Updated Resource and Reserve Statement -Correction

For immediate release

10 September 2015

Centamin plc ("Centamin" or "the Company")

(LSE:CEY, TSX:CEE)

Updated Resource and Reserve Statement - Correction

[There was an error in today's earlier release in the Tonnes and Grade columns within the Total Combined (Open Pit and Underground) Mineral Reserve table. This has now been corrected.]

Centamin is pleased to provide an update to its Mineral Resource and Mineral Reserve estimates for the Sukari Gold Mine, as at 30 June 2015, as outlined below.

Highlights

· Total Measured and Indicated Mineral Resource estimate of 13 million ounces (Moz) gold, is reported as an open pit resource at a 0.3g/t cut-off grade. This total is inclusive of the 1.0 Moz underground resource.

· Total combined open pit and underground Mineral Reserve estimate of 8.8 Moz, which is an increase of 7% from the previous 8.2 Moz at 30 September 2013. The increase is due to lower operating mining and processing costs associated with lower international fuel prices, and continued drilling from underground to move ounces up through the resource categories and increase the underground reserve.

· Open pit and surface stockpile reserve estimate of 8.3 Moz.

· Underground reserve estimate of 2.7 million tonnes (Mt) containing 0.5 Moz.

· Resource and reserve definition continues in parallel with expanding underground infrastructure, targeting higher grade areas.

Total Mineral Resource for the Sukari Gold Mine

Measured

Indicated

Total Measured & Indicated

Inferred

Cut-off (g/t)

Tonnes (Mt)

Grade (g/t)

Tonnes (Mt)

Grade (g/t)

Tonnes (Mt)

Grade (g/t)

Gold (Moz)

Tonnes (Mt)

Grade (g/t)

Gold (Moz)

0.3

198

1.05

188

1.02

386

1.03

12.9

33

1.0

1.1

0.4

160

1.22

152

1.18

312

1.20

12.0

26

1.2

1.0

0.5

133

1.38

124

1.34

257

1.36

11.2

21

1.3

0.9

0.7

95

1.69

87

1.66

182

1.68

9.8

15

1.7

0.8

1.0

62

2.14

56

2.12

118

2.13

8.1

9

2.1

0.6

Notes to Table:

· Totals may not equal the sum of the components due to rounding adjustments.

· The Mineral Resource estimate is based on the open pit mined surface as at 30 June 2015 and adjusted for underground mine workings as at 30 June 2015.

· All available assays as at February 2015.

· Resource data set comprises 252,449 two metre down hole composites and surface rock chip samples.

· Mineral Resources are reported inclusive of those resources converted to Proven and Probable Mineral Reserves.

· The resources are estimates of recoverable tonnes and grades using Multiple Indicator Kriging with block support correction.

· Measured Resources lie in areas where drilling is available at a nominal 25 x 25 metre spacing, Indicated resources occur in areas drilled at approximately 25 x 50 metre spacing and Inferred resources exist in areas of broader spaced drilling.

· The resource model extends from 9700mN to 12200mN and to a maximum depth of 0mRL (a maximum depth of approximately 1,000 metres below wadi level).

Underground Mineral Resource for the Sukari Gold Mine (included within the total resource above)

Tonnes

('000 t)

Grade

(g/t)

Gold

('000 oz)

Measured

1,850

6.5

390

Indicated

2,820

7.0

630

Total M&I

4,670

6.8

1,020

Inferred

6,970

5.6

1,240

Notes to Table:

· Totals may not equal the sum of the components due to rounding adjustments.

· The Mineral Resource is reported above 2g/t within interpreted mineralised domains.

· The Mineral Resource estimate is depleted by underground mine workings as at 30 June 2015.

· All available information has been used including mapping from underground mining and assays as at June 2015.

· Available resource data resulted in 21,369 one metre down hole composites used for grade estimation.

· The Mineral Resources were estimated utilising a single Indicator weighted Kriging method (IK) to estimate gold for each of the mineralisation domains.

· Measured Mineral Resources are defined by a drill spacing of at least 20m x 20m and confined to the interpreted mineralisation defined by underground mine development. Indicated Mineral Resources are defined as areas outside the Measured Mineral Resource and defined by approximately 20m x 20m drill spacing. Inferred Mineral Resources include all remaining estimated mineralisation defined by a drill spacing of approximately 50m x 50m.

· Mineral Resources are reported inclusive of those resources converted to Proven and Probable Mineral Reserves.

· The underground resource is located within the boundaries of the open pit resource, and is included within that total.

Total Combined (Open Pit and Underground) Mineral Reserve for the Sukari Gold Mine.

Proven

Probable

Mineral Reserve

Tonnes

(Mt)

Grade

(g/t)

Tonnes

(Mt)

Grade

(g/t)

Tonnes

(Mt)

Grade

(g/t)

Gold

(Moz)

New Reserve (1-4)

152

1.05

101

1.15

253

1.09

8.8

Previous Reserve(5)

119

1.06

111

1.17

230

1.11

8.2

Notes to Table:

· Totals may not equal the sum of the components due to rounding adjustments

(1) Total includes:

Open pit Mineral Reserve = 229Mt @ 1.09g/t for 8.0Mozs

Underground Mineral Reserve = 2.7Mt @ 6.0g/t for 0.5Mozs

Stockpiles = 21Mt @ 0.42g/t for 0.3Mozs

(2) Based on open pit mined surface as at 30 June 2015, underground mine workings as at 30 June 2015, and a gold price of US$1,300 per ounce

(3) Ultimate open pit design has a waste to ore ratio of 5.9:1.

(4) See additional notes in tables below for the underground and open pit Mineral Reserves

(5) As at 30th September 2013 at US$1,300 per ounce

Open Pit Mineral Reserve by Classification

The component of the combined reserve, as outlined above, that relates to the open pit operation is summarised below.

Reserve Classification

Tonnes

(Mt)

Grade

(g/t Au)

Gold

(Moz)

Proven

130

1.11

4.6

Probable

99

1.07

3.4

Stockpile

21

0.42

0.3

Total

250

1.03

8.3

Notes to Table:

· Totals may not equal the sum of the components due to rounding adjustments.

· Based on mined surface as at 30 June 2015 and a gold price of US$1,300 per ounce.

· International diesel price reductions allowed a lower diesel price assumption, resulting in a lowering of the mining cost and the CIL processing costs.

· Diesel price used was US$0.70/litre and the previous diesel price was US$0.84/litre, current fuel price for Sukari is US$0.52/litre

· Cut-off grades (gold): CIL oxide 0.40g/t, CIL transitional 0.42g/t, CIL sulphide 0.42g/t, Dump Leach oxide 0.08g/t.

· Designed underground reserves detailed below do not form part of the open pit reserve.

Underground Mineral Reserve by Classification

The component of the combined reserve, as outlined above, that relates to the underground operation is summarised below.

Reserve

Tonnes

('000 t)

Grade

(g/t Au)

Gold

('000 oz)

Proven

1,020

6.1

200

Probable

1,700

5.9

320

Total

2,720

6.0

520

Notes to Table:

· Totals may not equal the sum of the components due to rounding adjustments.

· Based on underground mine workings as at 30 June 2015.

· Stopes for reserves estimation are designed using a 3g/t cut-off and mining dilution applied at 15% @ 0.8g/t as all stopes are located in mineralised porphyry and 10% mining loss is then assumed to allow for stope bridges and material left in stopes after mining.

· Mineral Resources are reported inclusive of those resources converted to Proven and Probable Mineral Reserves.

An updated NI 43-101 resource and reserve report will be completed and filed in due course on SEDAR at www.sedar.comand on the Company's website.

Andrew Pardey, Chief Executive Officer, commented:

"Sukari has a robust resource, supporting an open pit mine life in excess of 20 years. The recent reduction in international fuel prices has had a positive impact on the reserve estimate, mainly in the deeper portions of the open pit.

It is pleasing to see that, as underground mining rates have ramped up to the current level of around 1 million tonnes per annum, there has been continued growth of the underground reserve with the average grade in line with our production forecast of 6 g/t. Also of note is the continued increase, net of mining depletion, in both the Measured & Indicated and Inferred components of the underground resource, providing support to our expectation for further material increases over the coming years as development, and hence drilling, continues to extend along strike and at depth.

Sukari remains in a strong position to continue to operate in the current low gold price environment and we maintain our existing 5-year production forecast. We remain focussed on ensuring costs are closely controlled and on realising the potential for further improvements in operational efficiencies over the coming quarters."

Centamin plc

Josef El-Raghy, Chairman

Andrew Pardey, CEO

Andy Davidson, Head of Investor Relations

([email protected]) +44 (0) 1534 828708

Buchanan

Bobby Morse

+ 44 (0) 20 7466 5000

QUALIFIED PERSON AND QUALITY CONTROL

Information of a scientific or technical nature in this document was prepared under the supervision of Patrick Smith of AMC Consultants Pty Ltd, Australia, a qualified person under the Canadian National Instrument 43-101.

The open pit mineral resource was prepared by Nic Johnson of MPR Geological Consultants Pty Ltd, Australia. The open pit mineral reserve was prepared by Julian Poniewierski of AMC Consultants Pty Ltd, Australia. The underground mineral resource was prepared by Mark Zammit of Cube Consulting Pty Ltd, Australia. The underground mineral reserve was prepared by Chris Boreham, Underground Mine Manager of Centamin plc, and audited and approved by Declan Franzmann of Crosscut Consulting Pty Ltd, Australia. Mr Johnson, Mr Zammit, Mr Poniewierski, and Mr Franzmann are Qualified Persons under the Canadian National Instrument 43-101. Mr Boreham is a Competent Person as defined in the 2012 Edition of the "Australian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves (JORC Code)".

Such qualified persons have verified the data disclosed, including sampling, analytical, and test data underlying the information or opinions contained in this announcement in accordance with standards appropriate to their qualifications.

An updated NI 43-101 resource and reserve report will be completed and filed in due course on SEDAR at www.sedar.com and on the Company's website.

In relation to historical resources and reserves, refer to the technical report entitled "Mineral Resource and Reserve Estimate for the Sukari Gold Project, Egypt" dated 30 January 2014 and filed on SEDAR at www.sedar.com, for further discussion of the extent to which the estimate of mineral resources/reserves may be materially affected by any known environmental, permitting, legal, title, taxation, socio-political, or other relevant issues.

CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS

This document contains "forward-looking information" which may include, but is not limited to, statements with respect to the future financial or operating performance of Centamin plc ('Centamin' or 'the Company'), its subsidiaries (together 'the Group'), affiliated companies, its projects, the future price of gold, the estimation of mineral reserves and mineral resources, the realisation of mineral reserve and resource estimates, the timing and amount of estimated future production, revenues, margins, costs of production, estimates of initial capital, sustaining capital, operating and exploration expenditures, costs and timing of the development of new deposits, costs and timing of future exploration, requirements for additional capital, foreign exchange risks, governmental regulation of mining operations and exploration operations, timing and receipt of approvals, consents and permits under applicable mineral legislation, environmental risks, title disputes or claims, limitations of insurance coverage and regulatory matters. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "targets", "aims", "anticipates" or "believes" or variations (including negative variations) of such words and phrases, or may be identified by statements to the effect that certain actions, events or results "may", "could", "would", "should", "might" or "will" be taken, occur or be achieved.

Forward-looking statements involve known and unknown risks, uncertainties and a variety of material factors, many of which are beyond the Company's control which may cause the actual results, performance or achievements of Centamin, its subsidiaries and affiliated companies to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Readers are cautioned that forward-looking statements may not be appropriate for purposes other than those outlined in this document. Such factors include, among others, future price of gold; general business, economic, competitive, political and social uncertainties; the actual results of current exploration and development activities; conclusions of economic evaluations and studies; fluctuations in the value of the U.S. dollar relative to the local currencies in the jurisdictions of the Company's key projects; changes in project parameters as plans continue to be refined; possible variations of ore grade or projected recovery rates; accidents, labour disputes or slow-downs and other risks of the mining industry; climatic conditions; political instability, insurrection or war, civil unrest or armed assault; labour force availability and turnover; delays in obtaining financing or governmental approvals or in the completion of exploration and development activities; as well as those factors referred to in the section entitled "Risks and Uncertainties" section of the most recently filed Management Discussion and Analysis on www.sedar.com. The reader is also cautioned that the foregoing list of factors is not exhaustive of the factors that may affect the Company's forward-looking statements.

Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward-looking statements contained herein are made as of the date of this document and, except as required by applicable law, the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

ABOUT CENTAMIN PLC

Centamin plc is a mineral exploration, development and mining company dual listed on the London Stock Exchange (LSE: CEY) and the Toronto Stock Exchange (TSX: CEE). Centamin's principal asset, the Sukari Gold Mine, began production in 2009 and is the first large-scale modern gold mine in Egypt, with production ramping up towards c.500,000 ounces per annum by 2017. Our solid financial position, strong cash flows and development and operating experience provides us with a significant advantage in acquiring and developing other gold projects. Our most advanced exploration projects are located in highly prospective regions within the investor-friendly jurisdictions of Burkina Faso and Cote d'Ivoire. Centamin is also conducting early stage exploration activities on permits in Ethiopia which form part of the prospective Arabian-Nubian Shield.


This information is provided by RNS
The company news service from the London Stock Exchange
ENDMSCPKKDDOBKKFCD
Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Australia | Burkina Faso | Egypt | Ethiopia | All
Gold and Silver Prices for these countries : Australia | Burkina Faso | Egypt | Ethiopia | All

Centamin Egypt Limited

PRODUCER
CODE : CEY.L
ISIN : JE00B5TT1872
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Centamin is a gold producing company based in .

Centamin holds various exploration projects in Egypt.

Its main asset in production is SUKARI in Egypt.

Centamin is listed in Australia, in Canada and in United Kingdom. Its market capitalisation is GBX 144.0 billions as of today (US$ 168.1 billions, € 157.1 billions).

Its stock quote reached its lowest recent point on February 14, 2003 at GBX 10.09, and its highest recent level on April 26, 2024 at GBX 125.00.

Centamin has 1 152 108 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Centamin Egypt Limited
7/31/2007Quarterly Report for the Quarter Ended 30 June 2007Content-c...
In the News and Medias of Centamin Egypt Limited
10/5/2018Centamin drops more than 12 percent on second cut to annual ...
Annual reports of Centamin Egypt Limited
PLC: 2014 Annual Report and Accounts and Notice of AGM
plc Annual Report and Annual Information Form
2009 Annual Report
2008 Annual Report
Financings of Centamin Egypt Limited
7/17/2009Closing of Private Placement Financing
7/3/2009Private Placement for Gross Proceeds of C$29,640,000
1/20/2009Enters Into A Bought Deal Agreement for Gross Proceeds of C$...
11/2/2007ANNOUNCES C$100,000,000 “BOUGHT DEAL” FINANCING
Option Grants of Centamin Egypt Limited
8/8/2011Closes Recommended Cash Offer for Sheba Exploration (UK) Plc
Nominations of Centamin Egypt Limited
4/10/2013plc =2D Directors Dealing
1/18/2012plc Board Appointment
10/5/2011Opening of London Office and Appointments
4/1/2011Board Committee Changes
3/24/2011appointment of Mr Gordon Edward Haslam as a non-executive di...
2/24/2011Board Appointments and General Company Update
4/18/2007Appointment of Barclays Capital as Mandated Lead Arranger fo...
Financials of Centamin Egypt Limited
8/2/2011Quarterly Report for the Three Months Ended 30 June 2011
5/5/2011Quarterly Report for the Three Months Ended 31 March 2011
5/5/2010Third Quarter Report
2/13/2010Second Quarter Report
Project news of Centamin Egypt Limited
4/8/2015PLC Announces Q1 2015 Preliminary Production Results
7/9/2013PLC - Q2 Preliminary Production Results
7/9/2013PLC - Q2 Preliminary Production Results
7/9/2013PLC - Q2 Preliminary Production Results
3/14/20132013 Production Guidance Update
3/14/20132013 Production Guidance Update
1/9/2013plc =2D Q4 Preliminary Production Results
10/9/2012plc Q3 Preliminary Production Results
8/2/2012(Sukari)Sukari Gold Mine Resumption of Operations
5/30/2012announces Optimised Open Pit Mine Plan
4/12/2012Q1 Preliminary Production Results
3/28/2012plc - Investor site visit presentation, Stage 4 expansion an...
3/12/2012(Sukari)plc Sukari Gold Mine Resumption of Operations
3/6/2012(Sukari)plc Sukari Gold Mine Halted by Illegal Labour Unrest
1/10/2012plc Q4 Preliminary Production Results
10/11/20113rd Quarter Preliminary Production Results
5/3/2011(Sukari)Sukari Stage 3 Commissioning Commences 2 Months Ahead of Sch...
2/19/2011(Sukari)Update on operations
2/1/2011(Sukari)Quarterly Report for the Three Months Ended 31 December 2010
6/8/2010(Sukari)Sukari Gold Project Resource Upgrade
3/29/2010(Sukari)Pours first tonne of gold processes one millionth tonne or o...
12/11/2009(Sukari)Sukari Gold Project Resource Upgrade
7/15/2009(Sukari)Sukari Gold Project Resource Upgrade
6/29/2009(Sukari)First Gold Pour from the Sukari Gold Project
4/8/2008(Sukari) Sukari Gold Project Resource Upgrade [Scanned]
2/9/2008(Sukari)New High Grade Zone at Amun Deeps Intersected
12/20/2007(Sukari)Resource Upgrade
11/29/2007Initial Drilling at Kurdeman Prospect Intersects Ore Grade Z...
11/21/2007 New High Grade Zone at Amun Deeps Discovered with 22m @ 21....
9/20/2007(Sukari)Sukari Resource Upgrade
8/22/2007Drill program continues to intersect high grade Gold
6/14/2007(Sukari)Mineralised Extensions Defined at Sukari and Regional Explor...
Corporate news of Centamin Egypt Limited
7/7/2016Report on payments to Governments
7/1/2016Director dealing notice
6/13/2016PDMR Dealing Notice
6/7/2016Director dealing notice
1/19/2016TR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
12/1/2015TR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
10/23/2015Market Update Technical Report
10/23/2015Centamin plc Market Update - Form 43-101F1 Technical Report
10/8/2015Q3 2015 Preliminary Production Results
10/8/2015Centamin plc ("Centamin" or "the Company") Q3 2015 Prelimina...
9/25/2015TR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
9/10/2015Centamin plc Updated Resource and Reserve Statement -Correct...
9/10/2015Updated Resource and Reserve Statement -Correction
9/10/2015Centamin plc Updated Resource and Reserve Statement
9/3/2015Centamin plc: Director Acquisition of Shares
9/3/2015Director Acquisition of Shares
8/28/2015TR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
8/12/2015Q2 Results 2015 and Interim Dividend
8/12/2015Centamin plc Results for the Second Quarter and Half Year En...
7/9/2015Q2 2015 Preliminary Production Results
7/9/2015Centamin PLC Announces Q2 2015 Preliminary Production Result...
4/13/20152014 Annual Report and Accounts and Notice of AGM
4/13/2015Centamin PLC: 2014 Annual Report and Accounts and Notice of ...
4/8/2015Q1 2015 Preliminary Production Results
4/8/2015Centamin PLC Announces Q1 2015 Preliminary Production Result...
3/23/2015Centamin shares rise on maiden dividend
3/23/20152014 Annual Results
3/23/2015Centamin PLC: Centamin PLC Results for the Year Ended 31 Dec...
3/23/2015PLC: Centamin PLC Results for the Year Ended 31 December 201...
2/9/2015TR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
1/27/2015Retirement of Non-Executive Director
1/27/2015Centamin PLC: Retirement of Non-Executive Director
1/25/2015TR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
1/15/2015Appointment of Chief Executive Officer
1/15/2015Centamin PLC Announces Appointment of Chief Executive Office...
1/8/20152015 Production Guidance and Q4 Production Results
1/8/2015Centamin plc: 2015 Production Guidance and Q4 Preliminary Pr...
11/12/2014Results for the quarter ended 30 September 2014
11/12/2014Centamin plc Results for the Third Quarter and Nine Months E...
11/5/2014Centamin plc: Sukari Production Update
10/9/2014Centamin Q3 Preliminary Production Results
8/14/2014Centamin PLC Announces Q2 Results 2014 and Maiden Interim Di...
7/9/2014Centamin PLC ("Centamin" or "the Company"): Q2 Preliminary P...
6/5/2014Centamin plc: PDMR Dealing Notice
5/30/2014Centamin PLC: Voting Rights and Capital
5/22/2014Centamin plc: Director Acquisition of Shares
5/19/2014Centamin plc: Director Acquisition of Shares
5/16/2014Centamin plc: Results of Annual General Meeting of Sharehold...
5/16/2014Centamin PLC: Dividend Policy Update
5/15/2014Centamin PLC Announces Results for the Quarter Ended 31 Marc...
4/30/2014Centamin PLC: Application for Listing of Ordinary Shares
8/14/2013Results for Quarter Ended 30 June 2013
5/23/2013plc =2D Results of Annual General Meeting of Shareholders
5/15/2013plc =2D Results for the Quarter Ended 31 March 2013
5/10/2013plc =2D Egyptian Legal Proceedings Update
5/7/2013plc =2D notification of updated financial calendar
4/26/2013plc =2DAnnual Report and Accounts 2012 and Notice of AGM
4/9/2013plc =2D
3/27/2013plc =2D 2012 Annual Results
3/27/20132012 Annual Results
3/20/2013plc =2D Market update =2D Court ruling suspended
2/21/2013plc =2D Participation in Placing
11/14/2012plc - Quarterly Report for the Three Months Ended 30 Septemb...
11/14/2012plc: Results for the Quarter Ended 30 September 2012
11/8/2012PLC Announces Media Presentation
10/30/2012PLC - Market update
8/14/2012PLC Q2 Results 2012
7/25/2012(Sukari)Plc announces Sukari Operations
7/9/2012PLC: Media Speculation in Egypt
5/30/2012plc Results of AGM
5/9/2012plc Results for the Quarter Ended 31 March 2012
5/4/2012plc Notice of Annual General Meeting
4/10/2012announces application for additional listing
4/10/2012plc Application for Additional Listing
2/6/2012New Centamin plc website
2/3/2012Participation in Placing
1/30/2012Q4 Results
12/30/2011plc Completion of Redomicile and Commencement of Trading
12/20/2011Publication of Prospectus
12/20/2011Notification of Court Approval
12/14/2011Results of Scheme Meeting and EGM
7/29/2011Recommended Cash Offer by Centamin Egypt Limited for Sheba E...
7/11/2011Makes Recommended Offer for Sheba
5/26/2011-Results of Annual General Meeting of Shareholders
3/3/2010Board Changes
2/26/2010Consolidated Financial Report for the Half-Year Ended 31 Dec...
1/11/2010First Gold Export and Design Throughput Achieved
8/4/2009Intention to Move to Official List
7/22/2008Former Australian Ambassador to Egypt Appointed to Board [Sc...
2/1/2008Quarterly Report
8/29/2007Completion of Kori Kollo Dismantling
5/8/2007Sukari Gold Project Resource Upgrade
5/3/2007Environmental Approval Obtained
4/27/2007Quarterly Report for the Quarter Ended 31 March 2007
4/23/2007Closure of Over-Allotment Option
4/10/2007Closing of First Tranche of Offering and Listing on the Toro...
3/15/2007C$140 Million Placing Completed - TSX Listing Underway
3/31/2006Placing of 75 million new ordinary shares at a price of 27.5...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
LSE (CEY.L)AUSTRALIA (CNT.AX)
125.00+0.73%2.02-3.35%
LSE
GBX 125.00
04/26 17:35 0.900
0.73%
Prev close Open
124.10 124.90
Low High
124.32 126.90
Year l/h YTD var.
89.60 -  130.30 25.00%
52 week l/h 52 week var.
78.15 -  130.30 19.62%
Volume 1 month var.
4,040,332 12.71%
24hGold TrendPower© : 37
Produces Gold
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 4/14/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202438.89%
2023-20.28%99.65100.10
202227.11%99.86100.05
2021-28.20%99.82100.10
20205.37%233.30100.55
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :