Mines Management Inc.

Published : August 19th, 2016

Mines Management Reports Second Quarter 2016 Financial Results and Montanore Project Update

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Mines Management Reports Second Quarter 2016 Financial Results and Montanore Project Update

Spokane, Washington - August 18, 2016 - MINES MANAGEMENT, INC. (NYSE-MARKET: 'MGN', TSX: 'MGT')(the 'Company') announces financial and operating results for the second fiscal quarter ending June 30, 2016.

Overview

· On May 23, 2016, the Company entered into an agreement and plan of merger ('merger agreement') with Hecla Mining Company ('Hecla'). Pursuant to the merger agreement and subject to approval of the Company's stockholders and the satisfaction of other conditions specified in the agreement, a subsidiary of Hecla (HL Idaho Corp.) would merge with and into the Company, with the Company continuing as the surviving corporation and as a direct wholly owned subsidiary of Hecla. Each outstanding share of the Company's common stock will be exchanged for 0.2218 shares of Hecla's common stock per the terms of the merger agreement. The merger agreement, as amended, may be terminated in certain circumstances prior to the closing, including by either party if the Company fails to obtain stockholder approval of the merger agreement or the merger is not consummated by the deadline. The merger agreement has been amended to extend the deadline for consummating the merger agreement to September 30, 2016.· On May 23, 2016, the Company and its subsidiaries entered into a term loan and security agreement with Hecla as lender ('the term loan agreement'). The term loan agreement provides for a $2.3 million secured term loan which bears interest at a rate equal to the LIBOR rate plus five percent and, as amended, matures on the earlier of September 30, 2016 or the date the merger is completed. The term loan becomes due and payable in full upon a change of control or event of default (as such terms are defined in the term loan agreement) or if the merger agreement is terminated for any reason other than a breach of the merger agreement by Hecla. The term loan is secured, subject to certain permitted liens, by a security interest in substantially all of the Company's assets, including the Montanore Project. · The Company's cash reserves as of June 30, 2016, are insufficient to continue operations through the end of the third quarter of 2016. If the proposed merger with Hecla is not completed, the Company will need to seek additional capital or consider other alternatives, which could include bankruptcy or the sale of some or all of its assets.· As of June 30, 2016, all of the issued and outstanding shares of the Company's Series B 6% convertible preferred stock had been converted into 5,085,176 shares of common stock.· Based on information provided by the Company through June 30, 2016 and the Company's May 24, 2016 press release announcing a merger agreement with Hecla, the NYSE MKT granted a revised plan period for the Company to regain compliance with certain continued listing standards until September 30, 2016.

Financial and Operating Results

The Company continues to expense all of its expenditures when incurred, with the exception of equipment and buildings which are capitalized. The Company has no revenues from mining operations. Financial results of operations include primarily general and administrative expenses, permitting and maintenance of the Montanore Project, and legal, accounting, and consulting expenses.

Quarter Ended June 30, 2016

The Company reported operating expenses of $1.2 million for each of the quarters ended June 30, 2016 and 2015. The most significant differences in operating expenditures between those two quarters include: (i) a $0.1 million decrease in general and administrative expenses primarily due to the lack of stock compensation and the lack of expenditures for an annual meeting and directors compensation during 2016, (ii) a decrease of $0.2 million in technical expenses in 2016 primarily due to the completion of the final environmental impact statement on the Montanore Project ('FEIS') and issuance of the federal and state records of decision, which resulted in reduced fees paid to the contractors working on obtaining and maintaining project approvals and permits as well as a reduction in the baseline studies associated with the Environmental Impact Study, and (iii) a $0.3 million increase in legal, accounting and consulting fees primarily associated with the agreement and plan of merger with Hecla.

Six Months Ended June 30, 2016

The Company reported operating expenses of $2.2 million for the six months ended June 30, 2016 compared to $2.8 million for the six months ended June 30, 2015. The most significant differences in operating expenditures between those two quarters include: (i) a $0.2 million decrease in general and administrative expenses primarily due to the lack of stock compensation during 2016 (compared to $0.1 million during 2015) and the absence of expenditures for an annual meeting and director compensation during 2016 (compared to $0.1 million during 2015), (ii) a decrease of $0.3 million in technical expenses in 2016 primarily due to the completion of the FEIS and issuance of the records of decision, which resulted in reduced fees paid to the contractors working on obtaining and maintaining project approvals and permits as well as a reduction in the baseline studies associated with the Environmental Impact Study, and (iii) a $0.1 million increase in legal, accounting and consulting fees primarily associated with expenditures related to the agreement and plan of merger with Hecla.

Liquidity

During the six months ended June 30, 2016, the net cash used in operating activities was approximately $1.8 million, which was $0.8 million less than the net cash used in operating activities during the same period in the prior year. Net cash provided by financing activities during 2016 included approximately $1.3 million provided by the term loan agreement entered into with Hecla and $0.2 million in proceeds from stock options exercised, offset by $0.1 million cumulative preferred stock dividends paid. During 2015, net cash utilized by financing activities included $0.1 million cumulative preferred stock dividends paid. The Company's cash and cash equivalents decreased from $1.2 million at December 31, 2015 to approximately $0.8 million at June 30, 2016.

The Company does not currently have enough cash on hand to fund ongoing operating expenses through the end of the third quarter of 2016. The Company expects to fund its operating expenses during this period, prior to completion of the merger with Hecla, by borrowing the remaining funds available from Hecla pursuant to the $2.3 million term loan described above. The Company does not have a recurring source of revenue or sufficient cash to fund normal operations or meet its debt obligations without raising additional funds. These factors raise substantial doubt about the Company's ability to continue as a going concern. If the proposed merger with Hecla is not completed, the Company will need to seek additional capital or consider other alternatives, which could include bankruptcy or the sale of some or all of its assets.

About Mines Management

Mines Management, Inc. is engaged in the business of acquiring and exploring, and if exploration is successful, developing mineral properties containing precious and base metals. The Company's primary focus is on the advancement of the Montanore silver-copper project located in northwestern Montana. The Montanore is an advanced stage exploration project, which contains mineralized material of approximately 81.5 million tons with average grades of 2.04 ounces silver per ton and 0.74% copper.

Cautionary Note to U.S. Investors concerning estimates of Mineralized Material:This press release uses the terms 'Mineralized Material'. We advise U.S. investors that the term, while permissible under the Securities and Exchange Commission Industry Guide 7, does not indicate 'reserves' by SEC standards. There can be no assurance that any part of the mineralized material at Montanore will ever be confirmed or converted into SEC Industry Guide 7 compliant 'reserves'. Investors are cautioned not to assume that all or any part of the mineralized material will ever be confirmed or converted into reserves or that mineralized material can be economically or legally extracted.

Statements Regarding Forward-Looking Information: Some statements contained in this press release are forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995 and other applicable U.S. and Canadian securities laws including comments regarding the anticipated merger with Hecla Mining Company, the Company's plans to fund its operating expenses during the period prior to the merger with Hecla by borrowing from Hecla; the terms of the Hecla loan and the Company's lack of cash to fund its ongoing operating expenses through the third quarter of 2016. Investors are cautioned that forward looking statements are inherently uncertain and involve risks and uncertainties that could cause actual results to differ materially from those presented. Factors that could cause results to differ materially include delay in or failure to complete the merger with Hecla, the failure of either party to comply with the merger agreement or loan agreement, whether the Company's operating expenses are higher than anticipated; whether external financing for the Company's business can be obtained on acceptable terms or at all if the Hecla merger is not completed; possible bankruptcy filing or sale of a portion or all of the Company's assets if the Hecla merger is not completed, continued disputes regarding claim ownership and rights in the Montanore Project area; the outcome or effects of shareholder litigation challenging the Hecla merger; changes in interpretation of geological information, whether additional permitting may be required at Montanore in the future; the results of delineation drilling and feasibility studies; continued decreases and future fluctuations in silver, gold and copper prices; and world economic conditions. Mines Management, Inc. assumes no obligation to update this information. There can be no assurance that future developments affecting Mines Management, Inc. will be those anticipated by management. Please refer to the discussion of risk factors in the Company's Form 10-K for the year ended December 31, 2015.

For more information, contact:
Douglas D. Dobbs
President, Mines Management, Inc.
Phone: 509-838-6050
Fax: 509-838-0486
Email: [email protected]
Web: www.minesmanagement.com

Read the rest of the article at www.publicnow.com
Data and Statistics for these countries : Georgia | All
Gold and Silver Prices for these countries : Georgia | All

Mines Management Inc.

DEVELOPMENT STAGE
CODE : MGN
ISIN : US6034321058
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Mines Management is a silver and copper development stage company based in United states of america.

Mines Management holds various exploration projects in USA.

Its main asset in development is MONTANORE (ROCK LAKE) in USA.

Mines Management is listed in Canada, in Germany and in United States of America. Its market capitalisation is US$ 38.4 millions as of today (€ 34.2 millions).

Its stock quote reached its highest recent level on January 10, 1997 at US$ 937.00, and its lowest recent point on February 08, 2002 at US$ 0.05.

Mines Management has 33 990 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Mines Management Inc.
2008 Annual report
Annual Report 2007
Financings of Mines Management Inc.
4/5/2011ANNOUNCES EXERCISE OF UNDERWRITER’S OVER-ALLOTMENT OPTION
3/14/2011MINES MANAGEMENT, INC. PRICES $15 MILLION PUBLIC OFFERING
3/3/2011COMMON STOCK OFFERING
2/11/2010announces extension and reprice of warrants
11/5/2007ANNOUNCES COMPLETION OFUS$10 MILLION PRIVATE PLACEMENT WITH ...
Nominations of Mines Management Inc.
10/1/2009Appoints Michael G. Rasmussen as Vice president or explorati...
12/20/2007 ANNOUNCES APPOINTMENTS TO ITS PROFESSIONAL STAFF AT THE MON...
Financials of Mines Management Inc.
5/3/2011YEAR-END EARNINGS RELEASE
4/26/2010Announces 2009 operating results
9/9/2009Second quarter financial and operating results
6/1/2009Announces first quarter results
4/8/2008Announces 2007 Year End Financial Results
11/15/2007Announces Third Quarter Earnings and Montanore Project Updat...
8/21/2007SECOND QUARTER RESULTS
5/17/2007 Announces First Quarter Results
Project news of Mines Management Inc.
12/16/2015Montana silver, copper mine clears key hurdle; lawsuit looms
8/19/20159:02 am Mines Management announces a favorable US court ruli...
2/4/2011(Montanore (rock Lake)) Technical Report For Montanore Silver-Copper Project
7/13/2009 Updates permitting activities at the Montanore project
3/2/2009(Montanore (rock Lake))ANNOUNCES RELEASE OF DRAFT ENVIRONMENTAL IMPACT STATEMENT .....
7/14/2008(Montanore (rock Lake))State of Montana Approves Montanore Hard Rock Mining Impact ...
11/19/2007(Montanore (rock Lake)) ANNOUNCES COMPLETION OF IMPORTANT MILESTONE IN MONTANORE PR...
11/9/2007(Montanore (rock Lake))PURCHASES UNDERLYING ROYALTY ON MONTANORE PROJECT
3/28/2007(Montanore (rock Lake))Files Preliminary Prospectus Supplement to Raise Gross Proce...
Corporate news of Mines Management Inc.
8/19/2016Mines Management Reports Second Quarter 2016 Financial Resul...
7/8/2016Mines Management's Compliance Plan Extended by NYSE MKT
5/24/2016What Hecla Really Gets With This Small Acquisition
5/24/2016Hecla to Acquire Mines Management
4/6/2016Mines Management's Compliance Plan Extended by NYSE MKT
4/5/2016Mines Management Reports 2015 Financial Results and Montanor...
3/21/2016Mines Management Engages Financial Advisor
2/12/2016The Latest: Mine developer says partial approval is enough
1/21/2016Mines Management's Compliance Plan Extended by NYSE MKT
1/21/2016Mines Management Inc.'s Compliance Plan Extended by NYSE MKT
12/21/2015Mines Management's Montanore Silver-Copper Project Receives ...
12/21/2015Mines Management Inc.'s Montanore Silver-Copper Project Rece...
12/18/2015Mines Management Reports Third Quarter 2015 Financial Result...
10/27/2015Mines Management Inc.'s Compliance Plan Approved and Extende...
10/9/2015Mines Management Raises Cash; Provides Update on Financial M...
10/9/2015Mines Management Inc. Raises Cash and Provides Update on Fin...
9/23/2015NYSE MKT Accepts Mines Management, Inc. Plan to Regain Compl...
8/21/2015Mines Management Reports Second Quarter 2015 Financial Resul...
8/21/2015Mines Management Inc. Reports Second Quarter 2015 Financial ...
8/20/2015Federal Court Rules in Favor of Mines Management Regarding C...
8/19/2015Federal Court Rules in Favor of Mines Management Regarding C...
8/18/2015Mines Management Inc. Announces Completion of Objection and ...
8/17/201510-Q for Mines Management, Inc.
7/8/2015Mines Management, Inc. Receives Notice from NYSE MKT
7/8/201510:03 am Mines Management receives a letter from the NYSE, i...
6/18/2015Mines Management Inc. Announces Voting Results of Annual Gen...
5/19/201510-Q for Mines Management, Inc.
4/7/2015Mines Management Inc. Reports 2014 Financial Results and Mon...
3/30/2015Mines Management Final Environmental Impact Statement Comple...
3/30/2015Mines Management Inc. Final Environmental Impact Statement C...
3/30/2015FINAL ENVIRONMENTAL IMPACT STATEMENT COMPLETED FOR MONTANORE...
2/25/2014AMENDED Mines Management, Inc. Press Release - PR 14-01
2/25/2014PR 14-01
11/28/2013PR 13-07 Revised
9/3/2013PR 13-06
6/15/2013PR 13-05
6/3/2013PR 13-04
5/7/2013PR 13-03
4/25/2013PR 13-02
3/22/2013Message - PR 13-01
4/10/2012Message - PR 12-03
9/8/20112011 Silver Summit Luncheon
8/19/2010Message - PR 10-06
5/3/2010World Moneyshow Las Vegas 2010 Conference Booth# 420
1/25/2010World Moneyshow Orlando 2010 Conference Booth# 813
11/17/2009Withdraws public offering of shares
11/12/2009ANNOUNCES COMMON STOCK OFFERING
8/11/2009To Host Silver Summit Lucheon
6/22/2009Shareholders approve stockholder rights plan
1/30/2009EXTENDS WARRANT EXPIRATION
5/28/2008ANNOUNCES 1ST QUARTER RESULTS
3/3/2008 STATE OF MONTANA CONFIRMS MONTANORE PROJECT'S 1993 OPERATIN...
9/7/20072007 FALL CONFERENCE SCHEDULE
5/9/2007ANNOUNCES EXCERCISE OF OVER-ALLOTMENT OPTION
4/20/2007Successful Closing of US$30 Million Unit Offering
3/26/2007Announces 2006 results
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AMEX (MGN)FRANKFURT (MM2.F)
1.13-10.32%9.46-0.11%
AMEX
US$ 1.13
09/13 16:00 -0.130
-10.32%
Prev close Open
1.26 1.13
Low High
- -
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  1.13 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : 3
Produces
Develops Copper - Silver
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/18/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.66-0.71%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.29+0.24%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.52-0.76%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.66+0.76%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.09-0.86%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.22+2.38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.06%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 53.14+0.83%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :