TORONTO, ONTARIO--(Marketwire - May 8, 2012) -

For more information, please see Kinross' 2012 first quarter Financial Statements and MD&A at www.kinross.com.

Kinross Gold Corporation (News - Market indicators)(NYSE:KGC) today announced its results for the first quarter ended March 31, 2012.

(This news release contains forward-looking information that is subject to the risks and assumptions set out in our Cautionary Statement on Forward-Looking Information located on page seven of this news release. All dollar amounts in this news release are expressed in U.S. dollars, unless otherwise noted.)

Financial and operating highlights:

  • Production(1): 604,247 gold equivalent ounces, a 6% decrease over Q1 2011.
  • Revenue: $1,036.6 million, an 11% increase over Q1 2011.
  • Production cost of sales(2): $742 per gold equivalent ounce, compared with $545 in Q1 2011.
  • Attributable margin(3): $902 per ounce sold, a 15% increase over Q1 2011.
  • Adjusted operating cash flow(4): $339.7 million, a 14% decrease over Q1 2011. Adjusted operating cash flow per share was $0.30, compared with $0.35 in Q1 2011.
  • Adjusted net earnings(4)(5): $203.1 million, a 16% increase over Q1 2011. Adjusted net earnings per share were $0.18, compared with $0.15 in Q1 2011.
  • Reported net earnings(5): $105.7 million, or $0.09 per share, compared with $250.1 million, or $0.22 per share, for Q1 2011.
  • Outlook: The Company expects to be within its 2012 forecast guidance for production (2.6 - 2.8 million attributable gold equivalent ounces) and production cost of sales ($670 - 715 per gold equivalent ounce).

Growth projects:

  • Kinross continues to advance its capital and project optimization process, with Tasiast and Dvoinoye as key development priorities.
  • Mining activity at Tasiast has accelerated, and infrastructure development for an expanded operation is proceeding on schedule. Work towards identifying an optimum processing approach for the next phase of the expansion project remains on plan. Exploration activity has transitioned fully to step-out and district drilling.
  • The Dvoinoye feasibility study was completed on schedule and the Board has approved full construction funding. The mine is expected to produce approximately 1,000 tonnes of ore per day to be shipped to the Kupol mill, which will be upgraded to process approximately 4,500 tonnes per day. Gold equivalent production from Dvoinoye ore for the first three full years is expected to average approximately 215,000-250,000 ounces, providing total expected production from Kupol of approximately 650,000-700,000 ounces. The project is on schedule to deliver first ore to the Kupol mill in the second half of 2013.

CEO Commentary

Tye Burt, President and CEO, made the following comments in relation to first quarter 2012 results:

"Our operations continue to generate robust revenue, cash flow and earnings. While production was lower and costs were higher than Q4 2011, based on our annual plan, production for each of the remaining quarters of 2012 is expected to exceed Q1. We expect to be within our previously-stated full-year guidance for production and costs.

"Kinross remains in a strong operating and financial position. We are committed to maintaining our financial strength and liquidity as we advance our growth projects in the framework of our capital and project optimization process.

"At Tasiast, mining activity has accelerated, infrastructure construction and permitting remain on plan, and we are making progress towards selecting an optimum processing approach for a further expansion. Our exploration focus has shifted from infill drilling to step-out and district targets along the 75-kilometre land position. The Board has approved the Dvoinoye feasibility study and full construction funding, and the project is proceeding on schedule to begin shipping high-grade ore to increase Kupol production in the second half of 2013. We continue negotiations with the Ecuadorean government on an improved economic package to develop FDN, and are exploring opportunities to improve project economics at FDN as part of our optimization process."

Financial results
 
Summary of financial and operating results
 
    Three months ended
 
    March 31,
(dollars in millions, except per share and per ounce amounts)   2012   2011(d)
Total gold equivalent ounces(a) - produced(c)   611,838   700,479
Total gold equivalent ounces(a) - sold(c)   629,505   718,577
 
Attributable gold equivalent ounces(a) - produced(c)   604,247   642,857
Attributable(a) gold equivalent ounces - sold(c)   621,680   660,788
 
Metal sales $ 1,036.6 $ 937.0
Production cost of sales $ 466.4 $ 381.6
Depreciation, depletion and amortization $ 146.7 $ 153.1
Operating earnings $ 313.2 $ 330.9
Net earnings attributed to common shareholders $ 105.7 $ 250.1
Basic earnings per share $ 0.09 $ 0.22
Diluted earnings per share $ 0.09 $ 0.22
Adjusted net earnings attributed to common shareholders(b) $ 203.1 $ 175.3
Adjusted net earnings per share(b) $ 0.18 $ 0.15
Net cash flow provided from operating activities $ 381.7 $ 335.1
Adjusted operating cash flow (b) $ 339.7 $ 396.7
Adjusted operating cash flow per share(b) $ 0.30 $ 0.35
Average realized gold price per ounce $ 1,644 $ 1,327
Consolidated production cost of sales per equivalent ounce(c) sold(b) $ 741 $ 531
Attributable(a) production cost of sales per equivalent ounce(c) sold(b) $ 742 $ 545
Attributable(a) production cost of sales per ounce sold on a by-product basis(b) $ 657 $ 472
         
(a) Total includes 100% of Kupol and Chirano production. "Attributable" includes Kinross' share of Kupol (75% up to April 27, 2011, 100% thereafter) and Chirano (90%) production.
 
(b) "Adjusted net earnings attributed to common shareholders", "Adjusted net earnings per share", "Adjusted operating cash flow", "Adjusted operating cash flow per share", "Consolidated production cost of sales per equivalent ounce sold", "Attributable production cost of sales per equivalent ounce sold", and "Attributable production cost of sales per ounce sold on a by-product basis" are non-GAAP measures. The definition and reconciliation of these non-GAAP financial measures is included in page nine of this news release.
 
(c) "Gold equivalent ounces" include silver ounces produced and sold converted to a gold equivalent based on a ratio of the average spot market prices for the commodities for each period. The ratios for the first quarter were: 2012 - 51.82:1, 2011 - 43.51:1.
 
(d) Certain prior period figures have been recast as a result of finalizing the Red Back purchase price allocation in the second quarter of 2011.

Kinross produced 604,247 attributable gold equivalent ounces in the first quarter of 2012, a 6% decrease over the first quarter of 2011, mainly due to a scheduled decline in grade at Kupol, a scheduled increase in processing lower-grade stockpile ore at La Coipa, and below plan production at Tasiast. Based on the full-year mining plan for 2012, Kinross expects an increase in production during the second half in the North America, South America and West Africa regions.

Production cost of sales per gold equivalent ounce(2) was $742 compared with $545 for the first quarter of 2011, mainly due to increased processing of lower grade ore, as well as higher power, labour and contractor costs. Production cost of sales per gold ounce on a by-product basis was $657 in the first quarter of 2012, compared with $472 in Q1 2011, based on Q1 2012 attributable gold sales of 570,486 ounces and attributable silver sales of 2,652,808 ounces.

Revenue from metal sales was $1,036.6 million in the first quarter of 2012, compared with $937.0 million during the same period in 2011, an increase of 11%, due to a higher average realized gold price. The average realized gold price was $1,644 per ounce in Q1 2012, compared with $1,327 per ounce for Q1 2011.

Kinross' margin per gold equivalent ounce sold(3) was $902 for the first quarter of 2012, an increase of 15% compared with Q1 2011, due primarily to a higher realized gold price.

Adjusted operating cash flow(4) was $339.7 million for the quarter, or $0.30 per share, compared with $396.7 million, or $0.35 per share, for Q1 2011. Cash and cash equivalents were $1,486.9 million as at March 31, 2012 compared with $1,766.0 million as at December 31, 2011.

Adjusted net earnings(4)(5) were $203.1 million, or $0.18 per share, for Q1 2012, compared with $175.3 million, or $0.15 per share, for Q1 2011.

Reported net earnings(5) were $105.7 million, or $0.09 per share, for Q1 2012, compared with reported net earnings of $250.1 million, or $0.22 per share, for Q1 2011. Reported net earnings were affected by a re-measurement of deferred tax liabilities, a $110.3 million non-cash item, as a result of an increase in the Ghanaian corporate income tax rate from 25% to 35%.

Capital expenditures were $534.0 million for Q1 2012, compared with $255.9 million for the same period last year, an increase due mainly to project-related expenditures at Tasiast, Paracatu and Dvoinoye.

Operating results

Mine-by-mine summaries for first quarter 2012 operating results may be found on pages 12 and 16 of this news release. Highlights include the following:

  • North America: Production for the region remains on target for the year, despite a slight decrease year-over- year and compared with the previous quarter. The decrease from Q4 2011 was a result of lower mill feed grades at Fort Knox and slightly lower gold release from the heap leach, reflecting winter conditions. Round Mountain and Kettle River performed at the same level as Q4 2011. Regional production is scheduled to be higher in the second half of the year, as a result of accelerated heap processing and improved mill processing grades at Fort Knox. Regional production costs were higher compared with the same period last year due to lower grades at Fort Knox and Kettle River. In addition, Fort Knox experienced higher energy costs.
  • Russia: Production at Kupol was lower year-over-year, mainly due to the reduced gold and silver head grades of the mine as operations moved out of the depleted high grade areas. The planned decrease in production in Q1 2012 compared with Q4 2011 was a result of slightly lower mill throughput. However, all performance metrics remain strong and Russia is expected to be within both regional production and cost guidance.
  • West Africa: Lower-than-expected production at Tasiast during the first quarter of the year was somewhat offset by strong results at Chirano, resulting in lower year-over-year regional production. The decrease at Tasiast was mainly due to a high proportion of near-surface fine material and felsite (a clay-like material) being placed on the dump leach, which affected the leaching metallurgy. The issue is being resolved and Tasiast production is expected to improve primarily in the second half. Regional production costs were higher than in Q4 2011, mainly due to the leach issues experienced at Tasiast in the first quarter. Full-year production and cost guidance for the region remain unchanged.
  • South America: First quarter results were lower year-over-year mainly due to lower grades, and a less favourable gold equivalent ratio for silver production at La Coipa. Production at Paracatu increased marginally year-over-year, because of higher mill throughput, but the mine experienced lower grades and recoveries resulting in higher unit costs. Production at Paracatu is expected to increase in the second half of the year as the mine sequence enters higher grade areas and the fourth ball mill is brought on line. La Coipa production is also expected to improve in the second half of the year, as the operation shifts from processing mostly stockpile material to processing ore from the Can Can and Ladera Farellon pits. Maricunga's production increased year-over-year, primarily as a result of improved metallurgical release from the heap leach. Regional production costs were higher compared with the same period last year, mainly as a result of declining grades, as well as less favourable currency hedges in Brazil. Full-year production and cost guidance for the region remain unchanged.

Project update and new developments

The forward-looking information contained in this section of the release is subject to the risks and assumptions contained in the Cautionary Statement on Forward-Looking Information on page seven of this news release.

The Company continues to advance work on its major growth projects within the framework of the capital and project optimization process described in the Q4 2011 news release.

Tasiast

The mine fleet at Tasiast has expanded to 41 haul trucks, and mining activity has accelerated. Mine production is forecast to increase to approximately 90 million tonnes in 2012, compared with 50 million tonnes in 2011. Stripping of the West Branch ore body is proceeding as planned in preparation for the next phase of the expansion project.

Work continues on building basic infrastructure for the next expansion phase. Expansion of the existing camp (3,000 beds) is now complete. Phase 1 of the permanent camp (702 beds) is nearing completion, and Phase 2 (2,800 beds) is underway. Construction of the new airstrip and upgrade to the main access road is proceeding on schedule, as is engineering work on the warehouse, truck shop, clinic and training facilities. Construction of the interim water pipeline is forecast for completion by mid-2012. Work also continues on the new tailings starter cell and West Branch dump leach pads. Discussions continue with the government and other industrial power users regarding the possible development of a natural gas power plant with the potential to provide power support to an expanded operation.

The Company continues to explore processing options for an expanded operation, and remains on schedule to make a preliminary selection of an optimum processing approach to be disclosed in August with the second quarter results.

The Phase 2 project EIA was submitted in early April. The Phase 2 EIA includes all proposed mining and processing activities that will occur within the mine site boundary. The EIA covers a range of potential project components and processing options that are being considered in the optimization process. The Company expects approval of the Phase 2 EIA in the second half of 2012, supporting the project development timeline. Phase 3 permitting for the project includes a sea water supply system. Development of the Phase 3 EIA is progressing and is expected to support the development timeline.

Exploration drilling transitioned fully to step-out and district drilling in the first quarter. Eight core and nine reverse circulation (RC) rigs were in operation throughout the quarter, drilling a total of 777 holes for 93,105 metres. Near the mine, approximately 30,000 metres were drilled, focusing on targets south of West Branch in the footwall of the Piment lodes, and testing for extensions of ore shoots below the Prolongation pit. Outside of the eight- kilometre mine corridor, 40 core holes and 645 reverse circulation holes were completed at various district targets for a total of approximately 60,000 metres. The majority of this work was directed at the C67 and C69 targets. Assay sample processing continues to be a bottleneck due to the rate of drilling and has resulted in a sample backlog, which is being dealt with on a priority basis.

Dvoinoye

The Dvoinoye feasibility study was completed during the first quarter as planned, and the Board has approved full construction funding. The study confirms the financial viability of the mine, which is expected to produce at a targeted rate of approximately 1,000 tonnes of ore per day. The ore will be shipped by truck to the Kupol mill facility, which will be upgraded to process approximately 4,500 tonnes per day, or 500 tonnes per day more than previously envisaged in the scoping study. Total life of mine gold production is expected to be approximately 1.1 million ounces, and total life of mine silver production is expected to be approximately 1.14 million ounces. The Dvoinoye reserve will be mined entirely using underground mechanised mining equipment, similar to that in operation at Kupol, with approximately 2.1 million tonnes of ore expected to be mined over the mine life.

Annual gold equivalent production from Dvoinoye ore is expected to average 215,000-250,000 ounces for the first three full years of production, during which time total annual production from the Kupol mine is expected to average 435,000-470,000 gold equivalent ounces, providing the region with average aggregate expected production of approximately 650,000-700,000 gold equivalent ounces per year from 2014 to 2016. The average Dvoinoye gold grade is expected to be approximately 17 g/t and the silver grade is expected to be approximately 21 g/t, with average gold and silver recoveries of 94% and 80%, respectively, over the life of mine. The project is expected to have a mine life of seven years, and remains on schedule to deliver first ore to the upgraded Kupol mill in the second half of 2013.

Capital expenditures for the project are estimated to be approximately $370 million, including approximately $175 million for infrastructure construction and upgrades to the Kupol mill. Capital expenditures and commitments as of the end of the first quarter are $206 million, or 56% of total forecast expenditures.

The Dvoinoye feasibility study envisions mining costs of approximately $80 per tonne, processing costs of approximately $50 per tonne, and trucking costs of approximately $35 per tonne. Total life of mine production cost of sales per gold equivalent ounce is expected to be approximately $575-$600, based on an oil price of $90 per barrel, gold royalties of 6%, silver royalties of 6.5%, and a corporate income tax rate of 20%. Going forward, Dvoinoye and Kupol results will be reported as a combined operation.

As of the end of the first quarter, surface infrastructure construction was approximately 16% complete, and underground development was approximately 23% complete. Underground development was ahead of plan in the quarter, with approximately 1,000 metres completed. Total underground development is now approximately 2,730 metres since development began in 2011. Surface construction activities have commenced as the winter season comes to an end and will peak this summer season. The permanent camp, key equipment and supplies for the 2012 construction program have all been delivered to site. Earthworks and roads for site facilities, including the permanent camp, are largely complete. Expansion of the temporary camp is near completion and will satisfy accommodation requirements during the construction period. Construction of the all-season road between Dvoinoye and Kupol has progressed well, with 32 kilometres of the total 84 kilometres now completed. All necessary permits for the current scope of underground development and construction activities are in place.

Fruta del Norte

Negotiations with the Ecuadorean government on an enhanced economic package at FDN are continuing, with the objective of reaching balanced agreements on exploitation and investment protection for the project.

Lobo-Marte

Drilling commenced at Lobo-Marte in January with four holes for 1,780 metres completed by quarter-end. Drilling was focused primarily on the Valy prospect, following up on positive drill results returned from Q2 2011 drill programs.

Other projects

Construction of the Paracatu fourth ball mill continues to advance on schedule and the project remains on target to be operational in the third quarter of 2012.

Pre-commissioning of the Maricunga SART (Sulphidization, Acidification, Recycling and Thickening) plant has commenced, and the project remains on target for completion in the first half of 2012.

The Company continues to review opportunities to optimize its assets in the Maricunga district, including potential development of the Pompeya gold and silver discovery at La Coipa. At Pompeya, 51 holes were drilled during the first quarter for a total of 18,500 metres. All work was completed on the Compañia Minera La Coipa Joint Venture property (75% Kinross-owned), where drilling continued to delineate the zone of oxide mineralization at Pompeya.

Outlook

The forward-looking information contained in this section is subject to the risk factors and assumptions contained in the Cautionary Statement on Forward-Looking Information located on page seven of this news release.

As previously announced on January 16, 2012, Kinross expects to produce approximately 2.6-2.8 million gold equivalent ounces in 2012. Production cost of sales per gold equivalent ounce is expected to be in the range of $670-715 for 2012.

Conference call details

In connection with the release, Kinross will hold a conference call and audio webcast on Wednesday, May 9, 2012 at 8 a.m. EDT to discuss the results, followed by a question-and-answer session. To access the call, please dial:

Canada & US toll-free - 1-800-319-4610

Outside of Canada & US - 1-604-638-5340

Replay (available up to 14 days after the call):

Canada & US toll-free - 1-800-319-6413; Passcode - 3310 followed by #.

Outside of Canada & US - 1-604-638-9010; Passcode - 3310 followed by #.

You may also access the conference call on a listen-only basis via webcast at our website www.kinross.com. The audio webcast will be archived on our website at www.kinross.com.

Kinross will hold its Annual Meeting of Shareholders on Wednesday, May 9, 2012, at 10 a.m. EDT at the Design Exchange, 234 Bay Street, Toronto, Ontario, Canada. A live audio webcast (listen-only mode) of the Annual Meeting of Shareholders will be available at www.kinross.com.

This release should be read in conjunction with Kinross' first quarter 2012 Financial Statements and Management's Discussion and Analysis report at www.kinross.com.

Kinross' unaudited first quarter 2012 financial statements have been filed with Canadian securities regulators (available at www.sedar.com) and furnished with the U.S. Securities and Exchange Commission (available at www.sec.gov). Kinross shareholders may obtain a copy of the financial statements free of charge upon request to the Company.

About Kinross Gold Corporation

Kinross is a Canadian-based gold mining company with mines and projects in Brazil, Canada, Chile, Ecuador, Ghana, Mauritania, Russia and the United States, employing approximately 8,000 people worldwide. Kinross maintains listings on the Toronto Stock Exchange (symbol:K) and the New York Stock Exchange (symbol:KGC).

Cautionary statement on forward-looking information

All statements, other than statements of historical fact, contained or incorporated by reference in this news release, but not limited to, any information as to the future financial or operating performance of Kinross, constitute "forward-looking information" or "forward-looking statements" within the meaning of certain securities laws, including the provisions of the Securities Act (Ontario) and the provisions for "safe harbour" under the United States Private Securities Litigation Reform Act of 1995 and are based on expectations, estimates and projections as of the date of this news release. Forward-looking statements include, without limitation, statements with respect to: possible events, the future price of gold and silver, the estimation of mineral reserves and mineral resources, the realization of mineral reserve and mineral resource estimates, the timing and amount of estimated future production, costs of production, capital expenditures, costs and timing of the development of projects and new deposits, success of exploration, development and mining activities, permitting timelines, currency fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage.
The words "aim", "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "timeline", "envision", "estimates", "forecasts", "goal", "guidance", "objective", "potential", "prospects", "seek", "strategy", "targets", "models", "intends' ', "anticipates", or "does not anticipate", or "believes", or variations of or similar such words and phrases or statements that certain actions, events or results "may", "could", "would", "should", "might", or "will be taken", "occur" or "be achieved" and similar expressions identify forward-looking statements. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by Kinross as of the date of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The estimates, models and assumptions of Kinross referenced, contained or incorporated by reference in this news release, which may prove to be incorrect, include, but are not limited to, the various assumptions set forth herein and in our most recently filed Annual Information Form and our most recently filed Management's Discussion and Analysis as well as: (1) there being no significant disruptions affecting the operations of the Company or any entity in which it now or hereafter directly or indirectly holds an investment, whether due to labour disruptions, supply disruptions, power disruptions, damage to equipment or otherwise; (2) permitting, development, operations, expansion and acquisitions at Paracatu (including, without limitation, land acquisitions and permitting for the construction and operation of the new tailings facility) being consistent with our current expectations;
(3) development of and production from the Phase 7 pit expansion and heap leach project at Fort Knox continuing on a basis consistent with Kinross' current expectations; (4) the viability, permitting and development of the Fruta del Norte deposit, and its continuing ownership by the Company, being consistent with Kinross' current expectations; (5) political and legal developments in any jurisdiction in which the Company, or any entity in which it now or hereafter directly or indirectly holds an investment, operates being consistent with its current expectations including, without limitation, the implementation of Ecuador's new mining and investment laws and related regulations and policies, and negotiation of an exploitation contract and an investment protection contract with the government, being consistent with Kinross' current expectations; (6) permitting, construction, development and production at Cerro Casale being consistent with the Company's current expectations; (7) the viability, permitting and development of the Lobo-Marte project, including, without limitation, the metallurgy and processing of its ore, being consistent with our current expectations; (8) the exchange rate between the Canadian dollar, Brazilian real, Chilean peso, Russian rouble, Mauritanian ouguiya, Ghanaian cedi and the U.S. dollar being approximately consistent with current levels; (9) certain price assumptions for gold and silver; (10) prices for natural gas, fuel oil, electricity and other key supplies being approximately consistent with current levels; (11) production and cost of sales forecasts for the Company, and entities in which it now or hereafter directly or indirectly holds an investment, meeting expectations; (12) the accuracy of the current mineral reserve and mineral resource estimates of the Company and any entity in which it now or hereafter directly or indirectly holds an investment; (13) labour and materials costs increasing on a basis consistent with Kinross' current expectations; (14) the development of the Dvoinoye and Vodorazdelnaya deposits being consistent with Kinross' expectations; (15) the viability of the Tasiast and Chirano mines, and the permitting, development and expansion (including, but not limited to, optimization initiatives leading to changes in processing approach) of the Tasiast and Chirano mines on a basis consistent with Kinross' current expectation, including but not limited to the terms and conditions of the legal and fiscal stability agreements for these operations being interpreted and applied in a manner consistent with their intent and Kinross' expectations; (16) impairment potential and (17) access to capital markets, including but not limited to securing partial project financing for the Dvoinoye, Fruta del Norte and the Tasiast expansion projects, being consistent with the Company's current expectations.
Known and unknown factors could cause actual results to differ materially from those projected in the forward- looking statements. Such factors include, but are not limited to: fluctuations in the currency markets; fluctuations in the spot and forward price of gold or certain other commodities (such as diesel fuel and electricity); increases in the discount rates applied to present value net future cash flows based on country-specific real weighted average cost of capital; declines in the market valuations of peer group gold producers and the Company, and the resulting impact on market price to net asset value multiples; changes in interest rates or gold or silver lease rates that could impact the mark-to-market value of outstanding derivative instruments and ongoing payments/receipts under any interest rate swaps and variable rate debt obligations; risks arising from holding derivative instruments (such as credit risk, market liquidity risk and mark-to-market risk); changes in national and local government legislation, taxation (including but not limited to income tax, advance income tax, stamp tax, withholding tax, capital tax, tariffs, value-added or sales tax, capital outflow tax, capital gains tax, windfall or windfall profits tax, royalty, excise tax, customs/import or export taxes/duties, asset taxes, asset transfer tax, property use or other real estate tax, together with any related fine, penalty, surcharge, or interest imposed in connection with such taxes), controls, policies and regulations; the security of personnel and assets; political or economic developments in Canada, the United States, Chile, Brazil, Russia, Ecuador, Mauritania, Ghana, or other countries in which Kinross, or entities in which it now or hereafter directly or indirectly holds an interest, do business or may carry on business; business opportunities that may be presented to, or pursued by, us; our ability to successfully integrate acquisitions and complete divestitures; operating or technical difficulties in connection with mining or development activities; employee relations; commencement of litigation against the Company including, but not limited to, securities class action in Canada and/or the U.S.; the speculative nature of gold exploration and development including, but not limited to, the risks of obtaining necessary licenses and permits; diminishing quantities or grades of reserves; adverse changes in our credit rating; and contests over title to properties, particularly title to undeveloped properties.
In addition, there are risks and hazards associated with the business of gold exploration, development and mining, including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion losses (and the risk of inadequate insurance, or the inability to obtain insurance, to cover these risks). Many of these uncertainties and contingencies can directly or indirectly affect, and could cause, Kinross' actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, Kinross, including but not limited to resulting in an impairment charge on goodwill and/or assets. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements are provided for the purpose of providing information about management's expectations and plans relating to the future. All of the forward-looking statements made in this news release are qualified by these cautionary statements and those made in our other filings with the securities regulators of Canada and the United States including, but not limited to, the cautionary statements made in the "Risk Factors" section of our most recently filed Annual Information Form and
Management Discussion and Analysis. These factors are not intended to represent a complete list of the factors that could affect Kinross. Kinross disclaims any intention or obligation to update or revise any forward-looking statements or to explain any material difference between subsequent actual events and such forward-looking statements, except to the extent required by applicable law.

Key Sensitivities

Approximately 60%-70% of the Company's costs are denominated in US dollars.

A 10% change in foreign exchange could result in an approximate $5 impact in production cost of sales per ounce.(6)

A $10 per barrel change in the price of oil could result in an approximate $2 impact on production cost of sales per ounce.

The impact on royalties of a $100 change in the gold price could result in an approximate $4 impact on cost of sales per ounce.

Other information

Where we say "we", "us", "our", the "Company", or "Kinross" in this news release, we mean Kinross Gold Corporation and/or one or more or all of its subsidiaries, as may be applicable.

The technical information about the Company's material mineral properties (other than exploration activities) contained in this news release has been prepared under the supervision of Mr. Mark Sedore, an officer of the Company who is a "qualified person" within the meaning of National Instrument 43- 101.The technical information about the Company's drilling and exploration activities contained in this news release has been prepared under the supervision of Dr. Glen Masterman, an officer with the Company who is a "qualified person" within the meaning of National Instrument 43-101.

(1) Unless otherwise stated, production figures in this news release are based on Kinross' 90% share of Chirano production.

(2) "Production cost of sales per gold equivalent ounce" is a non-GAAP measure defined as production cost of sales per the financial statements divided by the attributable number of gold equivalent ounces sold, both reduced to reflect a 90% ownership interest in Chirano sales. Production cost of sales is equivalent to total cost of sales (per the financial statements), less depreciation, depletion, amortization, and impairment charges.

(3) "Attributable margin per ounce sold" is a non-GAAP measure and defined as "average realized gold price per ounce" less "attributable production cost of sales per gold equivalent ounce sold".

(4) Reconciliation of non-GAAP measures is located on page nine of this news release.

(5) "Net earnings" figures in this release represent " net earnings attributed to common shareholders."

(6) Refers to all of the currencies in the countries where the Company has mining operations, fluctuating simultaneously by 10% in the same direction, either appreciating or depreciating, taking into consideration the impact of hedging and the weighting of each currency within our consolidated cost structure.

Reconciliation of non-GAAP financial measures

The Company has included certain non-GAAP financial measures in this document. These measures are not defined under IFRS and should not be considered in isolation. The Company believes that these measures, together with measures determined in accordance with IFRS, provide investors with an improved ability to evaluate the underlying performance of the Company. The inclusion of these measures is meant to provide additional information and should not be used as a substitute for performance measures prepared in accordance with IFRS. These measures are not necessarily standard and therefore may not be comparable to other issuers.

Adjusted net earnings attributed to common shareholders and adjusted net earnings per share are non-GAAP measures which determine the performance of the Company, excluding certain impacts which the Company believes are not reflective of the Company's underlying performance for the reporting period, such as the impact of foreign exchange gains and losses, reassessment of prior year taxes and/or taxes otherwise not related to the current period, impairment charges, gains and losses and other one-time costs related to acquisitions, dispositions and other transactions, and non-hedge derivative gains and losses. Although some of the items are recurring, the Company believes that they are not reflective of the underlying operating performance of its current business and are not necessarily indicative of future operating results. Management believes that these measures, which are used internally to assess performance and in planning and forecasting future operating results, provide investors with the ability to better evaluate underlying performance, particularly since the excluded items are typically not included in public guidance. However, adjusted net earnings and adjusted net earnings per share measures are not necessarily indicative of net earnings and earnings per share measures as determined under IFRS.

The following table provides a reconciliation of consolidated net earnings to adjusted net earnings for the periods presented:

   GAAP to Adjusted Earnings  
   Reconciliation  
(in US$ millions)  Three Months Ended  
   March 31  
    2012     2011(1)  
   
Net earnings attributed to common shareholders - as reported $ 105.7   $ 250.1  
   
Adjusting items:            
  Foreign exchange gains   (7.0 )   (14.8 )
  Non-hedge derivatives gains - net of tax   (10.1 )   (41.0 )
  Gains on acquisition/disposition of assets and investments - net of tax   -     (30.8 )
  FX loss on translation of tax basis and FX on deferred income taxes within income tax expense   2.9     9.2  
  Change in deferred tax due to a change in Ghanaian corporate income tax rate   110.3     -  
  Taxes in respect of prior years   1.3     -  
  Inventory fair value adjustment - net of tax   -     2.6  
    97.4     (74.8 )
Net earnings attributed to common shareholders - Adjusted $ 203.1   $ 175.3  
Weighted average number of common shares outstanding - Basic   1,138.1     1,134.0  
Net earnings per share - Adjusted $ 0.18   $ 0.15  
             
(1) Certain prior period figures have been recast as a result of finalizing the Red Back purchase price allocation in the second quarter of 2011.

The Company makes reference to a non-GAAP measure for adjusted operating cash flow and adjusted operating cash flow per share. Adjusted operating cash flow is defined as cash flow from operations excluding certain impacts which the Company believes are not reflective of the Company's regular operating cash flow, and excluding changes in working capital. Working capital can be volatile due to numerous factors, including the timing of tax payments, and in the case of Kupol, a build-up of inventory due to transportation logistics. The Company uses adjusted operating cash flow internally as a measure of the underlying operating cash flow performance and future operating cash flow-generating capability of the Company. However, adjusted operating cash flow and adjusted operating cash flow per share measures are not necessarily indicative of net cash flow from operations as determined under IFRS.

The following table provides a reconciliation of adjusted cash flow from operations for the periods presented:

  GAAP to Adjusted Operating Cash Flow
(in US$ millions) Three Months Ended
  March 31
    2012     2011(1)
 
Net cash flow provided from operating activities - as reported $ 381.7   $ 335.1
 
Adjusting items:          
  Close out and early settlement of derivative instruments   (28.4 )   -
  Working capital changes:          
    Accounts receivable and other assets   33.2     39.9
    Inventories   (1.7 )   15.1
    Accounts payable and other liabilities, including taxes   (45.1 )   6.6
    (42.0 )   61.6
Adjusted operating cash flow $ 339.7   $ 396.7
Weighted average number of common shares outstanding - Basic   1,138.1     1,134.0
Adjusted operating cash flow per share $ 0.30   $ 0.35
           
(1) Certain prior period figures have been recast as a result of finalizing the Red Back purchase price allocation in the second quarter of 2011.

Consolidated production cost of sales per gold equivalent ounce sold is a non-GAAP measure and is defined as production cost of sales as per the consolidated financial statements divided by the total number of gold equivalent ounces sold. This measure converts the Company's non-gold production into gold equivalent ounces and credits it to total production.

Attributable production cost of sales per gold equivalent ounce sold is a non-GAAP measure and is defined as attributable production cost of sales divided by the attributable number of gold equivalent ounces sold. This measure converts the Company's non-gold production into gold equivalent ounces and credits it to total production.

Management uses these measures to monitor and evaluate the performance of its operating properties.

  Consolidated and Attributable Cost of  
  Sales Per Equivalent Ounce Sold  
   
(in US$ millions) Three Months Ended  
  March 31  
    2012     2011(2)  
   
Production cost of sales $ 466.4   $ 381.6  
Less: portion attributable to Kupol non-controlling interest(1)   -     (16.9 )
Less: portion attributable to Chirano non-controlling interest   (5.4 )   (4.9 )
Attributable production cost of sales $ 461.0   $ 359.8  
   
Gold equivalent ounces sold   629,505     718,577  
Less: portion attributable to Kupol non-controlling interest(1)   -     (50,834 )
Less: portion attributable to Chirano non-controlling interest   (7,825 )   (6,955 )
Attributable gold equivalent ounces sold   621,680     660,788  
Production cost of sales per gold equivalent ounce sold $ 741   $ 531  
Attributable production cost of sales per gold equivalent ounce sold $ 742   $ 545  
             
(1) On April 27, 2011, Kinross acquired the remaining 25% of CMGC, and thereby obtained 100% ownership of Kupol. As such, the results up to April 27, 2011 reflect 75% and results thereafter reflect 100%.
 
(2) Certain prior period figures have been recast as a result of finalizing the Red Back purchase price allocation in the second quarter of 2011.

Attributable production cost of sales per ounce sold on a by-product basis is a non-GAAP measure which calculates the Company's non-gold production as a credit against its per ounce production costs, rather than converting its non-gold production into gold equivalent ounces and crediting it to total production, as is the case in co-product accounting. Management believes that this measure provides investors with the ability to better evaluate Kinross' production cost of sales per ounce on a comparable basis with other major gold producers who routinely calculate their cost of sales per ounce using by-product accounting rather than co-product accounting.

The following table provides a reconciliation of attributable production cost of sales per ounce sold on a by-product basis for the periods presented:

    Attributable Cost of Sales Per Ounce  
    Sold on a By-Product Basis  
(in US$ millions)   Three Months Ended  
    March 31  
    2012     2011 (3)  
Production cost of sales(1) $ 466.4   $ 381.6  
Less: portion attributable to Kupol non-controlling interest(2)   -     (16.9 )
Less: portion attributable to Chirano non-controlling interest   (5.4 )   (4.9 )
Less: attributable silver sales   (86.2 )   (82.2 )
Attributable production cost of sales net of silver by-product revenue $ 374.8   $ 277.6  
   
Gold ounces sold   578,286     634,791  
Less: portion attributable to Kupol non-controlling interest(2)   -     (39,950 )
Less: portion attributable to Chirano non-controlling interest   (7,800 )   (6,927 )
Attributable gold ounces sold   570,486     587,914  
Attributable production cost of sales per ounce sold on a by-product            
basis $ 657   $ 472  
             
(1) "Production cost of sales" is equivalent to "Total cost of sales" per the consolidated financial statements less depreciation, depletion and amortization and impairment charges.
 
(2) On April 27, 2011, Kinross acquired the remaining 25% of CMGC, and thereby obtained 100% ownership of Kupol. As such, the results up to April 27, 2011 reflect 75% and results thereafter reflect 100%.
 
(3) Certain prior period figures have been recast as a result of finalizing the Red Back purchase price allocation in the second quarter of 2011.
 
 
Review of Operations
                                         
 
Three months ended March 31, Gold equivalent ounces                          
                               
  Produced     Sold     Production cost of     Production cost of
                    sales(1)($millions)     sales(1)/oz
  2012   2011     2012 2011       2012     2011       2012   2011
 
 
Fort Knox 61,716   65,047   60,365 64,666     $ 52.0   $ 40.6   $ 861 $ 628
Round Mountain 44,758   42,121   43,551 41,555       37.3     32.9       856   792
Kettle River - Buckhorn 42,618   45,852     39,321 47,629       18.9     17.9       481   375
North America Total 149,092   153,020   143,237 153,850       108.2     91.4       755   594
 
Kupol (100%) 126,970   205,675     126,735 203,338       61.2     65.5       483   322
Russia Total 126,970   205,675   126,735 203,338       61.2     65.5       483   322
 
Paracatu 104,618   100,427   110,527 107,957       105.4     74.5       954   690
Crixás 15,889   14,813   17,153 13,619       13.8     10.1       805   741
La Coipa 37,740   54,446   43,712 62,931       44.5     37.5       1,018   596
Maricunga 63,989   58,740     69,063 55,843       43.7     26.9       633   482
South America Total 222,236   228,426   240,455 240,350       207.4     149.0       863   620
 
Tasiast(3) 37,634   51,321   40,827 51,493       35.9     26.6       879   517
Chirano (100%) 75,906   62,037     78,251 69,546       53.7     49.1       686   706
West Africa Total 113,540   113,358     119,078 121,039       89.6     75.7       752   625
 
Operations Total 611,838   700,479   629,505 718,577     $ 466.4     381.6   $ 741   531
                                         
Less Kupol non-controlling interest (25%)(2) -   (51,418 ) - (50,834 )     -     (16.9 )          
                                         
Less Chirano non-controlling interest (10%)  (7,591 ) (6,204 ) (7,825) (6,955 )     (5.4 )   (4.9 )          
                                         
Attributable 604,247   642,857   621,680 660,788   $ 461.0   $ 359.8   $ 742 $ 545
                                   
(1) "Production cost of sales" is equivalent to "Total cost of sales" per the consolidated financial statements less depreciation, depletion and amortization and impairment charges.
 
(2) On April 27, 2011, Kinross acquired the remaining 25% of CMGC, and thereby obtained 100% ownership of Kupol. As such, the results up to April 27, 2011 reflect 75% and results thereafter reflect 100%.
 
(3) Certain prior period figures have been recast as a result of finalizing the Red Back purchase price allocation in the second quarter of 2011.
 
 
 
Consolidated balance sheets
 
(Unaudited expressed in millions of United States dollars, except share amounts)
 
    As at    
    March 31,     December 31,  
    2012       2011  
   
Assets              
  Current assets              
    Cash and cash equivalents $ 1,486.9   $ 1,766.0  
    Restricted cash   63.0       62.1  
    Short-term investments   0.1       1.3  
    Accounts receivable and other assets   342.7       309.4  
    Inventories   968.4       976.2  
    Unrealized fair value of derivative assets   21.8       2.8  
    2,882.9       3,117.8  
  Non-current assets              
    Property, plant and equipment   9,343.1       8,959.4  
    Goodwill   3,420.3       3,420.3  
    Long-term investments   76.4       79.4  
    Investments in associates   506.8       502.5  
    Unrealized fair value of derivative assets   10.1       1.1  
    Deferred charges and other long-term assets   445.6       406.4  
    Deferred tax assets   20.0       21.9  
  $ 16,705.2     $ 16,508.8  
Liabilities              
  Current liabilities              
    Accounts payable and accrued liabilities $ 590.6   $ 575.3  
    Current tax payable   108.4       82.9  
    Current portion of long-term debt   469.4       32.7  
    Current portion of provisions   37.3       38.1  
    Current portion of unrealized fair value of derivative liabilities   27.1       66.7  
    1,232.8       795.7  
  Non-current liabilities              
    Long-term debt   1,148.4       1,600.4  
    Provisions   602.2       597.1  
    Unrealized fair value of derivative liabilities   7.1       32.7  
    Other long-term liabilities   141.1       133.1  
    Deferred tax liabilities   994.2       879.1  
    4,125.8       4,038.1  
Equity              
  Common shareholders' equity              
    Common share capital and common share purchase warrants $ 14,676.1   $ 14,656.6  
    Contributed surplus   73.3       81.4  
    Accumulated deficit   (2,235.3 )     (2,249.9 )
    Accumulated other comprehensive loss   (6.2 )     (97.7 )
    12,507.9       12,390.4  
  Non-controlling interest   71.5       80.3  
    12,579.4       12,470.7  
Commitments and contingencies              
  $ 16,705.2     $ 16,508.8  
Common shares              
  Authorized   Unlimited       Unlimited  
  Issued and outstanding   1,138,913,714       1,137,732,344  
                 
                 
                 
Consolidated statements of operations
 
(Unaudited expressed in millions of United States dollars, except per share and share amounts)
       
    Three months ended  
    March 31,  
    2012       2011(a)  
   
Revenue              
  Metal sales $ 1,036.6   $ 937.0  
   
Cost of sales              
  Production cost of sales   466.4       381.6  
  Depreciation, depletion and amortization   146.7       153.1  
Total cost of sales   613.1       534.7  
Gross profit   423.5       402.3  
  Other operating costs   11.5       4.2  
  Exploration and business development   59.1       23.9  
  General and administrative   39.7       43.3  
Operating earnings   313.2       330.9  
  Other income - net   12.0       88.4  
  Equity in losses of associates   (1.2 )     (0.2 )
  Finance income   1.1       2.3  
  Finance expense   (9.9 )     (16.4 )
Earnings before taxes   315.2       405.0  
  Income tax expense - net   (218.3 )     (113.9 )
Net earnings $ 96.9     $ 291.1  
Attributed to non-controlling interest $ (8.8 )   $ 41.0  
Attributed to common shareholders $ 105.7     $ 250.1  
   
Earnings per share attributable to common shareholders              
  Basic $ 0.09   $ 0.22  
  Diluted $ 0.09   $ 0.22  
   
Weighted average number of common shares outstanding (millions)              
  Basic   1,138.1       1,134.0  
  Diluted   1,143.6       1,139.4  
                 
(a) Certain prior period figures have been recast as a result of finalizing the Red Back purchase price allocation in the second quarter of 2011.
 
 
 
Consolidated statements of cash flows  
   
(Unaudited expressed in millions of United States dollars)  
   
  Three months ended  
    March 31,  
    2012     2011(a)  
Net inflow (outflow) of cash related to the following activities:            
Operating:            
Net earnings $ 96.9   $ 291.1  
Adjustments to reconcile net earnings to net cash provided from (used in) operating activities:            
  Depreciation, depletion and amortization   146.7     153.1  
  Gains on acquisition/disposition of assets and investments - net   -     (30.8 )
  Equity in losses of associates   1.2     0.2  
  Non-hedge derivative gains - net   (10.1 )   (41.0 )
  Settlement of derivative instruments   28.4     -  
  Share-based compensation expense   9.5     8.2  
  Accretion expense   13.8     12.8  
  Deferred tax expense   97.4     6.0  
  Foreign exchange gains and other   (15.7 )   (2.9 )
  Changes in operating assets and liabilities:            
    Accounts receivable and other assets   (33.2 )   (39.9 )
    Inventories   1.7     (15.1 )
    Accounts payable and accrued liabilities, excluding interest and taxes   110.2     64.0  
Cash flow provided from operating activities   446.8     405.7  
  Income taxes paid   (65.1 )   (70.6 )
Net cash flow provided from operating activities   381.7     335.1  
   
Investing:            
  Additions to property, plant and equipment   (534.0 )   (255.9 )
  Net proceeds from the sale of long-term investments and other assets   0.2     101.1  
  Additions to long-term investments and other assets   (12.7 )   (11.7 )
  Net proceeds from the sale of property, plant and equipment   -     0.2  
  Disposal of short-term investments   1.1     -  
  Increase in restricted cash   (0.9 )   -  
  Interest received   1.0     1.4  
  Other   (0.3 )   (0.3 )
Cash flow used in investing activities   (545.6 )   (165.2 )
Financing:            
  Issuance of common shares on exercise of options and warrants   1.9     8.9  
  Proceeds from issuance of debt   127.4     93.0  
  Repayment of debt   (152.1 )   (105.2 )
  Interest paid   (3.2 )   (4.6 )
  Dividends paid to common shareholders   (91.1 )   (56.8 )
  Settlement of derivative instruments   -     (10.3 )
  Other   (0.7 )   (5.7 )
Cash flow used in financing activities   (117.8 )   (80.7 )
Effect of exchange rate changes on cash and cash equivalents   2.6     5.0  
Increase (decrease) in cash and cash equivalents   (279.1 )   94.2  
Cash and cash equivalents, beginning of period   1,766.0     1,466.6  
Cash and cash equivalents, end of period   1,486.9     1,560.8  
             
(a) Certain prior period figures have been recast as a result of finalizing the Red Back purchase price allocation in the second quarter of 2011.
 
 
   
Operating Summary
   
                         
  Mine Period Ownership Ore Processed(1) Grade Recovery(2) Gold Eq Production (12) Gold Eq Sales (12) Production costs of sales(13)  Production costs of sales (13) Cap Ex DD&A
      (%) ('000 tonnes) (g/t) (%) (ounces) (ounces) ($ millions)  ($/ounce) ($ millions) ($ millions)
North America   Q1 2012 100 4,156 0.46 84% 61,716 60,365 $ 52.0 $ 861 $ 24.8  $ 9.1
    Q4 2011 100 8,197 0.51 79% 70,759 69,973 52.3  747 28.4 10.0
  Fort Knox(3) Q3 2011 100 9,415 0.49 77% 76,261 75,611 53.8  712 26.8 15.4
    Q2 2011 100 10,000 0.59 79% 77,727 77,269 52.4  678 26.2 17.2
    Q1 2011 100 3,466 0.66 77% 65,047 64,666 40.6  628 22.1 15.0
    Q1 2012 50 6,314 0.91 78% 44,758 43,551 37.3  856 13.6 7.8
    Q4 2011 50 7,376 0.96 83% 43,584 44,231 26.4  597 22.2 6.1
                         
  Round Mountain (4) Q3 2011 50 8,186 0.95 88% 54,588 52,658 35.2  668 9.6 8.8
    Q2 2011 50 8,338 0.99 80% 47,151 46,941 34.7  739 7.9 7.2
   
    Q1 2011 50 7,130 0.91 71% 42,121 41,555 32.9  792 8.5 6.6
    Q1 2012 100 112 12.81 90% 42,618 39,321 18.9  481 0.5 18.9
    Q4 2011 100 123 12.24 89% 42,003 43,089 19.2  446 3.0 21.6
    Q3 2011 100 110 13.06 91% 41,200 42,109 19.5  463 3.9 17.5
  Kettle River Q2 2011 100 104 14.77 89% 46,237 45,442 18.3  403 3.4 20.0
   
    Q1 2011 100 106 15.29 88% 45,852 47,629 17.9  375 3.1 21.8
Russia   Q1 2012 100 309 11.76 93% 126,970 126,735 61.2  483 10.4 23.6
    Q4 2011 100 325 10.81 93% 138,410 113,936 54.8  481 18.5 21.3
  Kupol - 100%(6) Q3 2011 100 303 10.39 93% 124,912 138,278 58.4  422 8.0 25.7
    Q2 2011 100 305 15.88 94% 184,066 199,773 69.1  346 16.1 37.0
    Q1 2011 75 305 16.56 95% 205,675 203,338 65.5  322 5.8 39.5
    Q1 2012 100 309 11.76 93% 126,970 126,735 61.2  483 10.4 23.6
  Kupol (6) (7)(8) Q4 2011 100 325 10.81 93% 138,410 113,936 54.8  481 18.5 21.3
    Q3 2011 100 303 10.39 93% 124,912 138,278 58.4  422 8.0 25.7
    Q2 2011 100 305 15.88 94% 169,470 186,805 65.0  348 15.2 35.4
    Q1 2011 75 305 16.56 95% 154,257 152,504 48.6  319 4.4 32.4
South America   Q1 2012 100 12,910 0.35 72% 104,618 110,527 105.4  954 74.6 14.6
    Q4 2011 100 11,578 0.42 74% 117,977 112,048 82.6  737 131.6 15.1
  Paracatu Q3 2011 100 13,202 0.43 74% 135,099 133,827 89.7  670 105.9 16.9
   
    Q2 2011 100 10,014 0.41 76% 99,893 95,773 77.1  805 65.2 14.3
   
    Q1 2011 100 9,738 0.41 78% 100,427 107,957 74.5  690 36.7 14.4
    Q1 2012 50 282 3.82 91% 15,889 17,153 13.8  805 3.8 4.0
    Q4 2011 50 302 4.58 93% 20,781 17,379 11.3  650 7.1 3.6
  Crixás Q3 2011 50 300 3.49 92% 15,551 16,594 15.3  922 5.4 3.7
   
    Q2 2011 50 312 3.35 93% 15,438 16,165 13.6  841 6.9 3.6
   
    Q1 2011 50 256 3.85 93% 14,813 13,619 10.1  741 2.9 2.4
    Q1 2012 100 1,467 0.56 78% 37,740 43,712 44.5  1,018 15.3 4.5
    Q4 2011 100 1,060 0.58 85% 34,435 35,629 35.4  994 23.2 3.3
  La Coipa(5) Q3 2011 100 1,011 0.70 76% 38,539 35,566 32.1  903 17.4 6.6
   
    Q2 2011 100 1,131 0.72 81% 50,867 56,906 40.5  712 15.3 8.1
   
    Q1 2011 100 1,076 0.83 75% 54,446 62,931 37.5  596 8.7 10.5
    Q1 2012 100 4,014 0.66 nm 63,989 69,063 43.7  633 35.6 6.3
    Q4 2011 100 3,960 0.76 nm 54,281 52,987 22.2  419 34.0 4.8
  Maricunga Q3 2011 100 3,284 0.80 nm 53,123 58,591 30.2  515 29.9 5.5
    Q2 2011 100 4,023 0.86 nm 70,105 63,407 26.2  413 44.3 7.1
    Q1 2011 100 3,991 0.85 nm 58,740 55,843 26.9  482 41.1 1.8
West Africa   Q1 2012 100 1,597 1.71 89% 37,634 40,827 35.9  879 260.0 13.8
  Tasiast (10) (11) Q4 2011 100 4,581 2.33 88% 54,874 50,800 37.2  732 204.6 14.8
    Q3 2011 100 2,679 2.05 87% 47,175 48,455 40.8  842 88.3 18.4
    Q2 2011 100 1,990 1.60 91% 47,249 46,213 33.6  727 92.1 14.5
    Q1 2011 100 2,204 2.10 88% 51,321 51,493 26.6  517 84.2 15.8
    Q1 2012 90 854 2.97 93% 75,906 78,251 53.7  686 22.5 41.8
    Q4 2011 90 917 2.70 93% 73,539 67,876 45.3  667 28.6 28.4
  Chirano - 100%(10) Q3 2011 90 949 2.45 91% 68,372 68,697 50.5  735 19.5 23.6
    Q2 2011 90 858 2.28 91% 57,898 56,558 37.1  656 29.0 19.3
    Q1 2011 90 848 2.42 91% 62,037 69,546 49.1  706 17.2 24.1
    Q1 2012 90 854 2.97 93% 68,315 70,426 48.3  686 20.3 37.6
    Q4 2011 90 917 2.70 93% 66,185 61,086 40.8  667 25.7 25.6
  Chirano (9)(10) Q3 2011 90 949 2.45 91% 61,535 61,828 45.5  735 17.6 21.2
    Q2 2011 90 858 2.28 91% 52,108 50,902 33.4  656 26.1 17.4
    Q1 2011 90 848 2.42 91% 55,833 62,591 44.2  706 15.5 21.7
                         

(1) Ore processed is to 100%, production and costs are to Kinross' account.

(2) Due to the nature of heap leach operations, recovery rates at Maricunga cannot be accurately measured on a quarterly basis. Recovery rates at Fort Knox, Round Mountain and Tasiast represent mill recovery only.

(3) Includes 915,000 tonnes placed on the heap leach pad during the first quarter of 2012. Grade and recovery represent mill processing only. Ore placed on the heap leach pad had an average grade of 0.36 grams per tonne for the first quarter of 2012.

(4) Includes 5,504,000 tonnes placed on the heap leach pad during the first quarter of 2012. Grade represent mill processing only. Ore placed on the heap leach pad had an average grade of 0.43 grams per tonne for the first quarter of 2012.

(5) La Coipa silver grade and recovery were as follows: Q1 (2012) 38.78 g/t, 51%; Q4 (2011) 56.82 g/t, 54%; Q3 (2011) 65.00 g/t, 43%; Q2 (2011) 58.85 g/t, 55%; Q1 (2011) 75.64 g/t, 53%

(6) The Kupol segment excludes Dvoinoye capital expenditures.

(7) Kupol silver grade and recovery were as follows: Q1 (2012) 171.8 g/t, 85 %; Q4 (2011) 170.52 g/t, 85%; Q3 (2011) 159.03 g/t, 82%; Q2 (2011) 215.21 g/t, 84%; Q1 (2011) 237.90 g/t, 84%

(8) On April 27, 2011, Kinross acquired the remaining 25% of CMGC, and thereby obtained 100% ownership of Kupol. As such, the results up to April 27, 2011 reflect 75% and results thereafter reflect 100%.

(9) Includes Kinross' share of Chirano at 90%.

(10) Certain Q1 2011 results have been recast as a result of finalizing the Red Back purchase price allocation.

(11) Includes 1,002,000 tonnes placed on the heap leach pad during the first quarter of 2012. Grade and recovery represent mill processing only. Ore placed on the heap leach pad had an average grade of 0.60 grams per tonne for the first quarter

(12) Gold equivalent ounces include silver ounces produced and sold converted to a gold equivalent based on the ratio of the average spot market prices for the commodities for each period. The ratios for the quarters presented are as follows: Q1 2012: 51.82:1, Q4 2011: 52.64:1, Q3 2011: 43.87:1, Q2 2011: 39.67:1, Q1 2011: 43.51:1.

(13) "Production cost of sales" is equivalent to "Total cost of sales" per the consolidated financial statements less depreciation, depletion and amortization and impairment charges.



Media Contact
Steve Mitchell
Vice-President, Corporate Communications
416-365-2726
steve.mitchell@kinross.com
or
Investor Relations Contact
Erwyn Naidoo
Vice-President, Investor Relations
416-365-2744
erwyn.naidoo@kinross.com
Data and Statistics for these countries : Brazil | Canada | Chile | Ecuador | Ghana | Mauritania | Russia | All
Gold and Silver Prices for these countries : Brazil | Canada | Chile | Ecuador | Ghana | Mauritania | Russia | All

Kinross Gold Corporation

PRODUCER
CODE : K.TO
ISIN : CA4969024047
CUSIP : 496902404
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Kinross Gold is a gold producing company based in Canada.

Kinross Gold produces gold, silver in Brazil, in Canada, in Chile, in Ghana, in Mauritania, in Russia and in USA, develops copper, gold and silver in Chile, and holds various exploration projects in Canada, in Chile and in Russia.

Its main assets in production are ROUND MOUNTAIN in USA, CRIXÁS, MORRO DO OURO and PARACATU in Brazil, REFUGIO MINE (VERDE AND PANCHO), FORT KNOX, MARICUNGA and LA COIPA in Chile, PORCUPINE and MUSSELWHITE in Canada, CHIRANO in Ghana, TASIAST in Mauritania and KUPOL in Russia, its main assets in development are KETTLE RIVER, GOLD HILL and CERRO CASALE in Chile and its main exploration properties are AHAFO NORTH, BIBIANI NORTH, BOLE, BOLE - BOLGATANGA, AKYEM, RUSSIAN MOUNTAIN, HORN MOUNTAIN, GIL, ENCHI and GOLDBANKS - KINROSS in Ghana, FRUTA DEL NORTE in Ecuador, HAMMOND REEF in Canada, KUBAKA MINE - BIRKACHAN in Russia and LOBO-MARTE in Chile.

Kinross Gold is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 11.5 billions as of today (US$ 8.4 billions, € 7.9 billions).

Its stock quote reached its lowest recent point on October 27, 2000 at CA$ 1.43, and its highest recent level on December 13, 2002 at CA$ 9.99.

Kinross Gold has 1 246 749 952 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Kinross Gold Corporation
4/17/2019Kinross Gold restructures leadership team
2/4/2009Kinross Gold Picks Riverside for Discovery Potential
Annual reports of Kinross Gold Corporation
2007 Annual Report
Financings of Kinross Gold Corporation
2/24/2016Announces US$250 Million Bought Deal Financing
8/26/2011Kinross warrants expiring September 7, 2011
8/22/2011Completes US$1 Billion Unsecured Debt Offering
8/16/2011Kinross announces US$1 million for Alaskan mining engineerin...
8/16/2011Kinross announces US$1 billion unsecured debt offering
8/16/2011Announces US$1 Billion Unsecured Debt Offering
4/1/2011Kinross doubles its revolving credit facility to US$1.2 bill...
Option Grants of Kinross Gold Corporation
8/8/2012Kinross declares dividend
2/17/2012Kinross increases dividend by 33%
2/16/2012Increases Dividend by 33%
8/10/2011Kinross declares dividend increase
8/10/2011Declares Dividend Increase
Nominations of Kinross Gold Corporation
2/10/2014Kinross President and Chief Operating Officer to retire Octo...
5/13/2013Kinross announces results of vote to elect Board of Director...
5/13/2013Announces Results of Vote to Elect Board of Directors
4/3/2013Kinross announces new appointments to Board of Directors
10/31/2012Kinross announces appointment of new Chief Financial Officer
10/10/2012Kinross announces departure of Chief Financial Officer
8/2/2012Kinross announces appointment of J. Paul Rollinson
8/1/2012Announces Appointment of J. Paul Rollinson as Chief Executiv...
7/14/2011Announces Board Member Departure
3/13/2011Kinross announces appointment of new Chief Financial Officer
Financials of Kinross Gold Corporation
7/5/2016to Announce Q2 Financial Results on July 27, 2016
5/10/2016Kinross Reports 2016 First Quarter Results
4/18/2016to Announce Q1 Financial Results on May 10, 2016
2/9/2016Fourth Quarter and Year-End 2015 Results Webcast
10/15/2015Kinross to announce Q3 financial results on November 10=2C 2...
6/24/2015=3A=C2=A0Kinross to announce Q2 financial results on July 29...
4/17/2015=3A=C2=A0Kinross to announce Q1 financial results on May 5=2...
10/3/2012Kinross to announce Q3 financial results on November 7, 2012
6/22/2012Kinross to announce Q2 financial results on August 8, 2012
5/8/2012Reports 2012 First Quarter Results
4/2/2012to announce Q1 financial results on May 8, 2012; Annual Meet...
3/29/2012to Announce Q1 Financial Results on May 8, 2012
2/17/2012Kinross reports 2011 fourth quarter and year-end results
5/4/2011Kinross reports 2011 first quarter results
8/1/2007 records strong second quarter results; production increases...
Project news of Kinross Gold Corporation
6/20/2016(Tasiast)Temporarily Suspends Mining and Processing Operations at the...
10/26/2015Kinross Gold bulls mine for gains
9/21/2015(Tasiast)Kinross Gold struggling to reverse losses at Mauritania’s Ta...
7/29/2015Kinross mulls more job cuts at Mauritania mine to reduce cos...
7/29/2015Gold miner Kinross slides to second-quarter net loss
4/12/2015AngloGold in talks to sell part, all of U.S. mine
4/1/2015Kinross Gold says Chile mine operations still down after flo...
3/29/2015India’s rising real interest rate is negative for gold
10/9/2013Kinross celebrates opening of Dvoinoye mine
8/19/2013(Tasiast)Kinross announces end of strike at Tasiast mine
8/8/2013(Tasiast)Unionized employees strike at Tasiast mine
7/11/2013Adamera Acquires and Advances Gold Projects near the Kinross...
4/5/2013Kinross announces investment in Revolution Resources
7/12/2012(Tasiast)Chartered Aircraft Crashes Enroute to Tasiast Mine, Killing ...
6/28/2012(Crixás)Kinross completes sale of Crixás mine interest for $220 mill...
6/11/2012(Tasiast)Kinross announces Tasiast work stoppage ends and production ...
5/29/2012(Crixás)Kinross agrees to sale of Crixás interest for $220 million
3/31/2012(Tasiast)Kinross files updated technical report for existing operati...
6/7/2011(Paracatu)Third Ball Mill Commissioned at Paracatu Mine
5/22/2011(Tasiast)Unionized Workers at Tasiast Return Following Brief Work Sto...
4/5/2011(Kupol)Kinross signs share purchase agreement to acquire 100% of Ku...
3/29/2011(Kupol)Kinross receives pre-approval to increase Kupol ownership to...
12/28/2007(Kupol) Provides Update on Administrative Process for Kupol Project...
3/21/2007(Cerro Casale)2007 Technical report
Corporate news of Kinross Gold Corporation
7/27/2016Kinross Gold reports 2Q loss
7/27/2016Kinross Reports 2016 Second-Quarter Results
7/27/2016How to View Gold Mining Earnings for Barrick, Goldcorp, Kinr...
1/19/2016Today’s Top Gold Miner Is Barrick; Which Will It Be Tomorrow...
1/14/2016Lundin Gold completes development agreement for Ecuador proj...
1/8/2016Why Are These Five Stocks Sinking Today?
1/7/2016Kinross to Announce 2015 Q4/Full-Year Results and 2016 Guida...
12/28/2015Agnico Eagle Leads the Pack with Impressive Cost Cutting
12/13/2015Top 5 Cheap Miners Poised to Explode
12/1/2015Is Ellie Mae Inc (ELLI) A Good Stock To Buy?
12/1/2015Kinross (KGC) Resumes Full Production at Paracatu Mine
12/1/2015Kinross Reports 2015 Third-Quarter Results
12/1/2015Kinross Acquires Strategic Nevada Assets
12/1/2015Kinross' Paracatu Mine Returns to Full Production
12/1/2015Do Its Recent Acquisitions Have an Exploration Upside for Ki...
12/1/2015How Diversified Exposure through Acquisitions Helps Kinross ...
12/1/2015What is Kinross’s New Approach to the Tasiast Expansion?
11/30/2015Kinross' Paracatu Mine Returns to Full Production
11/27/2015Behind Kinross’s Weak Production Performance in West Africa
11/27/2015Is There an Upside on Costs for Kinross’s Russia Operations?
11/24/2015Top Analyst Upgrades and Downgrades: Avon products, Brocade,...
10/15/201510.15.15 - Kinross to announce Q3 financial results on Novem...
10/15/2015Kinross to Announce Q3 Financial Results on November 10, 201...
10/13/2015Kinross Gold gets show of support
10/9/2015Comp: How Are Gold Miners Progressing on the Cost-Cutting Fr...
10/5/2015Comp: What Do Analysts Think About the Gold Miners?
10/2/201510.02.15 - Kinross addresses regulatory review of West Afric...
10/2/2015Kinross Addresses Regulatory Review of West Africa Operation...
9/29/2015Comp: Which Gold Miners Expect Production Growth Going Forwa...
9/25/2015Comparative Analysis: How Have Gold Miners Performed This Ye...
9/23/2015Dried-Up Gold Volume prior to the FOMC Policy-Setting Meetin...
9/17/2015Kinross Gold cuts 2015 capex and cost forecast, trims output...
9/17/201509.17.15 - Kinross updates 2015 full-year guidance
9/17/2015Kinross Updates 2015 Full-Year Guidance
9/10/2015Falling Earnings Estimates Signal Weakness Ahead for Kinross...
9/4/2015Probes Reporter's Latest Updates: Choice Hotels, GlaxoSmithK...
8/24/2015Pair Trade? RBC Upgrades Randgold Resources, Downgrades Kinr...
8/12/2015What Lies Ahead for Goldcorp after 2Q15
8/12/2015Goldcorp’s FCF Growth Could Strengthen Its Balance Sheet
8/10/2015A Micro-Cap Gold Company That Could Provide Major Return
8/7/2015Newmont’s Strong Project Pipeline Offers Near-Term Growth Op...
7/30/2015Edited Transcript of K.TO earnings conference call or presen...
7/30/2015Kinross Gold Reports Loss in Q2, Revenues Beat Estimates - A...
7/29/2015Kinross Gold reports 2Q loss
7/29/201507.29.15 - Kinross reports 2015 second-quarter results
7/29/2015Kinross Reports 2015 Second-Quarter Results
7/27/2015Dividend Heroes To Zeros: 4 'Stingy' Canadian Stocks
7/14/2015Kinross Gold Cuts Exploration & Option Agreement with LKA - ...
7/13/201506.23.15 - Kinross to announce Q2 financial results on July ...
5/8/2015Barrick Gold (ABX), Kinross Gold (KGC), Turquoise Hill (TRQ)...
4/27/2015Foreign Exchange and Fuel Tailwinds Could Help Newmont in 1Q...
4/15/2015Kinross to Announce Q1 Financial Results on May 5, 2015
4/12/2015The Top Guru-Held Canadian Stocks
4/1/2015Heavy Rains Temporarily Suspend Operations at Kinross' Maric...
3/31/2015(Kupol)Files Updated Technical Reports for Fort Knox and Kupol-Dvoi...
3/31/2015Kinross Files Updated Technical Reports for Fort Knox and Ku...
3/27/2015Kinross settles shareholder lawsuit tied to Mauritania debac...
3/4/2015Ecuador, seeking investment, buffs up mining sector image
2/10/2015Reports 2014 Fourth-Quarter and Full-Year Results
1/12/2015to Announce 2014 Q4, Full-Year Results, and 2015 Guidance on...
2/27/2014Kinross announces US$500 million unsecured 10-year debt offe...
1/8/2014Kinross to announce 2013 Q4 and full-year results and 2014 g...
11/13/2013Kinross reports 2013 third-quarter results
9/12/2013Kinross named to Dow Jones Sustainability World Index for th...
9/12/2013Named to Dow Jones Sustainability World Index for Third Cons...
8/29/2013??? - UPDATE
8/29/2013???
7/31/2013Kinross reports 2013 second-quarter results
6/10/2013Kinross extends maturity date of revolving credit facility a...
6/10/2013(Fruta Del Norte)Kinross announces it will cease development of Fruta del Nor...
5/7/2013Kinross reports 2013 first-quarter results
5/7/2013Reports 2013 First-Quarter Results
4/29/2013(Tasiast)Kinross reports results of pre-feasibility study on Tasiast ...
4/23/2013(Tasiast)Kinross to announce results of Tasiast pre-feasibility study...
3/13/2013Kinross announces exercises of put rights by holders of its ...
2/21/2013Miners Struggle as Gold Prices Struggle to Maintain Upwards ...
2/13/2013Kinross declares dividend
2/13/2013Kinross reports 2012 fourth-quarter and year-end results
2/7/2013Kinross announces filing of Schedule TO with respect to Put ...
1/10/2013Kinross to announce 2012 Q4 and full-year results and 2013 g...
1/10/2013to Announce 2012 Q4 and Full-Year Results and 2013 Guidance ...
11/7/2012Kinross reports 2012 third-quarter results
9/13/2012Kinross named to Dow Jones Sustainability World Index
9/13/2012Named to Dow Jones Sustainability World Index
9/7/2012Kinross funds one million meals to combat hunger
8/17/2012Kinross announces US$1.0 billion term loan, increases unsecu...
8/9/2012Kinross announces senior management appointments
6/6/2012(Tasiast)Kinross announces unlawful work stoppage at Tasiast
3/9/2012Funds Professorship in Mining Health and Safety at Queen's U...
1/17/2012Kinross provides preliminary 2011 results and 2012 outlook
12/22/2011(Kupol)Closes Term Loan to Fund Increase in Kupol Ownership
12/5/2011(Fruta Del Norte)Reaches Agreement in Principle With Ecuadorian Government on...
11/25/2011Kinross adjusts DD&A guidance
10/3/2011Kinross announces investment in Revolution Resources Corp. *...
9/8/2011Named to Dow Jones Sustainability World Index
7/6/2011Announces Support for Professorship at New Economic School i...
6/14/2011Announces Investment in Edgewater Exploration Ltd.
3/29/2011Kinross West Africa tour highlights growth potential
3/24/2011Kinross sells Harry Winston shares
2/16/2011Kinross declares dividend of $0,05
8/9/2010Shareholder Special Meeting
11/17/2009To Buy Out Teryl's Gold Property
9/26/2007Increases La Coipa Mine Ownership to 100%
2/20/2007and Bema Announce Acquisition Closing Date of February 27, 2...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (K.TO)NYSE (KGC)
9.24+0.43%6.75+0.27%
TORONTO
CA$ 9.24
04/26 16:33 0.040
0.43%
Prev close Open
9.20 9.28
Low High
9.22 9.39
Year l/h YTD var.
6.50 -  9.31 16.96%
52 week l/h 52 week var.
5.95 -  9.31 35.48%
Volume 1 month var.
3,344,494 19.53%
24hGold TrendPower© : 20
Produces Gold - Silver
Develops Copper - Gold - Silver
Explores for Copper - Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/29/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202430.69%
202328.08%7.474.77
2022-23.01%7.993.92
2021-23.23%9.916.35
202054.64%9.9710.02
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.27+2.73%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.63-2.23%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.76+0.28%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :