : AU000000SAR9
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Saracen Minerals Holdings is a gold producing company based in Australia.

Saracen Minerals Holdings holds various exploration projects in Australia.

Its main assets in production are CAROSUE DAM and SOUTH LAVERTON in Australia, its main assets in development are PORPHYRY, SAFARI BORE and RED OCTOBER in Australia and its main exploration properties are DEEP SOUTH UNDERGROUND, MEXICO, ELLIOTS LODE, MILLION DOLLAR, MONTYS DAM, MARGARET, YUNDAMINDERA, TWIN PEAKS, BUTCHER WELL, ENTERPRISE, DEEP SOUTH, WALLBROOK, PORPHYRY UNDERGROUND, KARARI and WHIRLING DERVISH in Australia.

Saracen Minerals Holdings is listed in Australia. Its market capitalisation is AU$ 3.8 billions as of today (US$ 2.9 billions, € 2.4 billions).

Its stock quote reached its lowest recent point on July 12, 2013 at AU$ 0.09, and its highest recent level on July 31, 2020 at AU$ 6.75.

Saracen Minerals Holdings has 807 550 016 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Saracen Mineral Holdings Ltd
1/30/2008Upgrade in Resources to 2.6m Ounces
Project news of Saracen Mineral Holdings Ltd
8/20/2015150820 ASX - KOTH and Kailis acquisition
11/4/2009(Carosue Dam)Major Gold Ore Reserves increase at Carosue Dam
5/25/2009(South Laverton)South Laverton Gold Project – 60% Ore Reserve Increase
1/29/2008(Whirling Dervish)Whirling Dervish - Substantial Resource Increase
Corporate news of Saracen Mineral Holdings Ltd
8/18/2016Corporate Update -
7/29/2016RBC - SAR Outperform PT$1.80
7/27/2016FY17 Exploration and production outlook
7/7/2016June Qtr Pre-release 160707
6/15/2016UK Asia Corporate Presentation 160614
5/24/2016Resources Rising Stars Corporate Presentation 160524
5/19/2016RBC - Saracen Upside PT $1.50
5/17/2016RBC - Saracen Outperform -160512
5/11/2016Deep South ramp-up
5/10/2016Commercial production declared at Thunderbox -160510ASX
5/4/2016SAR Corporate Presentation - 160504
5/3/2016SAR Added to ASX200
4/27/2016March 2016 Quarterly Report-160427 ASX
4/21/2016Purchase of Thunderbox royalty - 160421 ASX
4/14/2016Saracen Ready to Flex its Muscles - RBC
4/13/2016Karari Resource and Reserve Growth - 160413 ASX
4/6/2016160406 ASX - March Qtr Pre-release
2/1/2016Thunderbox commissioning underway - 160201 ASX
1/29/2016Dec 2015 Quarterly
1/21/2016High Grade Gold Intersections at Pinnacles JV Gold Project -...
1/15/2016160115 Hartleys upgrade target price to 88c
1/11/2016160111 ASX - December Qtr Pre-release
12/22/2015151222 ASX - TBO update
11/25/2015151125 ASX - TBO update
10/15/2015Low Cost Growth Presentation - MBL
10/15/2015151015 ASX - CDO Robust 5 Year Outlook
10/7/2015Sept 2015 Qtly production summary
9/30/2015Full Year Statutory Accounts
9/16/2015Thunderbox progress & guidance
8/27/20152015 Financial Year Results
8/5/2015SAR Presentation Diggers 2015
8/3/2015150731 ASX Thunderbox Site Visit Presentation
7/22/2015June 2015 Quarterly Final
7/8/2015Kalpini Project - High grade intersections
7/7/2015June 2015 Quarterly
7/3/2015150702 ASX - Karari Drilling Update
6/10/2015150609 ASX - Blue Manna Exploration Update
4/9/2015March 2015 Quarterly Report
3/23/2015150323 ASX - MBL Debt Hedging Thunderbox Decision
11/17/2014Notice of General Meeting/Proxy Form
11/5/2014Capital return and special dividend
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (SAR.AX)
4.69+0.00%
AUSTRALIA
AU$ 4.69
02/12 10:00 -
0%
Prev close Open
4.69 4.69
Low High
4.69 4.69
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  4.69 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : -32
Produces Gold
Develops Gold
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/13/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2021-1.26%5.224.64
202047.52%6.752.82
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX