Iluka Half Year Results to 30 June 2015 (18 Aug 2015)

Australian Securities Exchange Notice

18 August 2015

ILUKA HALF YEAR RESULTS SIX MONTHS TO 30 JUNE 2015

Summary of Financial Results

$ million

1st Half 2015

1st Half 2014

% change

Mineral Sands Revenue

349.6

343.2

2.0

Mineral Sands EBITDA

114.4

107.9

6.0

Mineral Sands EBITDA/ revenue (%)

32.7

31.4

4.1

Mining Area C EBIT

39.0

38.0

2.6

Group EBITDA

127.2

125.8

1.1

Group EBITDA / revenue (%)

32.7

33.0

(0.9)

Group EBIT

43.5

31.5

38.1

Reported Earnings (NPAT)

20.4

11.7

74.4

Earnings per share (cents)

4.9

2.8

75.0

Operating Cash Flow

92.1

101.9

(9.6)

Free Cash Flow1

39.0

63.9

(39.0)

FCF per share (cents)

9.3

15.3

(39.1)

Dividend per share (cents)

6.0

6.0

-

Net Debt

(80.2)

(155.2)

48.3

Gearing (net debt/net debt + equity) (%)

5.4

9.2

40.9

Return on Capital, annualised (%)2

4.7

3.1

54.3

Return on Equity, annualised (%)3

2.9

1.5

92.7

Average AUD/USD (cents)

78.3

91.4

14.3

Key Features of Results

Iluka recorded mineral sands revenue for the first half of 2015 of $349.6 million, marginally higher than the previous corresponding period (2014: $343.2 million). Revenue for the main products of zircon/rutile/synthetic rutile (Z/R/SR), excluding by-product revenues from the sale of ilmenite concentrate, iron concentrate and activated carbon, was $311.7 million, a 10.8 per cent increase (2014:

$281.3 million).

1 Free Cash Flow is determined as cash flow before refinance costs, proceeds/repayment of borrowings and dividends paid in the year.

2 Calculated as EBIT on an annualised basis as a percentage of average monthly capital employed for the year.

3 Calculated as NPAT on an annualised basis as a percentage of the average monthly shareholders ' equity. All currency in Australian dollars unless otherwise stated.

Iluka Resources Limited • ABN 34 008 675 018 • Level 23 140 St Georges Terrace Perth WA 6000

GPO Box U1988 Perth WA 6845 • T +61 8 9360 4700 • F +61 8 9360 4777 • www.iluka.com

Z/R/SR sales volumes in the first half of 2015 were 0.4 per cent lower than the previous corresponding period, with the higher Z/R/SR revenue reflecting an increased average realised Australian dollar revenue per tonne, due to a lower exchange rate offsetting marginally lower volumes and weighted average received US dollar sales prices. Lower by-product revenues reflect Iluka's decision to sell less iron concentrate and ilmenite concentrate given prevailing prices for these products.

Iluka reported a net profit after tax of $20.4 million for the first half of 2015, compared with $11.7 million for the previous corresponding period. Higher earnings reflect a lower exchange rate combined with lower depreciation charges.

Free cash flow of $39.0 million was generated in the first half, compared with $63.9 million in the previous corresponding period. This decline was in part due to receipts from the Mining Area C (MAC) royalty declining by $14.2 million as a result of lower iron ore prices, and lower operating receipts due to timing of cash collections. Included in MAC income is a US$8.0 million receipt, associated with changes to the MAC royalty arrangement, to be received in the second half of 2015.

Combined Z/R/SR sales volumes in the first half of 2015 were similar at 275.9 thousand tonnes compared to 277.1 thousand tonnes in 2014. Zircon sales increased 4.9 per cent period-on-period to

153.4 thousand tonnes. Combined rutile and synthetic rutile sales volumes of 122.5 thousand tonnes
were marginally lower than the first half of 2014 (130.8 thousand tonnes), mainly reflecting scheduling of high grade titanium dioxide sales during the year, with some customers rebalancing their supply chains in line with the ramp up of Iluka's synthetic rutile production, which re-commenced in April. The majority of Iluka's high grade ore sales are now contracted for 2015, including from the recently re-started synthetic rutile kiln 2. As Iluka has advised previously, the company expects overall sales volumes to be second half weighted.

Cash costs of production declined by 12.6 per cent to $175.5 million (2014: $200.7 million), associated mainly with lower production of by-products and ilmenite concentrate (by-product costs were $14.5 million lower period-on-period). Total cash cost of production for Z/R/SR, excluding by-products was

$170.5 million (2014: $181.2 million).

Unit cash costs of production for Z/R/SR (excluding by-product costs) in the first half of 2015 were

$616/tonne, compared with $719/tonne in the first half of 2014 and a 2014 full year unit cash cost of
$668/tonne. Lower unit cash costs reflect higher production and completion of mining at Woornack, Rownack, Pirro in the Murray Basin, amongst other factors.

Including by-products, unit cash costs of production of Z/R/SR were down 20.4 per cent to $634 per tonne of Z/R/SR compared with the previous corresponding period.

Mineral sands EBITDA for the first half of 2015 was $114.4 million, a 6.0 per cent increase compared with the previous corresponding period. Mineral sands EBIT was $30.8 million, up 123.2 per cent (2014:

$13.8 million).

MAC iron ore royalty earnings increased by 2.6 per cent to $39.0 million (2014: $38.0 million), including capacity payments of $3.0 million (2013: $1.0 million) and a one off US$8.0 million receipt associated with changes to the MAC royalty arrangement.

Group EBIT was $43.5 million, up 38.1 per cent compared to the previous corresponding period (2014:

$31.5 million).

Inventory value increased by $17.6 million, mainly reflecting a slight increase of work in progress (mainly heavy mineral concentrate), up $20.8 million. Finished goods inventory value decreased by $5.5 million. Total inventory held on the balance sheet at 30 June 2015 was $827.8 million, compared with $810.2 million as at 31 December 2014 and $815.2 million as at 30 June 2014.

As advised previously, Iluka built inventory of both finished rutile products as well as heavy mineral concentrate in the Murray Basin, in advance of the cessation of mining activities at Woornack, Rownack, Pirro in the first quarter of 2015. This inventory of finished product and concentrate will be utilised in the period leading up to the next planned mining operation in the Murray Basin, the Balranald deposit.

Capital expenditure of $35.5 million was incurred in the first half of the year, related to various major projects including Cataby (Western Australia), Balranald (New South Wales) and land acquisitions.

Net debt as at 30 June 2015 was $80.2 million, with a gearing ratio (net debt/net debt + equity) of 5.4 per cent. This compares with net debt at 30 June 2014 of $155.2 million and a gearing ratio of 9.2 per cent

Page 2 of 6

and at 31 December 2014 of $59.0 million with an associated gearing ratio of 3.9 per cent. The increase in net debt from 31 December 2014 reflects free cash flow for the period of $39.0 million, offset by currency translation impacts of $4.6 million on the USD component of net debt and the payment of $54.4 million in respect of the 13 cent final dividend for 2014 in March 2015.

Undrawn facilities at 30 June 2015 were $784.9 million and cash and cash equivalents were $79.3 million.

Net debt at 31 July 2015 was $71.0 million with a gearing ratio of 4.8 per cent. Iluka's undrawn facilities at 31 July were $806.5 million.

During 2015 Iluka has increased the size of the Multi Option Facility Agreement (MOFA) facilities by

$100.0 million to $950.0 million through the addition of a new bilateral facility to April 2020 and the expansion of an existing facility. Iluka repaid the final tranche of the US Private Placement Notes in June
2015 (US$20.0 million).

Dividend

Directors have determined an interim dividend of 6.0 cents per share, fully franked. The dividend is payable on 29 September 2015 for shareholders on the register as at 2 September 2015. This dividend compares with a 2014 interim dividend of 6.0 cents (fully franked).

Market Conditions

Zircon

A feature of the half was the implementation of Iluka's pricing and payments framework, which occurred in all markets, mainly in March and April. Following implementation, volume momentum recovered and has continued through the month of July. Iluka continues to expect 2015 zircon sales to be second half weighted.
Regional zircon demand was characterised by the following factors:

year-to-date sales in China are in line with those in the same period in 2014;

a moderation of Iluka sales in the North American market, reflecting lower availability of Iluka's Virginia zircon supply associated with the wind down of operations in the United States, customers logically seeking alternative sources, and Iluka's sales management approach to maximise the net present value of remaining production in Virginia;

strengthening sales into both ceramic and non-ceramic sectors in Europe, which in large measure offset the reduced demand in North America; and

volume recovery in South East Asian markets and India, although still at lower than historical run rates.

Iluka's weighted average received price reflects a variety of zircon product offerings, as well as commercial arrangements with customers. As such, price outcomes can vary period-to-period. However, relative to the weighted average full year 2014 zircon price of US$1,033 per tonne FOB, the 2015 first half weighted average received price was similar.

High Grade Titanium Dioxide

Demand from pigment markets for Iluka's high grade titanium dioxide products has increased. As previously advised, the recommencement of synthetic rutile production, from kiln 2, is a reflection of demand for high grade feed stocks. While the volume of high grade product (rutile and synthetic rutile) shipped in the first half was slightly lower than the previous corresponding period in 2014, this reflects shipment scheduling with some customers rebalancing their supply chains in line with the ramp up of Iluka's synthetic rutile production. The majority of Iluka's second half rutile and synthetic rutile sales are contracted.

Page 3 of 6

The prevailing weakness in some pigment manufacturer results are not considered reflective of demand for end products, such as paints and coatings, but reflect other factors including currency movements and pigment-specific sector dynamics. Capacity utilisation and pigment inventories have been reported at usual levels.
Iluka expects chloride ilmenite sales volumes in the US to increase in the second half of 2015. Demand for sulphate based feedstocks (not a major market for Iluka) remained subdued, with Iluka shipping less sulphate ilmenite and ilmenite concentrate from its Murray Basin operations in the first half.
Weighted average received prices for rutile on a year-to-date basis are similar to the disclosed weighted average full year 2014 received price of US$777 per tonne FOB. Given that a proportion of Iluka's synthetic rutile sales are contracted to specific customers, and commercial terms are in confidence, Iluka is not able to disclose the weighted average received price for synthetic rutile. As with zircon, weighted average received price can reflect product mix factors in any period.

Group Profit and Loss Summary

1st Half 1st Half

$ million 2015 2014 % change

Z/R/SR revenue 311.7 281.3 10.8

Ilmenite and other revenue 37.9 61.9 (38.5)

Mineral sands revenue 349.6 343.2 2.0

Cash costs of production (175.5) (200.7) 12.6

Inventory movement 14.8 24.7 (40.1) Restructure and idle capacity charges (27.4) (19.2) (42.7) Rehabilitation and holding costs for closed sites (1.1) (1.7) 35.3

Government royalties (7.8) (6.9) (13.0) Marketing and selling costs (17.2) (14.1) (22.0) Asset sales and other income 2.2 1.4 57.1

Resource development (23.2) (18.8) (23.4)

Mineral sands EBITDA 114.4 107.9 6.0

Depreciation and amortisation (83.6) (94.1) 11.2

Mineral sands EBIT 30.8 13.8 123.2

Mining Area C 39.0 38.0 2.6

Corporate and other costs (23.6) (21.9) (7.8) Foreign exchange (2.7) 1.6 (268.8)

Group EBIT 43.5 31.5 38.1

Net interest and bank charges (5.8) (7.7) 24.7

Rehabilitation unwind and other finance costs (9.9) (6.6) (50.0)

Profit before tax 27.8 17.2 61.6

Tax expense (7.4) (5.5) (34.5)

Profit for the period (NPAT) 20.4 11.7 74.4

Average AUD/USD rate for the period (cents) 78.3 91.4 14.3

Mineral sands operational results

Revenue EBITDA EBIT

1st Half

1st Half

1st Half

1st Half

1st Half

1st Half

$ million

2015 2014 2015 2014 2015 2014

Australia 335.3 293.1 148.7 121.4 66.1 38.2


United States 14.3 50.1 (6.2) 9.8 (6.2) (0.1) Resource development and other4 - - (28.1) (23.3) (29.1) (24.3) Total 349.6 343.2 114.4 107.9 30.8 13.8

4

Comprises resource development, including product and technical development, exploration, corporate marketing and selling costs and asset sales and

other income.

Page 4 of 6

Mineral Sands Production and Sales Volumes

Sales (kt)

1st Half 1st Half

2015 2014 % change

Zircon 153.4 146.3 4.9

Rutile 59.1 95.5 (38.1) Synthetic rutile 63.4 35.3 79.8



Total Z/R/SR sales 275.9 277.1 (0.4) Ilmenite - saleable and upgradeable 159.5 221.8 (28.1) Total sales volumes 435.4 498.9 (12.7)

Z/R/SR revenue ($m) 311.7 281.3 10.8

Ilmenite and other revenue5 ($m) 37.9 61.9 (38.5) Total mineral sands revenue ($m) 349.6 343.2 2.0

Z/R/SR revenue per tonne of Z/R/SR sold ($/t) 1,130 1,015 11.3

Production (kt)

Zircon 163.3 174.0 (6.1) Rutile 56.2 78.1 (28.0) Synthetic rutile 57.4 - n/a

Total Z/R/SR production 276.9 252.1 9.8

Ilmenite - saleable and upgradeable 195.1 226.8 (14.0)


Total Mineral Sands Production 472.0 478.9 (1.4)

Heavy mineral concentrate produced 632 676 (6.6) Heavy mineral concentrate processed 526 480 9.5

Z/R/SR cash costs of production ($m) 170.5 181.2 5.9

Ilmenite concentrate and by-products cash costs of production ($m) 5.0 19.5 74.4

Total cash costs of production ($m) 175.5 200.7 12.6

Unit cash cost per tonne of Z/R/SR produced excl. by-products ($/t) 616 719 14.3

Unit cash cost per tonne of Z/R/SR produced incl. by-products ($/t) 634 796 20.4

Managing Director Commentary

David Robb, Iluka Resources' Managing Director, provided the following commentary in relation to the half
year results:
"Iluka's progress year-to-date is in line with expectations that in 2015 we could see:

zircon/rutile/synthetic rutile (Z/R/SR) production higher than 2014, meeting demand;

combined Z/R/SR sales exceeding production and 2014 Z/R/SR sales;

recommencement of synthetic rutile kiln 2 production and sales;

lower unit cash costs of production;

potential foreign exchange benefits;

inventory stabilisation before drawdown;

free cash flow generation; likely more second half weighted; and

maintenance of a strong balance sheet and investment capacity.

All of these factors appear intact, based on current business indicators, and some are already well evident.

5

Include revenues derived from materials not included in production volumes, including activated carbon products and iron conc entrate.

Page 5 of 6

Overall production is expected to be second half weighted, following the safe, efficient and rapid reactivation of mining at Tutunup South and the subsequent recommencement of synthetic rutile kiln 2 in the South West of Western Australia. The SR kiln has operated at a 99 per cent utilisation rate and, as such, delivered higher than budgeted volumes, while displaying efficient unit cash cost performance. Combined sales of rutile and synthetic rutile are also expected to be second half weighted, along with revenues and free cash flow.
Free cash flow generation in the first half was associated with the decision by Directors to declare a 6 cents per share interim dividend, fully franked. Iluka's balance sheet remains strong, both absolutely and relative to many players in the resources sector, with low net debt and significant funding headroom. This enables Iluka to continue to invest in its business and to consider external investments in a counter cyclical manner where financial merit and strategic rationale are evident.
In this regard, Iluka is investing in areas such as: market development; innovation and technology; exploration; and in the advancement of its internal mineral sands projects. The company has continued its initial investment in the potentially disruptive and value creating industry opportunities associated with Metalysis and the Tapira mineralisation in Brazil. The company has also continued to work towards the satisfaction of pre-conditions to its potential acquisition of Kenmare Resources Plc.
In light of some demand recovery, but with lower cycle characteristics still evident in a number of industries, I consider the company has positioned itself appropriately and in line with its objective: to create and deliver value for shareholders."

Investment market and media enquiries

Dr Robert Porter

General Manager, Investor Relations and Corporate Affairs

Direct (Melbourne): +61 (3) 9225 5008

Mobile: +61 (0) 407 391 829

Refer Attachment - Appendix 4D for detailed financial commentary of the results.

Iluka's website contains presentational material associated with the half year results - refer

www.iluka.com



Forward Looking Statements

This announcement contains certain statements which constitute "forward-looking statements". These statements include, without limitation, estimates of future production and production potential; estimates of future capital expenditure and cash costs; estimates of future product supply, demand and consumption; statements regarding future product prices; and statements regarding the expectation of future Mineral Resources and Ore Reserves.

Where Iluka expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and on a reasonable basis. No representation or warranty, express or implied, is made by Iluka that the matters stated in this announcement will in fact be achieved or prove to be correct.

Forward-looking statements are only predictions and are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks and factors include, but are not limited to:

• changes in exchange rate assumptions;

• changes in product pricing assumptions;

• major changes in mine plans and/or resources;

• changes in equipment life or capability;

• emergence of previously underestimated technical challenges; and

• environmental or social factors which may affect a licence to operate.

Except for statutory liability which cannot be excluded, Iluka, its officers, employees and advisers expressly disclaim any responsibility for the accuracy or completeness of the material contained in this announcement and exclude all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this announcement or any error or omission there from.

Iluka does not undertake any obligation to release publicly any revisions to any forward-looking statement to reflect events or circumstances after the date of this presentation, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws.

Page 6 of 6

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Australia | Brazil | China | India | All
Gold and Silver Prices for these countries : Australia | Brazil | China | India | All

Iluka Resources Ltd

DEVELOPMENT STAGE
CODE : ILU.AX
ISIN : AU000000ILU1
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Iluka is a zircon development stage company based in Australia.

Iluka holds various exploration projects in Australia.

Its main asset in development is TRIPITAKA in Australia and its main exploration properties are ECHO, TUTUNUP SOUTH, TUTUNUP, MURRAY BASIN, EUCLEA BASIN and ENEABBA in Australia.

Iluka is listed in Australia and in Germany. Its market capitalisation is AU$ 3.1 billions as of today (US$ 2.0 billions, € 1.9 billions).

Its stock quote reached its lowest recent point on November 28, 1997 at AU$ 1.22, and its highest recent level on June 14, 2013 at AU$ 9.99.

Iluka has 418 700 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Iluka Resources Ltd
11/24/2008China Market Overview
Annual reports of Iluka Resources Ltd
2010 Annual Report documentation
2009 Annual Report
Financials of Iluka Resources Ltd
10/13/2011(ILU): Quarterly Production Report to 30 September 2011
Project news of Iluka Resources Ltd
4/12/2012March 2012 Quarterly Production Report
2/22/2012Ore Reserves and Mineral Resources Increases
1/31/2012Invitation to 2011 Full Year Results Teleconference Thursday...
1/11/2012Quarterly Production Report to 31 December 2011
12/7/2011High Grade Titanium Dioxide Pricing
7/14/2011June 2011 Quarterly Production Report
4/12/2011(ILU) - March 2011 Quarterly Production Report
7/15/2010(Euclea Basin)Typhoon Mineral Resource Estimate
11/19/2009(Euclea Basin)Jacinth-Ambrosia Commences Production
10/13/2009(Murray Basin)Murray Basin Stage 2 Production Commencement
1/30/2009(Murray Basin)Correction - ASX Announcement - Further Murray Basin Heavy M...
1/30/2009(Murray Basin)Further Murray Basin Heavy Mineral Resource Discovery
1/20/2009(Murray Basin)December Quarter 2008 Production and Development Report
1/7/2009(Murray Basin) FINAL REGULATORY APPROVALS FOR MURRAY BASIN STAGE 2 PROJECT
7/7/2008(Scm Vallenar Iron)KEY PROJECT MILESTONE FOR JACINTH-AMBROSIA PROJECT ACHIEVED
5/21/2008(Scm Vallenar Iron)Jacinth-Ambrosia Mineral Sands Development
Corporate news of Iluka Resources Ltd
8/1/2016Recommended proposal for Sierra Rutile by Iluka
8/1/2016Recommended proposal for Iluka by Sierra Rutile
7/31/2016Iluka Acquisition of Sierra Rutile Limited
7/31/2016Acquisition of Sierra Rutile Presentation
7/29/2016ANNOUNCEMENT RE ILUKA RESOURCES LIMITED
5/19/2016Iluka 2016 AGM Results of Meeting
5/18/2016Iluka 2016 AGM Addresses
4/7/2016Iluka Reference Price - Zircon
3/23/2016Notice of Annual General Meeting and Proxy Form
3/21/2016Iluka Managing Director Succession
1/20/2016December 2015 Production Report
12/16/2015Full Year Physical and Financial Update
12/7/2015Omani sovereign wealth fund holds talks to invest in Kenmare
8/19/2015Edited Transcript of ILU.AX earnings conference call or pres...
8/17/2015Iluka 2015 4D Commentary (18 Aug 2015)
8/17/2015Iluka 2015 Half Year Results Slide Pack (18 Aug 2015)
8/17/2015Iluka Half Year Results to 30 June 2015 (18 Aug 2015)
7/15/2015June 2015 Quarterly Production Report (16 Jul 2015)
3/18/2015Appendix 4G and 2014 Corporate Governance Statement (18 Mar ...
3/18/2015Term Sheet Signed with Iluka for Phar Lap IOCG Project
3/17/2015Iluka Executive Management Changes (17 Mar 2015)
2/26/2015Form 8.3 - Iluka Resources Ltd
2/19/2015Synthetic Rutile Kiln to Recommence (19 Feb 2015)
2/19/20152015 Key Physical and Financial Parameters (19 Feb 2015)
8/5/2013and Finance: Iluka secures Sri Lankan mineral sands and Gemf...
12/12/2012Market Update
3/27/2012Lodgement of Full Year Results
2/20/2012REMINDER: Iluka Resources - Invitation to 2011 Full Year Res...
8/25/2011(ILU) - Half Year Results to 30 June 2011
8/2/20112011 Half Year Results Announcement and Teleconference - Thu...
7/26/2011(Eneabba)Eneabba Mining Re-Start and 2 Kiln Operation
7/14/2011Key Physical and Financial Parameters - July update
6/3/2011Jacinth-Ambrosia Site Visit
5/25/20112011 Annual General Meeting - Chairman and Managing Director...
5/23/2011News Release
3/31/2011Response to ASX Price and Volume Query
3/4/2011Managing Director - Performance and Retention Plan
2/24/2011Full Year Results to 31 December 2010
2/14/20112010 Full Year Results announcement and investment presentat...
7/20/2010June 2010 Quarterly Production Report
7/5/2010Mining Area C Iron Ore Royalty and Zircon Demand in China
5/20/20102010 Annual General Meeting
5/17/2010Launches On-line Zircon Sales Site
4/22/2010March 2010 Quarterly Production Report
2/24/20102010-2013 Business Trends Commentary
2/24/2010Full Year Results to 31 December 2009
2/16/20102009 Full Year Results Announcement
2/10/2010Jacinth-Ambrosia Mineral Sands Project
1/19/2010December Quarter 2009 Production and Development Report
10/22/2009Extract from David Robb's TZMI Key Note Presentation
10/14/2009September 2009 Quarterly Production and Development Report
10/7/2009Mineral Sands Briefing Material
8/19/2009Half Year Results to 30 June 2009
7/27/2009Board Changes
7/16/2009June 2009 Quarterly Production and Development Report
5/28/2009Annual General Meeting
5/20/2009Final Regulatory Approval Received for Jacinth-Ambrosia Proj...
2/18/2009Full Year Results to 31 December 2008
2/19/20092009 COMMENTARY
12/19/2008Announces Early Closure of Wagerup and Waroona Mine Sites
12/9/2008FURTHER ILUKA PROFIT UPGRADE
12/3/2008WA Parliamentary Passage of Bill to Facilitate Investment in...
11/17/2008Heavy Mineral Exploration Update, Eucla Basin, South Austral...
11/17/2008Key Regulatory Approval Received for Jacinth-Ambrosia Projec...
11/10/2008 KEY REGULATORY APPROVAL RECEIVED FOR MURRAY BASIN STAGE 2 P...
8/29/2008Open Briefing Interview with David Robb, Managing Director o...
8/21/2008Half Year Results to 30 June 2008
7/17/2008June Quarter 2008 Production and Development Report
6/30/2008TO RESTART WESTERN AUSTRALIAN OPERATIONS
6/5/2008DISRUPTION OF GAS AND ELECTRICITY SUPPLY
6/5/2008Interruption to the Supply of Gas to Iluka’s WA Operations
5/21/2008DEVELOPMENT APPROVAL FOR JACINTH-AMBROSIA MINERAL SANDS PROJ...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (ILU.AX)FRANKFURT (ILZ.F)
7.35-0.27%4.42-0.54%
AUSTRALIA
AU$ 7.35
04/26 15:52 -0.020
-0.27%
Prev close Open
7.37 7.32
Low High
7.26 7.37
Year l/h YTD var.
6.29 -  7.63 10.69%
52 week l/h 52 week var.
6.29 -  11.94 -32.13%
Volume 1 month var.
358,341 1.94%
24hGold TrendPower© : 23
Produces
Develops Zircon
Explores for Ilmenite - Rutile - Zircon
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/16/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-9.93%
2023-14.38%9.9610.00
2022-5.64%9.9910.00
202155.62%9.9910.10
2020-31.76%9.9610.00
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :