NWM Mining Corp.

Published : January 05th, 2015

Copper North Mining Corp.: Carmacks 2014 Exploration Project Update

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Copper | Diamond | Gold | Market | Silver |

Copper North Mining Corp.: Carmacks 2014 Exploration Project Update

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Jan 5, 2015) - Copper North Mining Corp. ("Copper North" or the "Company") (TSX VENTURE:COL) is pleased to provide an overview of exploration on the Carmacks Project.

The Carmacks copper-gold-silver mineralization has been found in at least 15 zones, defining the mineralized northeast dipping shear structures that extend for at least five kilometres. The proposed mining area consists of zones 1, 7, 7a and 4, spanning approximately 600 metres of the main structure. The 2014 program consisted of geologic mapping, trenching, induced polarization and magnetic geophysical survey and Diamond drilling and focused on expansion of the proposed mining area. The mineral resources contained in the proposed mining area are 11.98M tonnes of Measured and Indicated resources grading 1.07% copper, 0.456 g/t gold and 4.58 g/t silver. The mineralization appears to be cutoff by northeast trending cross faults.

Dr. Harlan Meade states: "The 2014 program, composed of geological review and target priority for expansion of mineral resources adjacent to the proposed mining area at Carmacks, confirmed the opportunity for significant expansion of both oxide and sulphide mineral resources. A larger program is being planned for 2015 with the goal to expand the mineral resources in pursuit of extending the potential mine life."

South GAP Zone - 2000S Extension

This zone is located between the south extension of zones, 1, 7, 7A and 4 and 2000S zone. The South Gap target consists of an approximate 300 metre gap between the main proposed mining area and the 2000S zone. The 2000S zone has been defined by 6 drill holes with both oxide and sulphide mineralization. Drill hole WC92-01 intersected 10.67m grading 0.67% copper at a depth of 30 to 41metres. To follow up on this intercept, drill hole CN14-11 was collared 22 metres to the north northwest of WC92-01, and intersected 18.74 metres grading 0.58% copper, 0.189 g/t gold and 2.46 g/t silver at a depth 21 to 40 metres. Three other drill holes failed to intercept the mineralized zone. Additional drilling is warranted in defining the continuation of the mineralization to the northwest and location of the cross faults that are displacing the mineralization in the GAP zone. Any expansion of the 2000S zone has the potential to define a mineral resource amenable to open pit mining, and could coalesce with the main proposed pit area.

North GAP - Zone 2 Extension

The North Gap represents the area between the boundary fault that truncates the north end of Zone 1 and Zone 2; a distance of approximately 2,500 metres. Exploration this past year was focused on extending the Zone 2 mineralization along strike. Trenching indicated that Zone 2 is cutoff by a cross fault, approximately 20 metres to the northeast of the discovery outcrop and trench. Additional trenching failed to find an extension on the north side of the cross fault. Trenching to the southeast met with success.

The historic Zone 2 trench was refreshed with the excavator and the oxide copper zone was resampled. The shear fabric and distribution of oxide copper minerals indicates a steep dipping mineralized zone, trending southeast; sampling yielded 15 metres grading 0.9% copper oxide mineralization. Trenching to the southeast was successful in tracking the mineralized zone for approximately 500 metres. Sampling of mineralization was hampered by permafrost capping that limited the downslope extent. Sampling of the oxide copper mineralization in the new trenches varied from 3m grading 0.43% copper to 12 metres grading 1.05% copper.

To test the mineralization to depth, ten drill holes were undertaken and defined the mineralized structure over a distance of 450 metres. The drill holes intersected the mineral zone at depths between 9.6 metres and 81.0 metres. All holes intercepted the mineral zone and yielded an average of 10.5 metres grading a weighted average of 0.36% copper, 0.069 g/t gold and 4.37 g/t silver. The intercepts and grade of the individual intercepts is available on the Company's web site.

The trenching and drill hole intercepts in Zone 2 confirm the continuity of the mineralization to the south. Additional exploration is warranted to determine if the Zone 2 mineralization is an extension of Zone 1. Of interest, part of the target area is covered by near flat lying Cretaceous volcanic rocks, which may well provide an erosional cover that may preserve the oxidized mineralization. The preservation of oxide mineralization to depth is key to developing additional substantial oxide copper resources.

The target area between the most southerly intercept and the boundary fault is approximately 2,000 metres long, the North Gap Zone, is the prime focus for drilling in 2015. The 2015 program will also include detailed geophysical surveys to define structural features hosting and displacing mineralization.

Drill, trench and soil samples were analyzed by ALS Ltd, in Vancouver, BC. Duplicate samples of drill core were collected at 20 sample intervals and analyzed by Acme Analytical Laboratories Ltd. Sample Standards and sample blanks were inserted with each sample shipment, with each of the laboratories.

Scott Casselman, P.Geo., supervised the exploration and drilling on Carmacks property. Dr. Harlan Meade, P.Geo., is the Qualified Person responsible for the preparation of this news release.

On behalf of the Board of Directors:

Dr. Harlan Meade, President, CEO and Director

About Copper North

Copper North is a Canadian mineral exploration and development company. Copper North's assets include the Carmacks Project located in the Yukon, the Redstone Property located in the Northwest Territories, and the Thor Property in British Columbia. Copper North trades on the TSX Venture Exchange under the symbol COL.

Carmacks 2014 Drill Hole Results

The following table provides the details of the 10 holes completed on the Zone Extension and drill hole CN14-11 in the Gap Zone. Drill holes CN14-12 to 14 did not penetrate the mineralized structure. All holes dip steeply and are assumed to be vertical for estimation of true width.

Drill Hole Northing
(m)
Easting
(m)
Interval
(m)
Dip Drill width
(m)
True
Width
(m)
Total
Cu %
Au
g/t
Ag
g/t
Zone 2 Extension
CN14-01 410788 6916686 9.60 - 19.78 45 10.18 7.74 0.54 0.061 5.97
CN14-02 410788 6916686 14.10 - 21.60 70 7.50 3.40 0.48 0.152 22.34
CN14-03 410847 6916665 21.06 - 28.95 46 7.89 5.92 0.45 0.037 2.90
CN14-04 410847 6916665 28.90 - 42.20 70 13.30 8.42 0.51 0.055 5.89
CN14-05 411024 6916554 22.00 - 34.00 45 12.00 6.04 0.24 0.033 1.02
CN14-06 411024 6916554 49.70 - 60.70 70 11.00 4.99 0.45 0.079 2.55
CN14-07 411095 6916526 24.20 - 33.30 45 9.10 6.92 0.13 0.040 0.071
CN14-08 411095 6916526 49.80 - 57.80 70 8.00 3.63 0.21 0.043 2.35
CN14-09 411193 6916493 22.80 - 24.80 45 2.00 1.52 0.29 0.044 1.45
CN14-10 411193 6916493 57.00 - 81.00 70 24.00 10.90 0.38 0.103 2.54
GAP Zone
CN14-11 412241 6912937 21.26 - 40.00 50 18.74 13.25 0.58 0.189 2.46

This news release includes certain forward-looking information or forward-looking statements for the purposes of applicable securities laws. These statements include, among others, statements with respect to results from previous exploration on the Carmacks Project; proposed exploration plans, their timing, and results achieved from such activity; the potential for expanding the known mineral resources; development, engineering and permitting activities, and their timing; and future economic operating results. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors, which may cause the actual results, performance or achievements to differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations include, among others, the timing and success of future exploration and development activities, exploration and development risks, market prices, exploitation and exploration results, availability of capital and financing, general economic, market or business conditions, uninsured risks, regulatory changes, defects in title, availability of personnel, materials and equipment, unanticipated environmental impacts on operations and other exploration risks detailed herein and from time to time in the filings made by the Company with securities regulators. In making the forward-looking statements, the Company has applied several material assumptions including, but not limited to, the proposed exploration and development of the Carmacks Project will proceed as planned; early exploration success will increase mineral resources; market fundamentals will result in sustained metals and mineral prices, and any additional financing needed will be available on reasonable terms. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise except as otherwise required by applicable securities legislation.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Read the rest of the article at finance.yahoo.com

NWM Mining Corp.

PRODUCER
CODE : COL.V
ISIN : CA62946X1042
CUSIP : 197801103
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

MWN Mining is a gold development stage company based in Canada.

MWN Mining holds various exploration projects in Mexico.

Its main asset in production is LLUVIA DE ORO in Mexico and its main exploration properties are NORTH SONORA, CAMPAMENTO MEXICO and LLUVIA JOJOBA in Mexico.

MWN Mining is listed in Canada and in United States of America. Its market capitalisation is CA$ 1.5 millions as of today (US$ 1.2 millions, € 973 367).

Its stock quote reached its highest recent level on July 07, 2006 at CA$ 0.41, and its lowest recent point on April 01, 2020 at CA$ 0.01.

MWN Mining has 30 110 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of NWM Mining Corp.
Annual Report 2007
Financings of NWM Mining Corp.
3/19/2015Copper North Completes Private Placement
11/4/2013Copper North Extends Expiry Date of Warrants
10/30/2009NWM Mining Corporation Announces Closing of the Previously A...
10/1/2009Initial Closing and an Increase and Extension in Size of Pri...
9/4/2009Finalizes Terms for Non-Brokered Private Placement
7/28/2009NWM Press Release - NWM Mining Announces Non-Brokered Privat...
1/28/2009Announces Non-Brokered Private Placement
12/11/2008NWM Mining Press Release - NWM Announces First Draw on New C...
4/9/2008Announces Non-Brokered Private Placement
Option Grants of NWM Mining Corp.
10/2/2009NWM Mining Corporation Grants Stock Options
Nominations of NWM Mining Corp.
5/22/2013NWM Appoints Darren Koningen, P.Eng as President & COO
6/29/2012Mark Selby Joins NWM Board of Directors
5/13/2011NWM announces John Van De Beuken as COO
Project news of NWM Mining Corp.
1/31/2013NWM Reports 2012 Production Highlights
9/27/2012NWM Drills 1.03 g/t Au over 23.0 Metres from surface at Gold...
6/6/2012NWM Reports High Grade Results on Drilling at Gold Ridge
8/3/2011NWM Provides Lluvia-Jojoba Mine Update For July
7/7/2011NWM Provides Lluvia-Jojoba Mine Update & Announces New CFO
6/1/2011(Lluvia De Oro)NWM Provides Update on Gold Ridge Zone Exploration
5/26/2011(Lluvia Jojoba)Bi-weekly Update for Lluvia-Jojoba Project May 25, 2011
5/13/2011(La Jojoba)Lluvia de Oro / La Jojoba Project Up-date
4/28/2011(Lluvia De Oro)NWM provides Gold production and Lluvia de Oro mine update
4/27/2011(Lluvia De Oro)NWM provides update on new Gold Ridge discovery zone at Lluv...
4/8/2011(Lluvia Jojoba)NWM identifies another exploration target with high gold-cop...
3/31/2011(La Jojoba)NWM reports high-grade gold intercepts (3m of 11.15 g/t Au) ...
3/29/2011(La Jojoba)Bi-weekly Update for Lluvia-Jojoba Mine : 29, March, 2011
2/9/2011(Campamento Mexico)NWM Commences Exploration at Campamento
12/1/2010(Lluvia De Oro)NWM Drills 15 Meters of 1.082 g/t Au, 18.88 g/t Ag and 0.401...
7/21/2010(La Jojoba) Files Pre-Feasibility with Increase in Reserves
7/20/2010(Lluvia De Oro)Drills 2.155 g/t Au over 25.9 Meters at Lluvia de Oro (R10-0...
5/19/2010(La Jojoba)Lluvia de Oro & La Jojoba Mineral Resources and Reserves
9/17/2009(Lluvia De Oro)Lluvia de Oro Mine Update
8/8/2009(Lluvia De Oro)Lluvia de Oro Mine Update
7/24/2009(Lluvia De Oro)Lluvia de Oro Mine Update
3/5/2009(Lluvia De Oro)Assumes Financial and Operational Obligations at Lluvia-Jojo...
2/19/2009NI 43-101 Compliant Report for Sierra Pinta Gold Mine
11/14/2008(Lluvia De Oro)Lluvia de Oro Mine Update
6/4/2008(Lluvia De Oro)Lluvia de Oro Mine Update
5/7/2008(Lluvia De Oro)Lluvia de Oro Mine Update
2/26/2008(Lluvia De Oro)Lluvia-Jojoba Gold and Copper Mine Project Update
12/21/2007(Pii (pescarado Ii )) Files NI 43-101 Technical Report For PII, 2005-2007
10/2/2007(Lluvia De Oro)Columbia Metals Report - Lluvia de Oro Site - Bi-Weekly Upd...
Corporate news of NWM Mining Corp.
1/11/2016Copper North Announces Results of Phase 2 Drilling at Carmac...
10/26/2015Copper North Resumes Drilling of Carmacks Copper Mineralizat...
10/22/2015Copper North Clarifies Technical Disclosure
9/23/2015Copper North Expands Copper-Gold Mineralization at Carmacks ...
9/8/2015Copper North Announces Results From Drilling at Carmacks Pro...
8/4/2015Copper North Drilling Expands Copper Mineralization at Carma...
7/20/2015Copper North Commences Drilling at Carmacks Project, Yukon
7/2/2015Copper North Updates Improved Processing Plan for Carmacks P...
1/26/2015Expectations on Stimulus Fuel Hope for Copper Demand
1/21/2015Copper North Mining Corp.: Agitated Leach Process Provides O...
1/8/2015Copper North Grants Stock Options
1/5/2015Copper North Mining Corp.: Carmacks 2014 Exploration Project...
12/8/2014Copper North Clarifies Disclosure
11/25/2014Copper North Completes Warrant Incentive Program
11/17/2014Copper North Appoints Joseph Ringwald as Project Manager for...
10/14/2014Copper North Announces Joint Canada-China Feasibility Study ...
10/1/2014Copper North Commences Geophysical Survey on Thor Property i...
9/2/2014Copper North Progress at Carmacks Project, Yukon
8/27/2014Copper North Grants Stock Options
8/21/2014Copper North Exploration Success on Carmacks Project, Yukon
7/14/2014Copper North Files Carmacks Preliminary Economic Assessment
7/11/2014Copper North Completes Acquisition of Thor Property
7/2/2014Copper North Announces Agreement to Acquire Thor Property in...
6/23/2014Copper North Issues Shares to Repay Debt
6/17/2014Copper North Announces Loan Conversion
5/30/2014Copper North Announces Results of Preliminary Economic Asses...
4/25/2014Copper North Announces Closing of Private Placement
9/30/2013Copper North Executes Share Exchange Agreement
8/29/2013TORONTO =E2?? NWM Announces Start of Mining
6/28/2013NWM Announces Issuance of Bonus Shares
6/15/2013NWM Announces Debt Extension and Embarks on New Direction un...
5/8/2013Copper North Announces Loan Agreement and Deferred Salary Ag...
5/1/2013NWM reports a net income of $3,393,813 for 2012
4/4/2013(Lluvia De Oro)NWM Announces Drill Program to Increase Resources/Reserves a...
2/19/2013NWM Engages U.S. Business Development and Investor Relations...
2/19/2013Copper North Announces Results of 2012 Exploration Program, ...
1/17/2013Corporate Update January 17, 2013
10/16/2012Corporate Update October 17, 2012
9/21/2012NWM Successfully Negotiates Extension of Debt Facility to Ju...
8/31/2012NWM Loan Facility Update
8/23/2012NWM reports a profit of $1.8 million for Q2 2012
6/26/2012NWM and BioteQ Settle Lawsuit
6/19/2012NWM Signs Agreement to Purchase SART Plant Equipment
5/31/2012NWM reports a profit of $2.1 million for Q1 2012
4/26/2012NWM and BioteQ Settle Lawsuit
4/11/2012NWM produces 4,761 oz. Au in Q1.2012
2/7/2012NWM January Operational Update and Private Placement
1/17/2012NWM Provides Q4 2011 Update
11/30/2011Corporate Update November 18, 2011
9/30/2011Corporate Update September 23, 2011
9/12/2011Corporate Update September 9, 2011
8/29/2011NWM Q2 2011 Results and Lluvia-Jojoba Project Update
8/26/2011Corporate Update August 26, 2011
6/28/2011Greg McCoach Provides NWM Update
8/20/2010NWM Begins Mining at Lluvia de Oro & Draws on Standby Facili...
4/23/2010Receives Permits for Mining
1/5/2010NWM Mining Corporation Announces Share Issuance
12/15/2009First Phase Drill Program to Commence at Lluvia de Oro / La ...
12/8/2009NWM Settles Outstanding Tara Gold Resources Interest in Lluv...
8/10/2009New NWM Mining Corporation Presentation
6/24/2009Announces New Trading Symbol
3/10/2009Announces Share Issue
2/10/2009New Mining and Oil & Gas Research Website - StockResearchPor...
1/27/2009NWM Announces Convertible Debenture Restructuring
10/1/2008Lluvia de Oro Mine Update
9/17/2008Lluvia de Oro Mine Update
9/4/2008Lluvia de Oro Mine Update
8/20/2008Lluvia de Oro Mine Update
8/1/2008Press Release - NWM Pours First Gold at Lluvia-Jojoba Projec...
7/31/2008Lluvia de Oro Mine Update
7/25/2008Acorns to Mighty Oaks Initial Review - Published on Stockhou...
7/16/2008Lluvia de Oro Mine Update
7/2/2008Lluvia de Oro Mine Update
6/27/2008Columbia Announces Name Change
6/18/2008Lluvia de Oro Mine Update
6/5/2008 Profiled in The Market Traders' Commodity Supercycle Report
5/9/2008Hinde Gold Fund April 2008 Investor Letter
4/8/2008 Reports Option Payment at Lluvia de Oro
4/7/2008 Announces CDN $3M Financing Facility for Lluvia-Jojoba Gold
4/3/2008 Lluvia de Oro Mine Update
3/26/2008 Announces Addition To The Board of Directors
2/24/2008Lluvia de Oro Mine Update
1/16/2008Lluvia de Oro Mine Update
12/14/2007Lluvia de Oro Site - Bi-Weekly Update
12/12/2007Reports Option Payment at Lluvia de Oro
10/31/2007Lluvia de Oro Site - Bi-Weekly
10/30/2007Purchases Heavy Equipment for Lluvia de Oro Gold Mine
10/4/2007 Announces Transfer of Environmental & Mining Permits
9/18/2007Lluvia de Oro Site - Bi-Weekly Update - RESEND
9/1/2007(angl) Announces Investor Relations Engagement
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (COL.V)OTHER OTC (NWMMF)
0.050+0.00%0.003+0.00%
TSX-V
CA$ 0.050
11/30 10:46 -
0%
Prev close Open
0.050 0.055
Low High
0.050 0.055
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.050 -%
Volume 1 month var.
14,000 -%
24hGold TrendPower© : -28
Produces Gold
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2020100.00%0.070.01
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.45-1.19%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.55+0.79%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.12%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.63-0.75%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.35-2.35%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.26+4.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.22-2.17%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.83+5.17%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 50.42-1.48%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :