Comet Ridge Limited

Published : July 29th, 2016

27 July 2016 Quarterly Report - June 2016

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Australia | Fed | Georgia | Market | Target | Water |

27 July 2016 Quarterly Report - June 2016

29 July 2016

June 2016 Quarterly Report

Highlights:

  • Significant development study work undertaken at Mahalo

  • Mahalo pilot maintains strong production rate

  • Gas transportation MOU signed with APA for Galilee Basin as a key step in reducing east coast gas supply pressure

Australian Permits

ATP 1191 Mahalo - Bowen Basin, Qld (Comet Ridge 40%), Santos (30%), APLNG (30%)

Comet Ridge undertook a significant amount of analysis work during the quarter to examine the most efficient and cost effective way to move the northern pilot schemes in the block into production via available export pipeline capacity and field infrastructure

(Refer Figure 1).

These studies focussed on utilising existing infrastructure, wherever possible, to minimise capital spend and optimise the time required to initially bring the northern part of the Mahalo block into production.

Figure 1 - Potential Mahalo northern field layout for 25 TJ/d initial production phase

Comet Ridge Limited T: +61 7 3221 3661 E: [email protected] 283 Elizabeth St, Brisbane, Qld, 4000 Australia

ABN 47 106 092 577 F: +61 7 3221 3668 W: www.cometridge.com.au GPO Box 798, Brisbane, Qld, 4001 Australia

ASX CODE: COI

Comet Ridge Limited

Comet Ridge has defined a three step process as the most effective strategy to achieve initial Mahalo production, with the first part of Step 2 able to be commenced while Step 1 (the reserves upgrade) is underway:

  1. Conversion of existing 3P reserves to 2P reserve category, targeting up to 550 PJ (gross to the Joint Venture) across the northern part of the block;

  2. An initial production phase targeting 25 TJ/d of gas production from the northern part of the block, utilising existing facilities to minimise capex spend and construction time; and

  3. Expanding the initial production phase to a full field target of 100 to 200 TJ/d of gas production based around the well production rates achieved from the initial production phase to guide full scale well positioning and plant design.

Work required for Step 1, the reserves upgrade, includes production enhancement at the Mira pilot and a single, step-out corehole.

These studies indicate that the cost of production from the initial production phase should be very low given:

  • Strong gas flow rate from a very short horizontal well section;

  • Shallow reservoir;

  • Low water production rates; and

  • Proximity to existing infrastructure to transport Mahalo gas to the Gladstone LNG market.

At an industry wide level, the fifth LNG train has commenced operating in Gladstone with a sixth and final train due to come on line later this year, requiring very significant gas volumes to meet capacity. As Mahalo has demonstrated its productive capacity, with low corresponding water rates, the Company believes that the asset will produce a significant volume of gas that can be operated at a very low cost of production which can be fed into either the LNG schemes or into substantial domestic demand.

The Mahalo Pilot Scheme maintained its strong production rate at approximately 465,000 scf/d throughout the quarter with one horizontal well and two vertical wells on line and one vertical well shut- in.

ATP 743 and ATP 744 - Galilee Basin, Qld (Comet Ridge 100%) ATP 1015 - Galilee Basin, Qld (Comet Ridge increasing to 100%)

Comet Ridge entered into a non-binding Memorandum of Understanding (MOU) with APA Group (APA) during the quarter to work towards the transportation of gas from Comet Ridge's Galilee Basin permits to east coast gas markets.

The MOU provides a framework of cooperation between the parties to negotiate the commercial terms of a gas transportation agreement under which APA would build, own and operate new gas pipelines and associated gas gathering and production infrastructure connecting Comet Ridge's Galilee Basin gas projects to APA's existing Queensland gas pipeline network.

Comet Ridge has a very large acreage position in the eastern part of the Galilee Basin which is prospective for both sandstone gas and CSG development, including 100% interests in ATP 743 and ATP 744 and is increasing its interest in ATP 1015 to 100% (Refer Figure 2).

Figure 2 - Regional Location of Mahalo JV Area and Eastern Galilee Basin Blocks

The Company believes that given the size of Comet Ridge's certified contingent gas resources in the Galilee Basin, there is significant potential for this gas to be transported to the southeast to satisfy the demand from LNG and industrial customers. The MOU with APA facilitates the transportation requirements with a group that owns and operates an extensive network of pipelines on the east coast of Australia with access to all the principal east coast markets.

Some preliminary work was completed during the quarter including consideration of likely pipeline export routes out of the basin and the most logical tie in points to existing infrastructure.

Gunnedah Basin, NSW (Comet Ridge CSG equity: PEL 427: 59.09%, PEL 428: 68.42%, PEL 6: 29.55%)

(Comet Ridge Conventional equity: PEL 427: 100%, PEL 428: 100%, PEL 6: 99.7%)

In late April, a renewal application for PEL 427 was submitted to the NSW government by the CSG operator. The Company is also awaiting formal approval for the renewals of PEL 6 and PEL 428 which were submitted in October 2015.

Comet Ridge's large Gunnedah Basin position is shown in Figure 3. The current spend level on these permits is very low, in keeping with the delay that is occurring whilst the NSW government processes the permit renewal applications.

Figure 3 - Comet Ridge's Gunnedah Basin position

Stephen Rodgers Company Secretary Comet Ridge Limited

For further information please contact:

Tor McCaul

Managing Director

Comet Ridge Limited

[email protected]

+61 7 3221 3661

Read the rest of the article at www.publicnow.com
Data and Statistics for these countries : Australia | Georgia | All
Gold and Silver Prices for these countries : Australia | Georgia | All

Comet Ridge Limited

CODE : COI.AX
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile

Comet Ridge LTD is based in Australia.

Comet Ridge LTD is listed in Australia. Its market capitalisation is AU$ 112.2 millions as of today (US$ 72.6 millions, € 68.0 millions).

Its stock quote reached its lowest recent point on August 14, 2015 at AU$ 0.04, and its highest recent level on July 06, 2018 at AU$ 0.42.

Comet Ridge LTD has 575 340 032 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate news of Comet Ridge Limited
7/29/201627 July 2016 Quarterly Report - June 2016
5/11/201611 May 2016 MOU with APA Group for Galilee Basin Transporati...
5/5/201605 May 2016 APPEA - Inquiry acknowledges importance of natur...
4/29/201629 April 2016 Quarterly Activities Report - March 2016
4/7/201607 April 2016 APPEA - Senate Submission
4/7/201611 March 2016 Financial Statements for Half-Year Ended 31 De...
1/29/201629 January 2016 Quarterly Report - December 2016
1/25/201625 January 2016 Mahalo7 Horizontal Well Production Continues...
12/18/201518 December 2015 Mahalo 7 Horizontal Well Production Update
12/2/201526 November 2015 Managing Director's AGM Presentation
12/2/201526 November 2015 Chairman's 2015 Annual General Meeting Addr...
12/2/201502 December 2015 Increase in 2P & 3P Reserves at Mahalo Gas ...
11/19/201511 November 2015 APPEA - International Energy Agency upbeat ...
11/12/201511 November 2015 Mahalo 7 horizontal well project operationa...
10/30/201529 October 2015 Quarterly Cash Flow Report - September 2015
10/29/201529 October 2015 Quarterly Activities Report - September 2015
10/23/201523 October 2015 Notice of AGM & Proxy
9/28/201523 September 2015 Comet Ridge Full Year Statutory Accounts 2...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (COI.AX)
0.195+0.00%
AUSTRALIA
AU$ 0.195
05/01 14:14 -
0%
Prev close Open
0.195 0.195
Low High
0.190 0.195
Year l/h YTD var.
0.180 -  0.230 -11.36%
52 week l/h 52 week var.
0.135 -  0.230 39.29%
Volume 1 month var.
390,607 2.63%
24hGold TrendPower© : 44
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202421.88%
20230.00%0.190.12
202239.13%0.250.10
202159.72%0.150.06
2020-62.11%0.200.05
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.54-2.14%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.50+0.39%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.12%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.65+0.00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.32-2.51%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.26+4.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.23+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.80+3.45%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 50.04-2.22%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :