Updated Banfora Scoping Study increases NPV by 233% to $210M

Gryphon Minerals

ASX Announcement

6 July 2015

Updated Banfora Scoping Study4 increases NPV by 233% to A$210 Million with an IRR of 42% & AISC of US$800/oz

Simple low cost up-scaling through addition of 1mtpa CIL plant with head grade of 2.5g/t gold

Corporate Directory Non-Executive Chairman Mel Ashton

Managing Director

Stephen Parsons

Non-Executive Directors

Didier Murcia

Bruce McFadzean

Company Secretary

Carl Travaglini

Advancing the

3.6 Moz Banfora Gold

Project, Burkina Faso1

Low cost & high grade

1.5g/t gold Heap Leach

2.5g/t gold CIL

Easily expandable

On track for success in 2015:

A$20 million cash2

US$60 million debt3

Fully Mine Permitted

Bankable Feasibility Study

Huge Exploration Upside

Contact Details

Principal & Registered Office

288 Churchill Avenue

SUBIACO WA 6008

T: +61 8 9287 4333

F: +61 8 9287 4334

E: [email protected]

ASX CODE

GRY

www.gryphonminerals.com.au
Excellent project economics demonstrated from optimisation of the start-up 2Mtpa heap leach (HL) operation & scoping study4 for expansion through the addition of a conventional 1Mtpa carbon-in-leach (CIL) processing plant.

Low upfront capital costs of US$85M for the start-up Heap Leach operation & low additional capital outlay of US$45M for a 1Mtpa CIL add-on which could be funded with early cash flow from the initial start-up Heap Leach operation.

The Company is undertaking due diligence with Macquarie Bank Limited (Macquarie) for project debt funding to support construction of the initial 2Mtpa start-up Heap Leach operation with the expectation to complete within 2H 2015.

Recent grade control (5 metres x 5 metres) drill results from within the pit designs demonstrate continuity of mineralisation & exceptionally high grade gold that will further enhance mine production. Results included 17m @ 8.2g/t & 14m @ 64.6g/t gold. (Refer ASX Announcement on

6 May 20155 or click here)

Study highlights table showing:

1. The base case 2Mtpa HL with later upscaling via 1Mtpa CIL;
2. The upscaled case where the HL and CIL plants are constructed simultaneously; and
3. The standalone 2Mtpa HL operation, fully optimised since publication of the 2014 Bankable

Feasibility Study.

Updated Banfora Gold Project Feasibility

Study Economics @ US$1,250/oz

2015 Studies

2014

Feasibility

Study

Updated Banfora Gold Project Feasibility

Study Economics @ US$1,250/oz

Base Case (2mtpa Heap Leach Followed by 1mtpa CIL)4,9

Upscaled Case (Simultaneous Build of 2Mtpa Heap Leach +

4,10

1mtpa CIL )

2mtpa Heap

Leach Stand

7,11

Alone

2mtpa Heap Leach Stand Alone6

NPV 5% after tax

A$M

185

210

120

90

IRR after tax

%

25.3%

42.2%

30.4%

20.5%

LOM revenue (net of refining costs)

US$M

1,162

1,160

778

808

Cash costs/oz (C1)

US$/oz

717

707

718

743

All-In Sustaining Costs/oz (AISC)

US$/oz

811

800

839

868

Capital costs

includes working capital & contingencies

US$M

85 + 45

130

85

97

In pit gold resources

Moz

1.1

1.1

0.8

0.8

Average gold produced

oz/yr

63,000/129,000

133,000

73,800

70,600

LOM

years

9.2

7.0

8.6

9.2

Strip ratio

W:O

3.5:1

3.5:1

3.2:1

3.4:1

4 The results are at Scoping Study level. The Scoping Study referred to in this report is based on low-level technical and economic assessments, and is insufficient to support estimation of Ore Reserves or to provide assurance of an economic development case at this stage, or to provide ce rtainty that the conclusions of the Scoping Study will be realised. In discussing 'reasonable prospects for eventual economic extraction' in Clause 20, the Code requires an assessment (albeit preliminary) in respect of all matters likely to influence the prospect of economic extraction including the approximate mining parameters by the Competent Person. While a Scoping Study may provide the basis for that assessment, the Code does not require a Scoping Study to have been compl eted to report a Mineral Resource. Scoping studies are commonly the first economic evaluation of a project undertaken and may be based on a combination of directly gathered project data together with assumptions borrowed from similar deposits or operations to the case envisaged. They are also commonly used internally by companies for comparative and planning purposes. Reporting the general results of a Scoping Study needs to be undertaken with care to ensure there is no im plication that Ore Reserves have been established or that economic development is assured. In this regard it may be appropriate to indicate the Mineral Resource inputs to the Scoping Study and the processes applied, but it is not appropriate to report the diluted tonnes and grade as if they were Ore Reserves . While initial mining and processing cases may have been developed during a Scoping Study, it must not be used to allow an Ore Reserve to be developed . The Scoping Study is preliminary in nature as its conclusions are drawn on Inferred mineral resources (2%). No mine sequencing was performed. There is a low level of geological confidence associated with inferred mineral resources and there is no certainty that further exploration work will result in the determination of indica ted mineral resources or that the production target itself will be realised. The stated production target is based on the Company's current expectations of future results or events and should no t be solely relied upon by investors when making investment decisions. Further evaluation work and appropriate studies are requir ed to establish sufficient confidence

that this target will be met.

1 of 14

6 July 2015

Mr Steve Parsons, Managing Director, commented "We are very pleased with the results of the studies which demonstrate significantly enhanced project economics for the initial start-up 2Mtpa Heap Leach operation and additional 1mtpa CIL expansion capacity. Gryphon will be able to upscale the project using a low cost staged approach potentially from cash flows of the initial start-up heap leach operation at the Banfora Gold Project."

"With the optimisation and additional capacity studies completed and a granted mining permit in place, Gryphon can now move to completion of debt funding due diligence which is one of the final hurdles to commencing development at Banfora."


Gryphon has significantly advanced its strategy of de-risking the Banfora Gold Project and moving towards gold production, with the following key milestones delivered:

- Environmental & Mining Licence granted by the Burkina Faso government.

- Shallow reserve infill and pre-mining grade control drilling complete.

- Studies completed proposing well-established, proven mine and Heap Leach & CIL processing technologies.

- Mandate letter for up to US$60 million3 in a senior loan facility.

2Mtpa start-up heap leach optimisation study & additional 1Mtpa CIL expansion scoping study summary:

Gryphon Minerals Limited (ASX: GRY) is pleased to announce the results of the Optimisation Study (the "Study") for the development of a 2Mtpa Heap Leach start-up operation, and upside potential realised with the expansion of the facility through the addition of a conventional 1Mtpa carbon-in-leach (CIL) processing plant, at its flagship Banfora Gold Project (the "Project") in Burkina Faso (GRY: 90%, Burkina Faso Government: 10%).
The latest Study highlights significantly enhanced Project economics, utilising additional grade control drill data for in-pit resources (refer ASX Announcement of 6 May 2015)5, and subject to finalising a senior debt facility with Macquarie, the Company intends to proceed with the development of the Project, potentially making the Banfora Gold Project one of the next operating gold mines commissioned in Burkina Faso and Gryphon as one of the next low cost ASX listed gold producers.
As part of an optimisation study on the Project, the Company has updated key cost parameters of the start-up Heap Leach operation, and in addition has incorporated a scoping level study4 for the installation of a 1Mtpa CIL circuit.
The 1Mtpa CIL has the flexibility to be added onto the 2Mtpa heap leach operation either at the commencement of development (simultaneously) or at a later date using cash flows from the heap leach operation.
The optionality to develop the heap leach project as a standalone operation is retained given the benefits of lower up-front capex and quicker development time-frame. Retaining this optionality gives Gryphon the flexibility to develop a low-capex project for a more manageable funding solution, in turn allowing the 1Mtpa CIL circuit to be added at a later date, which can be funded in part via Heap Leach cash flow.
The studies have shown the upscaling would be best undertaken at the end of the second year of operation of the start-up heap leach facility. Hence the announcement demonstrates the scoping study outcomes for both scenarios, which provides the Company with project development optionality which is considered important under current market conditions.

The Study also focussed on the high cost elements and major contributors to capital, operating and sustaining costs ( refer later in this announcement for additional detail). A gold price of US$1,250/oz was retained for project economics, as per the original Heap Leach feasibility study base case (refer ASX Announcement of 4 August 2014 or click here)5:

Heap Leach start-up operation: initial 2 years7


The Study outcomes for the standalone Heap Leach scenario demonstrate the optionality available to the Company to commence with the HL plant with low upfront capex and further to that the flexibility afforded at the Banfora Gold Project to modify mining plans across the four deposits to achieve best case financial returns in either scenario.

www.gryphonminerals.com.au 2 of 14

6 July 2015

- Reduced up front capital cost totalling US$85M for the start-up 2Mtpa HL operation including all infrastructure, working capital & contingencies.

- Average annual gold production from the start-up HL operation treating oxide only material of 63,300 ounces for first 2 years. Accessing near-surface higher grade transitional material during this period increases production to an average of 78,600 ounces.

- Adopting the latter production scenario, average HL gold grade is 1.5g/t for the first 2 years of standalone operation.

- HL Cash Costs (C1)8 average US$665/oz for the first 2 years of standalone operation.

Facility expansion with inclusion of a 1mtpa CIL Circuit4

- Expansion capital cost estimate of US$45M for the addition of the 1Mtpa CIL circuit, to be commissioned at end of the second year of HL standalone operations.

- Average annual gold production for the expanded operation increases to 130,000 ounces.

- In-pit Resources of the expanded operation increase to 1.1Moz (up from 0.8Moz).

- CIL circuit will treat higher grade fresh rock mineralisation at an average grade of 2.54g/t gold.

- Cash Costs (C1)8 average of the expanded operation of US$717oz and AISC for LOM of US$811oz
The Heap Leach components of the Study were prepared via the update of key parameters from the Feasibility Study completed in August 20146, utilising an updated resource estimate inclusive of recent infill and grade control drilling (refer ASX Announcement of 6 May 2015)5. Thus, the ultimate basis of the Study remains unchanged, being the development of a
2Mtpa heap leach start-up operation at the Banfora Gold Project located in south-west Burkina Faso, West Africa.
The basis for the CIL expansion Scoping Study4 was taken from the original Feasibility Study undertaken on a 2Mtpa CIL development scenario for the Banfora Gold Project (Refer to the ASX release 31 January 2013 or click here)5. This work has been integrated with the above work and the engineering and mining studies re-optimised based on a combined 2Mtpa HL and 1Mtpa CIL operation at Banfora. Pit optimisation studies determined that the optimum timing for the addition of the CIL plant was following 2 years of steady operation of the 2Mtpa HL facility.

Table 2: Optionality enhanced for the Start-up 2Mtpa Heap Leach as a standalone operation which bank debt due diligence is currently being undertaken4

2Mtpa Start-up Heap Leach stand-alone operation

(US$1,250 gold)

June 2015

% Change from

August 2014

Project cash flow

Capex (includes contingency & working capital)

US$140M

US$84.5M

+16%

-15%

NPV5% after tax C IRR after tax Payback

Cash Costs/oz (C1) A

All-in Sustaining Costs (AISC) B

A$120M

30.4%

2.8yrs US$718/oz US$839/oz

+25%

+33%

-32%

-4%

-4%

Notes to Table 2:

A C1 cash costs as set out by Mackenzie Wood

B All-in sustaining costs (AISC) includes C1 cash costs, royalties, refining and sustaining capital costs

C Exchange rate for US$:A$ of 0.78c

www.gryphonminerals.com.au 3 of 14

6 July 2015


The Company managed the Study and engaged a number of independent specialist consultants to assist with the optimisation work for the Study update; Lycopodium Minerals Pty Ltd optimised the capital and operating costs, Cube Consulting Pty Ltd updated pit optimisations, mine designs and mine scheduling for the optimisations, and Kirk Mining Consultants provided an overview of mining operating costs.
The optimisation work completed for the Study focussed on those key inputs with the potential to provide increased upside to the Banfora Gold Project economics. These principal areas are outlined below:

Optimisation Engineering and Updated Key Cost Components

As part of the Study, the Company solicited revised quotations for key cost inputs to the capital and operating costs. In general terms the Project has benefited from this exercise which has realised savings attributable to difficult market conditions, with tighter margins evident and lower labour rates from contractors, and in part exchange rate movements since the August 2014 Feasibility Study6.
This exercise focussed on the high cost elements and major contributors to capital, operating and sustaining costs with the following elements providing the more significant savings:

Reagent costs have reduced due to increased competitiveness improving process operating costs; cyanide and cement being of highest significance.

More competitive costings for engineering and project and construction management services, benefiting from the stronger USD compared with AUD and ZAR where the majority of these services will be provided from.

Re-quote of mining contractor costs including pre-production, establishment, mobilisation and operating costs, using an experienced mining contractor with established operations in West Africa; benefiting from the tighter market conditions and increased availability of plant and equipment.

Use of used equipment where confirmed available and appropriate for the processing facility, and only after physical inspection of the equipment in question by the Company to confirm its condition and suitability for Banfora.

Reduction in international transport costs realised through the recent drop in oil prices. Much of these discounts are yet to be passed on in Burkina Faso itself, however should this eventuality transpire, then the project operating costs will realise additional benefit.

Accounting for sunk costs in the estimate accumulated from the grade control drilling, minor early works engineering completed to date on access road designs, camp layout and bulk earthworks, and accommodation camp costs which include architectural designs.

Revision of the construction methodology for accommodation and housing at the project, based on in-house architectural design work and trial construction at the project site. Of significance is the training of local employees of the Company in the construction of concrete panels for tilt-up construction methods, proving significantly quicker than traditional block work methods, and providing the local community with new skill sets. Refer pictures on following page.

Update of sustaining capital costs, benefiting from unit cost reductions for above mentioned housing construction methodology, with the added benefit of maximising local labour at lower cost than international contractors.

www.gryphonminerals.com.au 4 of 14

6 July 2015



Mining and Pit Optimisation

Based on the in-pit resources (including Inferred Mineral Resources), operating and capital costs, pit optimisations were completed for HL and CIL materials. The mining operation proposes engagement of a mining contractor using conventional truck and shovel open pit methods. The combined heap leach/CIL facility will process approximately 23Mt of plant feed in total over a 7 year mine life at an average head grade of 1.44g/t gold. The CIL facility will process approximately 6.6Mt of the total plant feed at an average LOM head grade of 2.54g/t gold.
In the optimal scenario of bringing the CIL plant on line after two years of operation, the heap leach facility will process approximately 16Mt of plant feed over an 8 year mine life at an average head grade of 1.1g/t gold. The CIL facility will process approximately 6.7Mt of plant feed over a 6.5 year mine life at an average head grade of 2.54g/t gold.
The updated material movement estimations for the Study were again developed by Cube Consulting, with the primary aim of supplying the best value material first to maximise the value to the Project.

Processing

As stated in the Feasibility Study, the HL process route comprises two stage crushing for oxide and transition materials, followed by cement agglomeration and overland conveying to heap leach pads. The pad area includes full plastic (HDPE) lining, conveyor stacking in 8 metre lifts, and drip irrigation with dilute cyanide solution. Pregnant solution is treated at a dedicated Adsorption-Desorption Recovery (ADR) plant via elution, electro winning and smelting to produce gold doré.

The conventional CIL processing plant includes a single stage milling circuit (SAG Mill), conventional CIL gold recovery process and tailings storage facility. Services for the expanded plant will be drawn from the existing HL operation via minor upgrade s, with no requirement for expansion of general infrastructure and administration buildings.

www.gryphonminerals.com.au 5 of 14

6 July 2015

Metallurgy

Detailed independent metallurgical testwork programs have been conducted for the CIL and Heap Leach technologies to a Bankable Feasibility Study standard. Testwork confirmed that Banfora ores are all 'non-refractory', typically 'free-milling' with a high gold recovery by cyanidation leach and low to moderate reagent consumptions, as follows:

Table 3: Metallurgical Recoveries for Heap Leach & CIL

Ore Type

Average

CIL Grind size

Recovery

Average Average

Heap Leach Crush Size

Recovery mm

Oxide

Transition

Primary

92%* 106µ

97%* 106µ

89%* 106µ

85% 12.5

78% 12.5

66% 8.0

*Some of the original testwork for the CIL program was completed at 75 microns which realised improved recoveries, however Gr yphon has used the coarser 106 micron grind for its studies to reduce power cos ts. At 75 microns the estimated recoveries in the CIL are: Oxide: 94%, Transition: 97%, Primary:

92%.

It should also be noted that the primary samples at 75 microns saw recoveries as high as 97% at the Nogbele & Samavogo deposits, and thus with lower operating costs such as heavy fuel oil (HFO) or hydroelectric power from Cote d'Ivoire this could warrant a revisit of the grind size. Study work has also shown that approximately 20% of the gold can also be recovered by gravity circuit, however this has not been factored into the design by Gryphon as to keep capital costs to a minimum, and would require a modest amount of confirmatory testwork.

Mineral Resource & Potential for Depth Extension

The Banfora Gold Project is a significant undeveloped gold resource in West Africa and is one of only a few new large scale greenfields discoveries in the world. The Mineral Resources are shallow with 90% above 150 meters vertical depth and they remain open at depth and along strike. The Ore Reserves for the heap leach operation are also shallow with an average
vertical pit depth of 50 metres across the deposits (refer ASX Announcement of 4 August 2014).5 The 0.5g/t lower cut has
been used for the Study work.

Table 4: Mineral Resource Estimate:

Lower cut (g/t)

Measured

Indicated

Measured + Indicated

Inferred

Total

Lower cut (g/t)

Tons

(Mt)

Grade g/t Au

Gold

(Moz)

Tons

(Mt)

Grade g/t Au

Gold

(Moz)

Tons

(Mt)

Grade g/t Au

Gold

(Moz)

Tons

(Mt)

Grade g/t Au

Gold

(Moz)

Tons

(Mt)

Grade g/t Au

Gold

(Moz)

0.3

9.5

1.1

0.35

76.2

1.2

2.9

85.8

1.2

3.2

19.2

1.1

0.70

105

1.2

3.9

0.5

6.7

1.4

0.31

60.5

1.4

2.7

67.2

1.4

3.0

15.9

1.3

0.66

83.0

1.4

3.6

1.0

3.1

2.3

0.23

28.8

2.1

1.9

31.9

2.1

2.2

7.8

1.9

0.47

39.7

2.1

2.6

1.5

2.0

2.9

0.18

16.1

2.8

1.4

18.0

2.8

1.6

3.8

2.6

0.32

21.9

2.8

1.9

www.gryphonminerals.com.au 6 of 14

6 July 2015

Figure 1: Nogbele North Deposit Pit Design

Figure 2: Selection of cross sections showing excellent continuity and high grade mineralization from initial starter pit designs at the Nogbele, Fourkoura & Samavogo gold deposits


www.gryphonminerals.com.au 7 of 14

Fourkoura North Main Pit Section 1144780mN

3BOZ eaoz

360Z 360Z

,, l l

l

l

340Z 340Z

l

320Z

300Z

>0.2 g/t

D >0.5git

l

15m@ 12.9 g/tAu ',

@'--m--=@:-:2..1,-g--:/t,--,Au,---...-1' ' ' '

320Z

Bottom of Complete

ÙX1dat10n JOOZ

ZBOZ

>1.0 g/t

>5.0g/t

Quartz Gabbro/Dolerite

., , Maf1c volcanoclast1c sed1ment

@'---m--=@3::.-0g/Atu--,1-.. f',,

40m

'

Samavogo Centrai Section 1158620 m

l

>02g,t

u>05g.1

>1 o gli

>50g,1

Ampl11bohte facies metavolcanics 40m

www.gryphonmmerals.com.au 8 of 1 4

6 July 2015

Revised Capital Costs

The capital cost estimate for the project development has been compiled and is presented in US dollars. The estimated initial capital cost based on the optimised Study outcomes, including contingencies and project working capital, is US$84.5 million. Refer Table 5 below.
The upfront 2Mtpa Heap Leach operation provides the Company with a low cost development path to production which, when combined with the robust economics at low gold prices, is manageable and attractive to project financiers. The addition of the 1Mtpa CIL plant in this scenario is anticipated at the end of the second year of standalone HL production and is planned to be funded through cash flows from the HL operation, based on the pit optimisation work conducted by Cube Consulting.

Table 5: 2Mtpa Heap Leach Capital Cost Estimate

Total

Cost Area US$M

Construction Establishment 6.3

Processing Facility 16.5

Leach Pads 4.4

Infrastructure 17.4

EPCM 8.1

Owner's Costs 12.3

Resettlement and Compensation 9.1

Contingency 7.5

Working Capital 2.9

Total Initial Capital 84.5

CIL Plant Capital* 45.4

* The CIL processing plant can be built up initially with the Heap Leach operation or at a later date using cash flows from t he start-up Heap Leach operation.

Sustaining capital estimates for the operation matched the same concept as used for the feasibility studies over the nine year mine life, and total US$30 million (approximately US$32/oz gold produced) for the expanded plant, but with one exception. The Feasibility Study required the addition of a tertiary crusher to handle primary material after year two of operation. With the addition of a CIL plant, these materials are no longer processed through the HL plant, hence the approximate US$6M reduction from the August 2014 Feasibility Study sustaining capital estimate6.

Upside potential with simultaneous development of Heap Leach & CIL plants:4

As part of an optimisation study on the Banfora Gold Project, the Company has in addition incorporated a scoping level study for the installation of a 1Mtpa CIL circuit that has the flexibility to be added onto the 2Mtpa heap leach operation either at the commencement of development (simultaneously) or at a later date using cash flows from the heap leach operation.
The study work has shown that the best economic outcome for the Banfora Gold Project is obtained with the 2Mtpa Heap
Leach and the 1Mtpa CIL combined from the start of development.

With the current difficult gold market conditions Gryphon is continuing with the path to develop the heap leach project as a standalone operation given the benefits of lower up-front capex and quicker development time-frame. Retaining this optionality gives Gryphon the flexibility to develop a low-capex project for a more manageable funding solution, in turn allowing the 1Mtpa CIL circuit to be added at a later date, which could be funded via Heap Leach cash flow.

www.gryphonminerals.com.au 9 of 14

6 July 2015


A gold price of US$1,250 per ounce was used for pit optimisations and base case financial modelling, mirroring the approach taken in the Feasibility Study. This expansion scoping study includes Inferred resources in addition to Measured and Indicated; with Inferred resources making up just over 2% of the total in-pit resource. Sensitivity analysis undertaken predicts the HL operation has a strong resilience to a lower gold price and the expanded case shows very good upside in a rising gold price environment.

Table 6: Expanded Economics for 2mtpa heap leach & 1mtpa CIL developed simultaneously 4

Notes to Table 1:

A C1 cash costs as set out by Mackenzie Wood

B All-in sustaining costs (AISC) includes C1 cash costs, royalties, refining and sustaining capital costs

C Pit-designs @ US$1,450oz and sale of gold price at US$1,450oz

D Exchange rate for US$:A$ of 0.78c

Path Forward

The Company has significantly advanced its strategy of de-risking the Banfora Gold Project and moving towards gold production, with the following key milestones delivered:

- Shallow reserve infill and pre-mining grade control drilling complete which has demonstrated excellent continuity to gold mineralisation.

- Environmental permitting complete.

- Mining Licence granted by the Burkina Faso government.

- Independent studies completed proposing well-established, proven mine and HL & CIL processing technologies.


- Mandate letter signed with Macquarie3 to act as sole arranger and underwriter for up to US$60 million in a senior loan facility.

www.gryphonminerals.com.au 10 of 14

6 July 2015


Over the coming months, the Company intends to complete the bank due diligence process in an effort to secure the loan facility with Macquarie in 2H 2015. This will underpin the funding solution for development of the start-up 2Mtpa heap leach facility.

Exploration Success: Banfora Gold Project

Excellent Grade Continuity for Mining:

Results from recent infill drilling within the main deposits have confirmed the existing geological and resource models and indicated excellent grade continuity within the numerous shoots that were drill tested. Some of the significant intersections from the recent drilling were announced earlier this month (refer ASX Announcement of 6 May 2015 for all results or clickhere)5 and are summarised below.

Nogbele Deposit 17m @ 8.2 g/t Au from 12m

16m @ 6.8 g/t Au from 7m

8m @ 11.3 g/t Au from 6 m

25m @ 3.4 g/t Au from 1m

Fourkoura Deposit 14m @ 64.6 g/t Au from 16m (including 1m @ 843.4 g/t)

19m @ 5.5 g/t Au from 3m

12m @ 5.3 g/t Au from 0m

Stinger Deposit 4m @ 45.6 g/t Au from 6m

9m @ 15.1 g/t Au from 14m

14m @ 7.0 g/t Au from 2m

Samavogo Deposit 16m @ 3.3 g/t Au from 28m

4m @ 13.0 g/t Au from 5m

7m @ 5.9 g/t Au from 47m

Depth Extension and Future Underground Potential:

Deeper drill results below the current pit designs at the Stinger deposit indicate that high grade mineralisation continues at depth (refer to ASX announcements 2 July 2012 and 13 November 2012) 5include:

17m @ 4.26g/t gold from 261m

22m @ 3.19g/t gold from 119m

5m @ 15.71g/t gold from 103m

10m @ 8.67g/t gold from 141m

Significant Potential For further discoveries:

To add to the Banfora Project's 3.6Moz gold resource base there is significant potential for new discoveries throughout the project's 1150 km2 of tenure. There are a number of nearby satellite targets with ore grade gold drill intersections requiring follow up resource drilling. Gryphon has identified a further 16 regional targets as walk up drill ready targets as well as numerous untested geochemical/geological targets. Advanced targets include:

Ouahiri Prospect: 5km shear corridor with similarities in scale and geochemical footprint to the 1.6Moz Nogbele gold deposit. RC drill results include:

11m @ 3.80 g/t Au from 53m

1m @ 123.1 g/t Au from 66m

4m @ 11.5 g/t Au from 98m

6m @ 5.5 g/t Au from 43m

www.gryphonminerals.com.au 11 of 14

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Burkina Faso | All
Gold and Silver Prices for these countries : Burkina Faso | All

Gryphon Minerals Limited

EXPLORATION STAGE
CODE : GRY.AX
ISIN : AU000000GRY4
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Gryphon Min. is a gold and nickel exploration company based in Australia.

Gryphon Min. holds various exploration projects in Australia.

Its main exploration properties are COLLURABBIE SOUTH, MOUNT WINDARRA, DUGGAN PROJECT, MULGABBIE PROJECT, MOUNT RANKIN, WEST BENDERING, MT ISA PROJECTS, WEST KIMBERLEY and RADIO PROJECT in Australia and BANFORA in Burkina Faso.

Gryphon Min. is listed in Australia. Its market capitalisation is AU$ 82.3 millions as of today (€ 73.4 millions).

Its stock quote reached its highest recent level on April 15, 2011 at AU$ 2.12, and its lowest recent point on December 05, 2014 at AU$ 0.04.

Gryphon Min. has 401 460 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Project news of Gryphon Minerals Limited
2/10/2009(ASX: GRY) - Drilling Intercepts Multiple High Grade Gold Zo...
10/31/2007Drilling Intersects Disseminated & Massive Sulphides Minara ...
10/12/2007(Collurabbie South)Drill Testing of High Priority Targets
9/17/2007(Banfora)Maiden Resource 410,000oz Gold, Banfora Project West Africa
7/11/2007(Banfora)Continued Drilling Success at Banfora Including 4 metres @ 2...
Corporate news of Gryphon Minerals Limited
8/19/2016Court approves the release of the Scheme Booklet and orders ...
8/19/2016Scheme Booklet lodged with ASIC
8/19/2016Scheme Booklet
6/20/2016Teranga Gold to Acquire Gryphon Minerals
6/19/2016Teranga Gold Announces Agreement to Acquire Gryphon Minerals...
11/25/2015Divestment of Mauritanian Gold and Copper Assets
10/23/2015Notice of 2015 Annual General Meeting
7/7/2015Updated Banfora Scoping Study increases NPV by 233% to $210M
10/31/2014Update on Events in Burkina Faso
6/24/2014Burkina Faso gold output to reach 40 T by 2016 -minister
3/16/2014Gryphon Minerals Sale and Resignation of Non Executive Direc...
11/5/2013"GRY" | Shareholder Update
9/23/2013| Presentation Update
9/22/2011Investor Presentation, September 2011
8/31/2011(Banfora)on track to becoming a significant gold producer, Banfora Go...
5/19/2009 attracts investment from IFC, a member of the World Bank Gr...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (GRY.AX)
0.205-6.82%
AUSTRALIA
AU$ 0.205
09/29 09:10 -0.020
-6.82%
Prev close Open
0.220 0.215
Low High
0.202 0.215
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.205 -%
Volume 1 month var.
6,152,272 -%
24hGold TrendPower© : -8
Produces
Develops
Explores for Cobalt - Copper - Diamonds - Gold - Iron - Nickel - Palladium - Platinum - Uranium - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/25/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :