Pure Gold Mining.

Published : February 28th, 2017

Intersects 69.0 g/t Gold Over 1.2 Metres and 30.0 g/t Gold Over 1.0 Metre at the McVeigh, Madsen Gol

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

If you are having trouble viewing this email properly, please click here:
View Online

Pure Gold Intersects 69.0 g/t Gold Over 1.2 Metres and 30.0 g/t Gold Over 1.0 Metre at the McVeigh, Madsen Gold Project

February 28, 2017

Aggressive resource expansion drilling continues to substantially grow high-grade gold zones

VANCOUVER, B.C. �?" Pure Gold Mining Inc. (PGM �?" TSX-V) (�?oPure Gold�?� or the �?oCompany�?�) is pleased to announce drill results from the ongoing 70,000 metre drill program at the Company�?Ts 100% owned Madsen Gold Project (�?oMadsen�?�). Results reported herein are from the four drill rig exploration program, designed to expand the high grade gold resource near the existing permitted infrastructure and to demonstrate the expansive potential along the five kilometre strike length of the Madsen gold-mineralized system.

Highlights from new drilling include:

  • 30.0 g/t gold over 1.5 metres in hole PG16-306 (McVeigh)
  • 69.0 g/t gold over 1.2 metres in hole PG16-318 (McVeigh)
  • 58.8 g/t gold over 2.0 metres in hole PG17-304 (A3)
    • Including 113.3 g/t gold over 1.0 metre

�?oOur primary goal in 2017 is to aggressively expand the mineral resource to allow us to maximize the value of the existing infrastructure and permits,�?� said Darin Labrenz, President and CEO of Pure Gold. �?oResults released today support this goal with McVeigh drill holes intersecting high grade gold mineralization well below past mine workings and significantly beyond the limits of the existing resource. Importantly, drilling results from the McVeigh support our geologic models and highlight the internal continuity of the gold mineralization.�  The McVeigh mineralization remains open in all directions and we continue to systematically step down and along strike to establish the size of this large gold-bearing mineral system.�?�

Drilling on the McVeigh Expands the Mineralized Shoots and Builds Continuity
These new drill holes have identified new gold mineralization well below any shallow historical workings and importantly outside of the bounds of the current mineral resource.�  Drill hole PG17-318 is the deepest high grade intercept drilled by Pure Gold to date in the McVeigh West area.� �  This result highlights a new gold mineralized shoot at a depth of 350 vertical metres.�  Given the low density of previous drill testing in this part of the deposit, we expect that additional drilling here could expand the mineral resource. Approximately 200 metres along strike to the south, drill hole PG17-306 intersected the McVeigh at a vertical depth of 225 metres, at the south end of, and significantly below, historic mine workings.�  We expect this intercept to also expand the high grade resource domains, as it is centered 200 metres down plunge of, and laterally between, drill intercepts PG16-152 which returned 32.5 g/t gold over 2.0 metres and PG16-185 which returned 9.5 g/t gold over 4.9 metres2.

Drilling on the Austin A3 Target Confirms Continuity
The potential of the A3 Target was initially established by drill hole PG16-229 which returned 25.4 g/t gold over 8.0 metres at a vertical depth of 400 metres3. � Importantly, today�?Ts results establish the high grade continuity of the A3 with drill hole PG17-304 returning 58.8 g/t gold over 2.0 metres approximately 40 metres south of hole PG16-229.�  The A3 target was established by Pure Gold in 2016 by applying a new geologic model, and does not yet form a part of the existing mineral resource.�  Drill holes PG16-231 and PG16-282, define approximately 450 metres of plunge extent and establish the scale of the A3 Target supporting the expectation of significant resource potential in this part of the Madsen mineral system (see A3 Long Section).

McVeigh Ramp Services Installation in Progress
The McVeigh Ramp provides ramp access to the top 150 vertical metres of mine workings, declining in the footwall of the McVeigh horizon for 1,080 linear metres from surface to just above three level. On completion of services installation the portal and ramp will provide immediate access to the footwall of the McVeigh and Austin horizons allowing for cost effective underground drilling which is expected to provide sufficient drill density to better define future mining shapes, as well as allow exploration drilling to continue to expand the resource.

Pure Gold has removed the rock covering from the portal opening and has completed a geotechnical inspection of the decline determining ground conditions to be excellent.�  The ramp was found to be substantially dry with drainage routing towards the shaft and away from the bottom of the ramp. Work is nearing the final stages in the construction of a powerline from the mill to the portal area, and mine air heating and ventilation systems have been received at site. Surface infrastructure installation to support the underground work program continues.�  Currently it is anticipated that underground Diamond drilling will commence in the second quarter of 2017.

Drill Results Summary
New assay results from select drill holes are outlined below:

Hole ID

From (m)

To (m)

Length (m)

Gold (g/t)

Zone

PG17-301

354.3

354.8

0.5

7.8

McVeigh

PG17-304

465.5

467.5

2.0

58.8

A3

incl.

465.5

466.5

1.0

113.3


PG17-305

136.0

141.4

5.4

4.9

McVeigh

incl.

136.0

138.5

2.5

7.5


PG17-306

296.5

298.0

1.5

30.0

McVeigh


363.5

365.1

1.6

4.7

McVeigh

PG17-311

411.7

416.4

4.7

2.9

McVeigh

PG17-318

415.2

416.4

1.2

69.0

McVeigh

*Assay composites were calculated using uncut assays and true widths are interpreted to vary from 50-100% (80%, on average) of reported core lengths above.

To date, gold mineralization in the McVeigh horizon has been intersected by Pure Gold over a 1,100 metre strike length, to a depth of 370 metres below surface, and remains open for resource expansion.�  Furthermore, drilling by previous operators has demonstrated the depth potential of the McVeigh mineralization to a vertical depth of one kilometer.�  Current drilling indicates that high grade shoots intersected at the McVeigh have similar geometry and style to the Austin mineralization which occurs in the hanging wall, and from which over two million ounces was historically mined.

For an overview long section showing the McVeigh horizon, click link below:
http://puregoldmining.ca/sites/default/files/McVeigh-Long-Section-02282017.pdf

For a detailed long section showing the recent McVeigh West drill results, click link below:
http://puregoldmining.ca/sites/default/files/McVeigh-West-LS-02282017.pdf

For a detailed long section showing the recent A3 drill results, click link below:
http://puregoldmining.ca/sites/default/files/Austin-A3-Long-Section-02282017.pdf

For a complete list of 2016 drill results to date, click link below:
http://puregoldmining.ca/sites/default/files/2017-DH-Intercepts-Table-February-28.pdf

Pure Gold�?Ts 2017 exploration program is on-going with four drill rigs currently testing resource growth potential near the mine infrastructure and along the more than five kilometre strike length of the Madsen mineral system.�  The program is expected to include 70,000 metres of core drilling, and will include underground drilling, projected to commence in Q2 2017. Further results will be released as available.

ABOUT MADSEN

The Madsen Mine operated for over 36 years with historic production of 2.5 million ounces at an average grade of 9.9 g/t gold. The Madsen Gold Project hosts a permitted mill and tailings facility, and access to power, water and labour. The Madsen Gold Project has an Indicated Resource of 928,000 ounces gold at 8.93 g/t gold (in 3.24 million tonnes) and an Inferred Resource of 297,000 ounces gold at 11.74 g/t gold (in 0.79 million tonnes)1. The mineral resource is based on 13,624 drill holes, evenly dispersed throughout the mineral resource. A robust geologic model based on 27 levels of geological mapping and chip sampling provides a solid understanding of the geology and continuity of mineralization.

In addition to the mineral resource, the Madsen Gold Project hosts a number of prospective new discoveries including the Fork Zone and Russet South targets, as well as, two significant historic underground mines. Pure Gold believes the opportunity exists to advance these targets through the application of modern exploration science and a new understanding of the district.

(1) See the National Instrument 43-101 technical report entitled �?oTechnical Report on the Preliminary Economic Assessment For the Madsen Gold Project,�?� prepared by Nordmin Engineering Ltd., dated effective April 20, 2016. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.� 

(2) See Pure Gold news releases dated September 6, 2016, and September 27, 2016.

(3)See Pure Gold news release dated October 31, 2016

QA/QC and Core Sampling Protocols

Drill core samples are bagged and sealed and submitted to SGS in Red Lake, Ontario for sample preparation by crushing to 75% less than 2mm, a riffle split of 1kg, and pulverization of the split to better than 85% passing 75 microns. Gold analysis is completed in the SGS Red Lake lab with a 30g fire assay and AAS finish (code GE-FAA313). Samples returning >5 g/t Au are re-assayed with a gravimetric finish (code GO-FAG303). Mineralized zones with visible gold are also analyzed by a 1kg screen fire assay with screening to 106 microns (code GO-FAS51K). Two 30g fire assays are conducted on the screen undersize and combined with an assay of the entire oversize fraction. Control samples (accredited standards and non-accredited blanks) were inserted on a regular basis. Results are assessed for accuracy, precision and contamination on an ongoing basis.

Qualified Persons and 43-101 Disclosure

Phil Smerchanski, P. Geo., Vice President, Exploration for the Company, is the designated Qualified Person for this news release within the meaning of National Instrument 43-101 (�?oNI 43-101�?�) and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same.

ABOUT PURE GOLD

Our mandate is pure and simple. To dream big. To colour outside the lines. To use smart science and creativity to unlock the next major discovery at the Madsen Gold Project in Red Lake, Ontario. And become Canada�?Ts next iconic gold company.

Additional information about the Company and its activities may be found on the Company�?Ts website at www.puregoldmining.ca and under the Company�?Ts profile at www.sedar.com.

ON BEHALF OF THE BOARD

"Darin Labrenz"� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � 

Darin Labrenz, President & CEO

Investor inquiries:
Tel: 604-646-8000
info@puregoldmining.ca

All statements in this press release, other than statements of historical fact, are "forward-looking information" with respect to Pure Gold within the meaning of applicable securities laws, including, but not limited to statements with respect to those that address potential quantity and/or grade of minerals, potential size and expansion of a mineralized zone, proposed timing of exploration and development plans. Forward-looking information is often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "planned", "expect", "project", "predict", "potential", "targeting", "intends", "believe", "potential", and similar expressions, or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "should", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management at the date the statements are made including, among others, assumptions about future prices of gold and other metal prices, currency exchange rates and interest rates, favourable operating conditions, political stability, obtaining governmental approvals and financing on time, obtaining renewals for existing licences and permits and obtaining required licences and permits, labour stability, stability in market conditions, availability of equipment, accuracy of any mineral resources, successful resolution of disputes and anticipated costs and expenditures. Many assumptions are based on factors and events that are not within the control of Pure Gold and there is no assurance they will prove to be correct.

Such forward-looking information, involves known and unknown risks, which may cause the actual results to be materially different from any future results expressed or implied by such forward-looking information, including, risks related to the interpretation of results at the Madsen Gold Project; changes in project parameters as plans continue to be refined; current economic conditions; future prices of commodities; possible variations in grade or recovery rates; the costs and timing of the development of new deposits; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; the timing and success of exploration activities generally; delays in permitting; possible claims against the Company; labour disputes and other risks of the mining industry; delays in obtaining governmental approvals, financing or in the completion of exploration as well as those factors discussed in the Annual Information Form of the Company dated June 17, 2016 in the section entitled "Risk Factors", under Pure Gold�?Ts SEDAR profile at www.sedar.com.

Although Pure Gold has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Pure Gold disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise unless required by law.

©2017 Pure Gold Mining Inc. � | � puregoldmining.ca
Suite 1900, 1055 West Hastings, Vancouver, BC V6E 2E9

Subscribe � | � 

Pure Gold Mining
1900, 1055 West Hastings
Vancouver British Columbia V6E 2E9
Canada

This email is intended for .com.
Update your preferences or
.
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Pure Gold Mining.

EXPLORATION STAGE
CODE : PGM.V
ISIN : CA74624E1007
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Pure Gold. is a gold exploration company based in Canada.

Its main exploration properties are MADSEN, VAN HORNE, NEW KLONDIKE, GOLDPINES, GRENVILLE and MAZE LAKE in Canada.

Pure Gold. is listed in Canada. Its market capitalisation is CA$ 3.8 millions as of today (US$ 3.0 millions, € 2.9 millions).

Its stock quote reached its highest recent level on December 18, 2020 at CA$ 3.08, and its lowest recent point on November 01, 2022 at CA$ 0.01.

Pure Gold. has 187 780 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Pure Gold Mining.
4/1/2019Pure Gold eyes London listing this quarter
Financings of Pure Gold Mining.
3/20/2013Closes $100,000 Non-Brokered Private Placement
6/14/2011AngloGold Ashanti Ltd. Exercises Laurentian Goldfields Ltd. ...
3/7/2011Closes $2.65 Million Non-Brokered Private Placement
2/18/2011Increases Non-Brokered Private Placement
Financials of Pure Gold Mining.
9/23/2016Pure Gold Announces AGM Results
6/18/2016Reports Fiscal 2016 Financial Results
Project news of Pure Gold Mining.
7/14/2016(Madsen)Extends High Grade Gold to a Depth of 275 Metres - 170 Metre...
5/17/2016(Madsen)Intersects 10.9 g/t gold over 9.8 metres, Including 27.0 g/t...
6/9/2011(Van Horne)Commences Drill Program at Van Horne Property
4/12/2011(Goldpines)Completes Drill Program at Goldpines North Joint Venture
Corporate news of Pure Gold Mining.
9/24/2016Announces AGM Results
7/14/2016Pure Gold Extends High Grade Gold to a Depth of 275 Metres -...
6/18/2016Pure Gold Reports Fiscal 2016 Financial Results
6/14/2016Pure Gold Intersects 31.3 g/t Gold Over 3.7 Metres Including...
6/9/2016Pure Gold Announces Significant Expansion of 2016 Exploratio...
6/8/2016Pure Gold Closes Previously Announced Bought-Deal Private Pl...
6/3/2016Pure Gold Files PEA Technical Report on SEDAR
6/2/2016Pure Gold Announces Appointment of Corporate Secretary and G...
5/25/2016Pure Gold Announces C$5 million Bought Deal Private Placemen...
5/20/2016Pure Gold Announces Final Closing of Sale of Non-Core Assets...
5/17/2016Pure Gold Intersects 10.9 g/t Gold Over 9.8 Metres, Includin...
5/4/2016Pure Gold Reports Additional Near Surface, High Grade Gold a...
10/24/2012Announces Share Consolidation Proposal
3/30/2012Defines Bulk-Tonnage Gold Exploration Target
7/18/2011Completes Phase I Drilling at Thundercloud Property, Ontario
5/26/2011Intersects 1.55 g/t Gold Over 68.8 Metres at Thundercloud Pr...
5/10/2011Stakes Rossing-Type Uranium Target in Saskatchewan
4/7/2011Commences Drill Program at Thundercloud Project
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (PGM.V)
0.020+33.33%
TSX-V
CA$ 0.020
12/06 09:30 0.010
33.33%
Prev close Open
0.015 0.020
Low High
0.015 0.020
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.020 -%
Volume 1 month var.
485,844 -%
24hGold TrendPower© : -7
Produces
Develops
Explores for Copper - Gold - Iron
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/24/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2022-97.33%0.880.01
2021-70.93%2.680.65
2020258.33%3.080.38
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.06+0.21%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 8.91-2.73%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.59-3.26%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.05+10.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.06+0.00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
 12.67+0.88%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.34+6.25%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+2.70%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
 1.77-2.21%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 40.37-0.22%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :
Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.
  • Receive our research reports on junior mining companies
    with the strongest potential
  • Free service, your email is safe
  • Limited offer, register now !
Go to website.