Sandfire Resources NL

Published : January 27th, 2016

Sandfire December 2015 Quarterly Report

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Copper | Diamond | Georgia | Gold | Gold Discovery | Market | Recovery |

Sandfire December 2015 Quarterly Report

5e5323fa-a05c-4061-9aca-b4feffbf6a27.pdf


28 January 2016


Mr Sebastian Bednarczyk Adviser, Issuers (Perth) ASX Limited

Level 8, Exchange Plaza 2 The Esplanade

Perth WA 6000


Dear Sebastian,


LODGEMENT OF DECEMBER 2015 QUARTERLY REPORT, QUARTERLY UPDATE PRESENTATION AND INVESTOR CONFERENCE CALL AND WEBCAST


I am pleased to attach the following items for immediate release to the market:


  1. December 2015 Quarterly Activities Report

  2. December 2015 Quarterly Update Powerpoint Presentation


In addition, a teleconference and live webcast on the December 2015 Quarterly Report will be held for the investment community at 10.00am (AWST) / 1.00pm (AEST) today.


The webcast and synchronised slide presentation is available through the Company's website or through BRR Media.


Live date: Thursday, 28 January 2016

Access this webcast at: http://webcasting.brrmedia.com/broadcast/56944abb2ac671c40a8c5881

http://www.sandfire.com.au



Yours sincerely,


Matt Fitzgerald

Chief Financial Officer and Company Secretary


ASX Announcement 28 January 2016



QUARTERLY REPORT

For the period ended 31 December 2015


Highlights

Production & Operations



Contained metal production

September 2015

Quarter

December 2015

Quarter

1HFY2016

FY2016

Guidance

Copper (t)

16,638

17,642

34,280

65,000 - 68,000

Gold (oz)

7,885

9,420

17,305

35,000 - 40,000

C1 cost (US$/lb)

0.97

1.02

0.99

0.95 - 1.05


  • Strong mine production and milling achieved 1.6Mtpa rates for Quarter.

Process plant enhancements continuing to drive copper recoveries.


  • Copper production exceeded H1 guidance reflecting continued strong production performance.


Exploration


  • Resource drilling commenced at the Monty VMS copper‐gold discovery, part of the farm‐in with Talisman Mining, with four DDH rigs and one RC rig - 19,000m of RC and DDH drilling completed during the quarter.

  • Significant zone of massive sulphides containing bornite mineralisation intersected in three holes which returned outstanding assay results including (down‐hole widths, not true widths):

    • 21.6m @ 34.4% Cu and 0.4g/t Au from 339.4m down‐hole (TLDD0026);

    • 25.8m @ 24.1% Cu and 0.5g/t Au from 299.0m down‐hole including 14.9m @ 36.7% Cu and 0.4g/t Au from 309m (TLDD0061); and

o 9.6m @ 14.1% Cu and 1.5g/t Au from 292.3m (TLDD0036)


  • Further high‐grade assay results received from ongoing drilling of the Lower Zone at Monty. Some of the recent assay results from ongoing drilling include (all intercepts are down‐hole widths):

o 20.8m @ 14.9% Cu and 1.3g/t Au from 372.7m down‐hole (TLDD0042) o 11.3m @ 6.7% Cu and 2.9g/t Au from 392.2m down‐hole (TLDD0043) o 8.0m @ 13.3% Cu and 1.8g/t Au from 286.2m down‐hole (TLDD0021)

  • Joint Venture commenced with Talisman Mining following Sandfire reaching the $15M farm‐in threshold to earn a 70% interest in the Springfield Project


  • Drilling of the Homer trend commenced with an initial Diamond hole completed; further drilling planned.

Corporate

Appointment of experienced resource industry executive Maree Arnason as a Non‐Executive Director.


  • Increased stake in North American copper development company, Tintina Resources, from 36% to 57% by acquiring a 21% interest held by a fellow shareholder. Sandfire now controls Tintina for accounting purposes.


1.0 SAFETY PERFORMANCE


The Total Recordable Injury Frequency Rate (TRIFR) for the Sandfire Group for the December Quarter was

2.7 compared to a TRIFR for the September Quarter of 8.9. Recordable injuries include those that result in any days away from work (Lost Time Injuries) and those where an employee or contractor cannot perform all or any part of their normal shift (Restricted Work Day Injuries), as well as any injury that requires services that only a medical practitioner can provide (Medical Treatment Injuries).


This strong safety performance reflects a continued focus on initiatives to further improve safety performance including the development of safety systems, improved safety leadership, improvement of safety culture and risk and assurance management.


Figure 1: Drilling at Monty (left); and the DeGrussa Concentrator (centre and right)


  1. OPERATIONS OVERVIEW


    Copper production for the December Quarter was ahead of guidance at 17,642 tonnes (September Quarter: 16,638 tonnes) at an average ore grade of 4.8% Cu (September Quarter: 4.7% Cu). C1 cash operating costs for the Quarter were US$1.02/lb (September Quarter: US$0.97/lb).


    Mill throughput for the December Quarter was above 1.6Mtpa, with a total of 403,806 tonnes of ore milled. Mill throughput operating performance continues to demonstrate that the capacity of the process plant is close to 1.7Mtpa.


    Copper recovery averaged 91.2% in the December Quarter, reflecting stable plant operation throughout the Quarter together with the impact of the column cell, which has delivered an improvement in copper recoveries since its installation in February 2015.


    Mine production for the Quarter was 399,940 tonnes grading 4.8% Cu. This reflects an annualised production rate from the mine of 1.6Mtpa. During the Quarter, production was completed from the first stope from the C4 lens and ore development within the C5 lens commenced in early January 2016, which will allow C5 stope production to be brought forward to Q4 FY2016.


  2. MINING & PRODUCTION


  3. Overview


    December 2015 Quarter - Production Statistics


    Tonnes

    Grade (% Cu)

    Grade (g/t Au)

    Contained Copper (t)

    Contained Gold (oz)

    Concentrator Mined

    399,940

    4.8

    1.7

    19,301

    22,029

    Milled

    403,806

    4.8

    1.7

    19,343

    21,759

    Production

    72,039

    24.5

    4.1

    17,642

    9,420

    Note: Mining and production statistics are rounded to the nearest 0.1% Cu grade and 0.1 g/t Au grade. Errors may occur due to rounding. Production Statistics are subject to change following reconciliation and finalisation subsequent to the end of the Quarter.


  4. Underground Mining


    A total of 488 metres of ore drive development was completed during the Quarter, resulting in the production of 40,245 tonnes of development ore. In addition, 359,695 tonnes of stope ore was produced, resulting in total ore production for the Quarter of 399,940 tonnes grading 4.8% Cu.

    During the Quarter, production was completed from the first stope in the C4 lens, with performance meeting expectations. This strong performance confirms consistent mine production at 1.6Mtpa rates and reflects a continued focus on reliable stope design and excavation, as well as mining fleet productivity. Opportunities to further enhance mine production will continue to be explored.


    The mined copper grade was marginally higher than planned as a result of positive reconciliations from a number of stopes mined and minor adjustments to the mine schedule. On a total mine basis, project copper ore reconciliations remain slightly positive against the resource model.


    The mine remains in balance between production and back-fill. Given the maturity of production in the C1 and DeGrussa lenses together with C4 now online, opportunities to replace paste back-fill in some stopes with mine waste continue to be identified, thereby reducing overall waste haulage to the surface and allowing a focus on ore haulage.


    Total underground development had reached 32.8km at Quarter-end. The Conductor 1 decline was not advanced during the Quarter with the focus on development of the Conductor 4 and 5 declines. The development of the Conductor 1 decline will recommence as required for the extraction of the lower Conductor 1 ore.


    During the quarter Conductor 4 decline development advanced 94 metres and Conductor 5 decline development advanced 203 metres, with all development advance occurring in good ground conditions. Ore development within the C5 lens commenced in early January 2016, which will allow C5 stope production to be brought forward to Q4 FY2016.


    A Life-of-Mine update is expected to be released in Q4 FY2016 following completion of Diamond drilling in C5 and subsequent Mineral Resource and Ore Reserve modelling.


    Figure 2: High-grade massive sulphides in the face of a new ore drive in the C5 orebody, January 2016


  5. Processing


  6. Key processing metrics for the December Quarter included:


    • 399,940 tonnes milled at an average head feed grade of 4.8% Cu (September Quarter: 387,864 tonnes at 4.7% Cu);

    • Overall copper recovery of 91.2% (September Quarter: 91.2%);

    • Concentrate production of 72,039 tonnes (September Quarter: 67,024 tonnes); and

    • Metal production of 17,642 tonnes of contained copper and 9,420 ounces of contained gold (September Quarter: 16,638 tonnes of contained copper and 7,885 ounces of contained gold).

Read the rest of the article at www.publicnow.com
Data and Statistics for these countries : Georgia | All
Gold and Silver Prices for these countries : Georgia | All

Sandfire Resources NL

DEVELOPMENT STAGE
CODE : SFR.AX
ISIN : AU000000SFR8
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Sandfire is a copper and gold exploration company based in Australia.

Sandfire develops copper, gold and silver in Australia, and holds various exploration projects in Australia.

Its main asset in development is DEGRUSSA in Australia and its main exploration properties are URANDY, YANNARIE, BORROLOOLA and DOOLGUNNA in Australia.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Sandfire Resources NL
1/22/2019Australia's MOD rejects Sandfire bid as undervalued, willing...
Nominations of Sandfire Resources NL
7/30/2010Appointment of Independent Non-Executive Director
Project news of Sandfire Resources NL
11/8/2015PMY: Drilling Halted at Coppermine Creek & DHEM to Commence
8/6/2015PMY: Coppermine Creek Results
4/27/2011(Degrussa)DeGrussa underground development commences
4/1/2011(Degrussa)DeGrussa Project: Maiden Open Pit Ore Reserve
3/23/2011(Degrussa)Orders Key Long-Lead Items for DeGrussa Copper-Gold Project
1/21/2010(Doolgunna)Offers Significant Upside
12/22/2009(Doolgunna)Further Outstanding Results
11/27/2009(Doolgunna)Drilling Strengthens Third Vms Copper-Gold Discovery
11/9/2009(Doolgunna)New Results Confirm Third High-Grade Copper-Gold Discovery
10/22/2009(Doolgunna)Fresh Results Point to Exciting New Discovery
10/15/2009(Doolgunna)Spectacular New Drilling Results
11/9/2009(Doolgunna)New results confirm third high-grade copper-gold discovery a...
10/1/2009(Doolgunna)Bell Potter Research Update on Sandfire Resources
9/23/2009(Doolgunna)Doolgunna Drilling Continues to Deliver
9/17/2009(Doolgunna)Looking like a terrific discovery at Doolgunna
9/2/2009(Doolgunna)DOOLGUNNA: 93.6 METRE MINERALISED INTERSECTION
8/19/2009(Doolgunna)Doolgunna: Further Drilling Success
8/10/2009(Doolgunna)Drilling at Doolgunna Returns More Promising Results
7/23/2009(Doolgunna)Further Outstanding Copper Intersections From Doolgunna
7/21/2009(Doolgunna)21.35m of Sulphides Intersected in Third Diamond Hole
7/20/2009(Doolgunna)27 % Copper intersected over 8 metres at Doolgunna
7/15/2009(Doolgunna)Drilling Extends Known Limits of Conductor 1 Mineralisation
7/8/2009(Doolgunna)More Evidence of a Substantial Discovery at Doolgunna
7/6/2009(Doolgunna)High Grade Intersections Point to Significant Discovery at D...
6/17/2009(Doolgunna)New massive sulphide discovery north of Degrussa opens up Do...
5/21/2009(Doolgunna)Degrussa Drilling Returns +100 Metres of Copper Sulphide Min...
5/18/2009(Doolgunna)New high-grade Gold and Copper discovery at Degrussa
5/18/2009New High-Grade Gold and Copper Discovery at Degrussa Prospec...
Corporate news of Sandfire Resources NL
8/1/20162016 Diggers and Dealers Presentation
7/28/2016Quarterly Activities and Cashflow Report
7/27/2016Sandfire June 2016 Quarterly Report Presentation
7/27/2016Sandfire June 2016 Quarterly Report
7/26/2016Ceasing to be a substantial holder
7/25/2016Quarterly Activities Report
7/13/2016Monty Mining Lease Application
7/13/2016TLM: Monty Mining Lease Application
7/13/2016Ceasing to be a substantial holder from CBA
7/7/2016Sandfire Achieves Record Annual Copper Production
6/30/2016Appendix 3B
6/30/2016PMY: Zinc and Copper Exploration to Commence Immediately
6/8/2016TLM: Springfield Project Update
6/8/2016PEA: Completion of Largest Hybrid Power Station in Australia
6/8/2016DeGrussa Solar Project
6/3/2016Change of Director's Interest Notice
5/31/2016Change in substantial holding
1/29/2016Quarterly Report and Appendix 5B
1/29/2016Quarterly Activities and Cashflow Report
1/29/2016Becoming a substantial holder from CBA
1/28/2016Quarterly Activities Report
1/27/2016Sandfire December 2015 Quarterly Report
1/27/2016Sandfire December 2015 Quarterly Report Presentation
1/27/2016Quarterly Report Period Ended 31 December 2015
1/19/2016Doolgunna Project - Monty Update
1/19/2016TLM: Monty Exploration Update
1/15/2016Appendix 3B
1/15/2016AIS: COMPLETION OF SALE OF EXPLORATION PROJECTS
1/7/2016COMPLETION OF SALE OF EXPLORATION PROJECTS
12/18/2015Initial Director's Interest Notice
12/18/2015Non-Executive Director Appointment
12/16/2015TLM: Monty Exploration Update
12/16/2015Doolgunna Project - Monty Update
11/30/2015DeGrussa Solar Project Update
11/24/2015Change of Director's Interest Notice
11/24/2015Appendix 3B
11/18/20152015 AGM Presentation
11/4/2015TLM: Monty - Assay Results and Exploration Update
11/4/2015Doolgunna Project - Monty Exploration Update
11/2/2015Ceasing to be a substantial holder from IFL
10/29/2015Quarterly Activities Report
10/27/2015Change in substantial holding from IFL
10/23/2015OZ Minerals boosts forecast copper output, weak Aussie dolla...
10/22/2015Sandfire September 2015 Quarterly Report
10/22/2015Sandfire September 2015 Quarterly Report Presentation
10/21/2015Annual Report - including Shareholder Information
10/20/20152015 Annual Report
10/20/2015Notice of Annual General Meeting/Proxy Form
10/20/20152015 Appendix 4G
10/16/2015Ceasing to be a substantial holder from CBA
10/14/2015TLM: Monty - Exploration Update
10/14/2015Doolgunna Project - Monty Exploration Update
10/14/2015Change in substantial holding from IFL
10/7/20152015 Sustainability Report
10/6/2015VRX: Diamond Drilling at Thaduna Green Dragon
10/5/2015SRQ: SALE OF TEMORA AND CURRUMBURRAMA EXPLORATION PROJECTS
10/2/2015VRX: Sandfire RC Drilling at Thaduna Copper Project
10/1/2015Doolgunna Project - Monty Exploration Update
10/1/2015TLM: Monty - Exploration Update
9/30/2015Annual Report to shareholders
9/30/2015Change in substantial holding from IFL
9/30/2015Ceasing to be a substantial holder
9/28/2015Becoming a substantial holder from CBA
9/24/2015Resources Rising Stars Investor Presentation
9/24/2015PMY: Earns 51% in Borroloola and Drilling to Commence
9/21/2015TLM: Monty Update
9/21/2015Doolgunna Project - Drilling Update
9/17/2015Doolgunna Project - Drilling Update
9/17/2015TLM: Monty - Drilling Update
9/13/2015Doolgunna Project - Drilling Update
9/13/2015TLM: Monty - Drilling Update
9/9/2015MEP: SFR continues earn-in at Altia project, Cloncurry
9/8/2015Change in substantial holding
9/8/2015PMY: Work continues Ahead of Diamond Drilling
9/7/2015TLM: Monty - Assay Results
9/7/2015Doolgunna Project - Assay Results
9/3/2015Ceasing to be a substantial holder
9/1/2015Investor Presentation
8/31/2015Change in substantial holding
8/23/2015TLM: Monty -Drilling Update
8/23/2015Doolgunna Project - Drilling Update
8/17/2015Becoming a substantial holder from IFL
8/12/2015Doolgunna Project - Assay Results
8/12/2015TLM: Monty - Assay Results
8/2/2015DeGrussa Copper Mine Site Visit Presentation
8/2/20152015 Diggers and Dealers Presentation
8/2/2015TLM: Monty -Drilling Update
8/2/2015Doolgunna Project - Drilling Update
7/30/2015Ceasing to be a substantial holder
7/28/2015Sandfire June 2015 Quarterly Report Presentation
7/28/2015Sandfire June 2015 Quarterly Report
7/28/2015Change in substantial holding
7/26/2015TLM: Monty Prospect Drilling Update
7/26/2015Doolgunna Project - Drilling Update
7/22/2015Becoming a substantial holder
7/20/2015Doolgunna Project - Assay Results
7/20/2015TLM: Monty Prospect - Assay Results
7/20/2015Change in substantial holding from NAB
7/19/2015TLM: Monty Drilling Update
7/19/2015Doolgunna Project - Drilling Update
7/17/2015Becoming a substantial holder
7/17/2015Ceasing to be a substantial holder from IFL
7/15/2015DeGrussa Solar Power Project Construction
7/3/2015Becoming a substantial holder - NAB
6/16/2015Doolgunna Project - Exploration Update
6/16/2015TLM: Springfield Exploration Update
6/16/2015Ceasing to be a substantial holder - NAB
6/16/2015Change of Director's Interest Notice
6/16/2015Lapse of Unlisted Options
6/15/2015Appendix 3B
6/10/2015Becoming a substantial holder from NAB
4/23/2015Appendix 3B
4/22/2015Sandfire March 2015 Quarterly Report
4/22/2015Sandfire March 2015 Quarterly Report Presentation
4/22/2015Sandfire Completes Restructure of DeGrussa Finance Facility
4/21/2015Executive Long Term Incentive Plan
4/19/2015OZL: OZ Minerals New Strategy Announced
4/13/2015Becoming a substantial holder from IFL
3/31/2015Finance Facility Repayment Profile
3/27/2015Ceasing to be a substantial holder from CBA
3/25/2015Ceasing to be a substantial holder from MQG
3/25/2015Becoming a substantial holder from MQG
3/25/2015OZL: Sale of equity investment complete
3/25/2015Trading Halt
3/25/2015Becoming a substantial holder from CBA
3/25/2015Sale of shares by OZ Minerals
3/25/2015Sandfire Announce 2014 Half Year Results
3/25/20152014 Half Year Results Presentation and Operations Update
3/25/20152014 Half Year Report and Appendix 4D
3/25/2015Ceasing to be a substantial holder from OZL
12/28/2014SRI: Sipa Reaches Agreement to Divest Thaduna
12/23/2014Change of Director's Interest Notice
11/20/2014Chairman's Address to Shareholders
11/20/2014AGM Presentation
11/13/2014Change of Director's Interest Notice
11/12/2014Appendix 3B
11/5/2014Cancellation of Unlisted Options
10/28/2014Change of Director's Interest Notice
10/15/2014Sandfire September 2014 Quarterly Report
9/2/2014Australian company to buy $16M in Tintina shares
8/30/2014Sandfire Resources NL - Early Warning Report
12/19/2013Talisman Secures $15M Farm-in deal with Sandfire
12/9/2013Horseshoe awarded WA Govt Grant for Kumarina Project
11/12/2013New Potentially Mineralised Structure at Kumarina Project
6/3/2011(Degrussa)Awards underground mining and process plant contracts for De...
6/3/2011(Degrussa)Delivers DeGrussa Feasibility Study
4/13/2011Quarterly Report for the Period Ending 31 March 2011
3/4/2011(Degrussa)DeGrussa Project: Approved for development
7/30/2010Quarterly Report for the Period Ending 30 June 2010
7/30/2010Chairman's Letter to Shareholders
7/23/2010Raises $93.9M to Fund Unprecedented Exploration Campaign and...
7/7/2010New Discovery at Degrussa Copper-Gold Project
5/4/2010Degrussa Chalcocite Grades to 52% Copper
3/29/2010Embarks on $8M Exploration Drive
3/19/2010Mining lease application for Degrussa
3/5/2010GLOBAL INVESTOR ROADSHOW PRESENTATION
3/2/2010RESULTS OF MEETING
2/8/2010DeGrussa Project and Company Update
2/8/2010Alchemy set for aggressive exploration program on Sandfire b...
12/22/2009Board Announcement
2/22/2010Phase I Degrussa Resource: 372,000 Tonnes Of Copper And 439,...
1/22/2010BROKER RESEARCH
1/18/2010DECEMBER 2009 QUARTERLY ACTIVITIES REPORT
1/18/2010Quarterly Report For The Period Ended 31 December 2009
12/22/2009ASX RELEASE 22/12/2009
10/21/2009SEPTEMBER 2009 QUARTERLY ACTIVITIES REPORT
10/16/200915-10-2009
9/30/2009Enters into Manganese Agreement with Mineral Resources
8/19/2009ASX RELEASE 19 AUGUST 2009
8/3/2009ASX ANOUNCEMENT
7/29/2009June 2009 Quarterly Report
7/24/2009ASX ANNOUNCEMENT 22 JULY 2009
7/24/2009ASX RELEASE
7/22/2009Non-Renounceable Entitlement Offer
7/21/2009Amendment to Previous Announcement
7/6/20096-7-2009
6/22/2009Additional Massive Sulphide Intersection Recorded In Newly D...
6/22/2009ASX RELEASE 22/6/09
6/9/2009Degrussa Prospect - Update
12/11/2008MANGANESE – DRILLING PROGRESS REPORT BORROLOOLA PROJECT, NOR...
10/24/2008http://www.asx.com.au/asxpdf/20081020/pdf/31cztt41g7yzb6.pdf
9/17/2008COMMENCES DRILLING ON THE BORROLOOLA PROJECT
6/20/2008Results of 19 June 2008 General Meeting
5/22/2008Notice of General Meeting
5/5/2008 Secures Strategic Alliance with Korea's Posco
1/31/2008Quaterly activities report
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (SFR.AX)
9.38+0.81%
AUSTRALIA
AU$ 9.38
05/03 15:49 0.070
0.81%
Prev close Open
9.30 9.29
Low High
9.25 9.39
Year l/h YTD var.
6.54 -  9.63 27.27%
52 week l/h 52 week var.
5.49 -  9.63 42.55%
Volume 1 month var.
464,846 7.32%
24hGold TrendPower© : 40
Produces
Develops Copper - Gold
Explores for Copper - Gold - Lead - Silica - Silver - Uranium - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202427.72%9.846.42
202334.93%7.375.29
2022-17.33%7.500.00
202122.99%7.834.64
2020-12.30%6.272.75
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.49+0.13%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.76+1.29%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-0.92%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.59-0.38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.15+0.80%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-7.84%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.22+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.79-2.72%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 50.54+0.40%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :