Operational Update: total gold production of 7,252 ounces, continued profitability and steady

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Goldplat plc / Ticker: GDP / Index: AIM / Sector: Mining & Exploration

20 April 2016

Goldplat plc ('Goldplat' or 'the Company')

Operational Update

 

Goldplat plc, the AIM listed African gold producer, announces an operations update for the three months ending 31 March 2016 ('the quarter') for its two market leading gold recovery businesses in South Africa and Ghana, and its Kilimapesa Gold Project in Kenya, reporting total gold production of 7,252 ounces, continued profitability and steady progress on priority capital projects.

 

Goldplat Recovery Pty Limited ('GPL') - South Africa

 

?         During the quarter GPL produced 4,864 ounces of gold of which a total of 3,365 ounces were sold for own account and 975 ounces were returned to clients by way of metal transfers

?         Operating Profit for the quarter was ?845,000, bringing the 9-month year to date Operating Profit to ?1,535,000 (unaudited)

?         The Tailings Storage Facility ('TSF') re-processing project is progressing well with focus during the quarter on the research into metallurgical recovery optimisation.  Due to the complexity of the metallurgical research work, it is expected to be completed towards the end of May 2016, following which the economic assessment, design, production and processing plans will be undertaken

?         During the quarter, the Company commenced a silver toll recovery project for Rand Refinery to which the high grade circuit and approximately half of the increased elution capacity was dedicated. This project has continued into the current quarter. The project cost was front end loaded and although all revenues thus far have been recognised, the cash amounts due will be collected in the current quarter and further profits realised

?         The majority of the concentrates produced during the period went to Rand Refinery in South Africa, reducing the turnaround time significantly, with the balance of the ashes and carbon sent to Aurubis in Germany

?         The recently installed 4-tonne elution column continues to operate at capacity with improvements being made on a continual basis providing greater flexibility and capacity to procure and process material

?         Awarded a contract with Anglogold Ashanti's Geita mine in Tanzania

?         Appointments of a new General Manager and Strategic Sourcing Manager for GPL are progressing well and should be finalised in the current quarter

?         Annual wage negotiations were successfully concluded

 

Gold Recovery Ghana ("GRG") - Ghana

 

?         During the quarter 1,885 ounces of gold were produced at GRG with 2,391 ounces being sold

?         The profitability continues with an operating profit of ?156,000 for the quarter, bringing the 9-month year to date Operating Profit to ?458,000 (unaudited)

?         The renewal of the Gold and Environmental Protection Agency licences are in progress and are expected to be concluded during the current quarter

?         With the expansion of Kilimapesa being prioritised, the timing of the new elution plant project at GRG has been pushed out and a new commissioning date is being negotiated with the Ghanaian Authorities

?         Commissioning of the shotblast facility was completed and production is underway

?         The CIL plant has been deconstructed and containerised, and is being loaded for transport to Kilimapesa during the current quarter

?         Subsequent to the resolution of backlog stock issues, relationships with clients in Ghana have normalised and new material deliveries are expected to return to normal

?         Constructive discussions relating to sourcing by-product material from potential South American clients continue - this forms part of Goldplat's stated diversification and growth strategy for GRG

?         A new collective bargaining agreement was signed and annual wage negotiations concluded successfully

 

Kilimapesa Gold ("Kilimapesa") - Kenya

 

?         Kilimapesa produced 503 ounces of gold during the quarter of which 442 ounces were sold

?         This resulted in an operating loss for the period of ?169,000 (unaudited), bringing the 9-month year to date Operating Loss to ?501,000. Monthly losses relative to the previous 6 month period were reduced  by improving gold yields

?         In preparation for the installation of the CIL plant (from Ghana) the Environmental Impact Assessment for the new plant, office and tailings deposition sites has been approved. Civil construction is expected to begin during the current quarter

?         Processing of artisanal tailings from the licence area recommenced during the quarter

?         Limited production of high grade ore from on-reef exploration at Teng Teng continued during the quarter and plans are underway to prepare for a Mining Licence application

?         The Knelson concentrator plant trials are underway at the Kilimapesa plant. On completion the equipment will be re-installed and commissioned at the new plant site and is expected to contribute to revenues during the current quarter

?         A new collective bargaining agreement was signed and annual wage negotiations were successfully completed

 

 

Gerard Kisbey-Green, CEO of Goldplat plc commented: "This has been another good quarter for Goldplat. I am pleased to report continued profitability at the recovery operations and decreased losses at Kilimapesa. Good progress was made on major projects, including the Kilimapesa plant project and the GPL tailings storage facility. Finally I would like to congratulate all stakeholders for the successful completion of annual wage negotiations at all subsidiaries.  Whereas the financial results reflect the performances of the operating subsidiaries only, it is pleasing to report that, including all holding company and non-operating subsidiary costs, the Group remained profitable during the quarter."

 

** ENDS **

 

For further information visit www.goldplat.com or contact:

 

Gerard Kisbey-Green, CEO

Goldplat plc

Tel: +27 (71) 8915775

Ewan Leggat/Jeff Keating          

SP Angel Corporate Finance LLP

Tel: +44 (0) 20 3470 0470

Andrew Raca/Justin McKeegan                  

VSA Capital

Tel: + 44 (0)20 3005 5000

Charlotte Heap

St Brides Partners Ltd

Tel: +44 (0) 20 7236 1177

 

Goldplat plc, is an AIM-listed gold recovery services company with two market leading operations in South Africa and Ghana. The Company's strategy is focussed on utilising its cash flow generated from flagship gold recovery operations in Africa to self-fund sustainable growth and expansion of niche gold recovery business model. The Company also has a small gold mining and exploration portfolio in Kenya, Burkina Faso and Ghana and is evaluating various opportunities to create value or monetise these assets.

 

 

 

 

 

cid:image001.jpg@01D02E70.74B813E0

 

Charlotte Heap

St Brides Partners Ltd

3 St Michael's Alley, London, EC3V 9DS

www.stbridespartners.co.uk 

Tel: +44 (0) 207 236 1177  |  Mob: +44 (0) 777 186 2283 |   Twitter: @StBridesP

 

Disclaimer

 

The information contained in this communication from the sender is confidential.  This email is intended solely for the named recipient. It may contain privileged and/or confidential information. If you are not one of the intended recipients, please notify the sender immediately, and destroy this email: any disclosure, copying, distribution or any action taken or omitted in relation to the contents of this information is prohibited and may be unlawful. Any views expressed in this message are solely those of the author and do not necessarily represent those of St Brides Partners Limited, its subsidiaries or associates, except where expressly stated to be.

 

Although St Brides Partners Limited believes this email and any attachments to be free of viruses it cannot guarantee that attachments are virus-free or compatible with your systems and does not accept any liability in respect of viruses which may be transmitted in or with this message, or for any computer problems experienced.

 

St Brides Partners Limited is registered in England with company number 09359105 at 3 St Michael's Alley, London, EC3V 9DS.

 

Data and Statistics for these countries : Burkina Faso | Germany | Ghana | Kenya | South Africa | Tanzania | All
Gold and Silver Prices for these countries : Burkina Faso | Germany | Ghana | Kenya | South Africa | Tanzania | All

Goldplat Plc.

PRODUCER
CODE : GDP.L
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Goldplat is a gold producing company based in South africa.

Its main asset in production is KILIMAPESA in Kenya and its main exploration property is BANKA in Ghana.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Goldplat Plc.
12/20/2016Ghana renews Goldplat's licence, shares jump
Financings of Goldplat Plc.
7/14/2016signs LOI with Gulf Shore Resources for US$3 million earn-in...
Nominations of Goldplat Plc.
1/8/2014Goldplat Plc - Board Changes: Current Executive Director Mr...
6/14/2013Goldplat plc - Directors Dealings: CEO Russell Lamming purch...
7/7/2011Goldplat plc - Appoints Dr. Robert Pitts Smith as Executive ...
Project news of Goldplat Plc.
4/20/2016Operational Update: total gold production of 7,252 ounces, c...
5/1/2013Goldplat BUY recommendation with 20p price target (current s...
12/12/2012SP Angel Note - Goldplat - BUY / Target Price 30p - Increase...
12/12/2012Goldplat plc - Resource Update increases total JORC complian...
Corporate news of Goldplat Plc.
12/5/2013Goldplat plc - Board Appointments: Hansie van Vreden appoint...
12/3/2013Goldplat plc - Awarded Responsible Gold Certification at Sou...
6/4/2013Goldplat plc - Transaction in Own Shares
6/4/2013=?iso-8859-1?Q?Goldplat_-_Fairfax_research_note_18p_price_ta...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AIM (GDP.L)
7.60-2.97%
AIM
GBX 7.60
04/26 17:35 -0.230
-2.97%
Prev close Open
7.83 7.67
Low High
7.60 8.20
Year l/h YTD var.
5.60 -  8.00 23.58%
52 week l/h 52 week var.
5.60 -  9.00 -17.84%
Volume 1 month var.
470,496 24.59%
24hGold TrendPower© : -26
Produces Gold
Develops
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/1/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202421.60%
2023-39.02%9.880.10
202246.43%9.9510.00
2021-14.63%8.516.50
2020241.67%9.202.30
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :