Sphinx Resources

Published : May 27th, 2008

Four New High GradeIntersections at Bracemac/McLeod Including 23=2E

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Copper | Diamond | Gold | Silver | Zinc |

Marketwire

 
 
Donner Metals Ltd.
TSX VENTURE: DON
FRANKFURT: D4M
Other Recent News

May 27, 2008
Donner Metals Ltd.: Four New High Grade Intersections at Bracemac/McLeod Including 23.70 Metres of 5.63% Copper and 11.46% Zinc
VANCOUVER, BRITISH COLUMBIA--(Marketwire - May 27, 2008) - Mr. Harvey Keats, Chief Executive Officer of Donner Metals Ltd. (TSX VENTURE:DON)(FRANKFURT:D4M), reports a significant expansion of the Bracemac Key Tuffite Zone at the Company's Matagami Project. Diamond drill hole BRC-08-74, designed to test for mineralization down-dip of this zone, returned a 23.70 metre interval of high-grade, massive sulphides averaging 5.63% copper and 11.46% zinc. The New McLeod Zone, approximately 1 kilometre east of Bracemac, has been extended up-dip by intersections of high-grade, massive sulphides encountered in Diamond drill holes MC-08-40 (1.1 metres) and MC-08-43 (8.54 metres). Drilling in MC-08-45, 250 metres up-dip of the New McLeod Zone, has also intersected high-grade massive and semi-massive sulphides over 6.35 metres.

Drilling Highlights
---------------------------------------------------------------------------
                                      Core
DDH                                 Length       %      %      g/t      g/t
(Depth)             From       To  (metres)     Zn     Cu       Ag       Au
---------------------------------------------------------------------------
---------------------------------------------------------------------------
Bracemac Key Tuffite Zone
---------------------------------------------------------------------------
BRC-08-74         652.60   676.30    23.70   11.46   5.63    17.76  Pending
---------------------------------------------------------------------------
 including        655.15   658.90     3.75   25.55   1.55     4.82
---------------------------------------------------------------------------
                  658.90   664.80     5.90    2.53  12.32    38.39
---------------------------------------------------------------------------
                  664.80   674.00     9.20   17.31   2.20     7.83
---------------------------------------------------------------------------
New McLeod Zone
---------------------------------------------------------------------------
MC-08-40          798.55   799.65      1.1   25.40   0.10  Pending     0.19
---------------------------------------------------------------------------
MC-08-43          743.53   752.07     8.54   13.98   1.15    30.03     0.94
---------------------------------------------------------------------------
Step out Drilling (Up-Dip Old McLeod Zone)
---------------------------------------------------------------------------
MC-08-45          268.93   275.28     6.35    8.09   2.35     5.64     0.26
---------------------------------------------------------------------------
 
Bracemac Area

Bracemac Zone: Diamond drill hole BRC-08-74 intersected unmineralized Bracemac Tuffite horizon 50 metres east and down-dip from BRC-07-28 (9.83% Zn, 0.90% Cu, 13.3 g/t Ag, 0.18 g/t Au over 6.90 metres).

Bracemac Key Tuffite Zone: Drill hole BRC-08-74 was continued to its primary target at the Bracemac Key Tuffite horizon where it extended the Bracemac Key Tuffite Zone by intersecting 23.70 metres of high-grade, massive sulphides, 60 metres down-dip and to the west of BRC-08-72 (11.26% Zn, 2.28% Cu, 8.78 g/t Ag, 0.45 g/t Au over 8.35 metres). Both BRC-08-72 and BRC-08-74 indicate significant thickening of high-grade massive sulphides in this area and the zone remains open for expansion.

McLeod Area

New McLeod Zone: Two drill holes were completed up-dip of the New McLeod Zone. MC-08-40 investigated the up-dip extension on the east side of the zone. This hole was drilled 50 metres up-dip of MC-07-31W1 (0.42% Zn, 1.50% Cu, 24.27 g/t Ag, 0.74 g/t Au over 3.0 metres) and 55 metres due east of MC-07-22 (19.30% Zn, 1.32% Cu, 28.5 g/t Ag, 0.75 g/t Au over 5.04 metres). MC-08-43 was drilled on the western side of the zone, 60 metres up-dip from MC-08-37 (17.77% Zn, 0.36% Cu, 16.13 g/t Ag, 1.34 g/t Au over 4.1 metres). Ongoing delineation drilling is designed to expand the New McLeod Zone and potentially connect it up-dip with the Old McLeod Zone.

Old McLeod, Up-dip: Drill hole MC-08-45 was designed to test off-hole electromagnetic anomalies and well developed Pipe alteration encountered in both MC-08-35 and MC-08-38. MC-08-45 intersected mineralization at the Key Tuffite stratigraphic level, 27 metres down dip from MC-08-38 and 250 metres up-dip from the Old McLeod Zone. Drill hole MC-08-48 was drilled 50 metres west of MC-08-45 and intersected mineralized Pipe alteration over 25.15 metres.

West McLeod Zone: Drill hole MC-08-46 was drilled at an orientation 90 degrees to the standard drill hole direction to test for vertical, northeast - southwest structures that trend parallel to the standard drill orientation. Pipe alteration, locally mineralized, has been observed at and below the Key Tuffite in previous drilling in the West McLeod Zone and is thought to be controlled by the targeted structures. MC-08-46 undercut the area between MC-07- 30 -W1 (0.89% Zn, 2.77% Cu, 12.23 g/t Ag, 0.05 g/t Au over 2.24 metres) and MC-07-21 (traces of chalcopyrite associated with chloritized structures). It intersected three zones of remobilized and replacement, pyrite-rich massive sulphides with quartz. Mineralization is hosted within Pipe alteration, with local chalcopyrite stringers, and strongly chloritized rhyolite at the Key Tuffite stratigraphic level. The true width and the geometry of the sulphides are uncertain and will require further drill follow-up. The hole is in progress and assays are pending.

Other: Drill hole MC-08-44 was a stratigraphic hole testing a gap in the drilling at a vertical depth of 600 metres midway between the Bracemac and McLeod areas. The hole did not intersect significant mineralization in the upper stratigraphy or at the Key Tuffite level. Historical drill hole MD-88-33, also located between the Bracemac and McLeod areas was deepened to provide for down-hole geophysical surveying. The original drill hole intersected the Key Tuffite at 700 metres vertical depth.

Details of the assay results can be found in the attached Appendix 1. Four drills are active on the Matagami Project at Bracemac and McLeod. A total of 61,012 metres of Diamond drilling in 128 drill holes has been completed since the project began in late 2006. Additional geological information, including maps and sections, is available at www.donnermetals.com.

The Matagami Project has an area of mutual interest of 4,750 square kilometres and presently includes 3,340 mineral claims covering 801 square kilometres. Taking advantage of Xstrata Zinc's extensive historical database, Donner and Xstrata Canada Corporation - Xstrata Zinc Canada Division (Xstrata Zinc) are using a combination of 3D data integration, innovative advanced technologies, new concepts and Diamond drilling to explore for new deposits in this prolific mining camp.

The Matagami Mining Camp is a world-class mining district, with 18 known VMS deposits, including 10 past producers of varying sizes, including the giant Matagami Lake Deposit (25.64 million tonnes of 8.2% Zn, 0.56% Cu, 20.91 g/t Ag and 0.41 g/t Au) discovered in 1957 and mined from 1963 to 1988. The area is host to historical production of 8.6 billion pounds of Zn and 853 million pounds of Cu and has established infrastructure including the town of Matagami, a railway, a paved road, and a 2,600 t/day mill owned by Xstrata Zinc.

Donner has the option to earn a 50% participating joint venture interest in the Matagami Project by incurring a total of $20 to $25 million of expenditures on exploration and related work on or before May 31, 2011. Upon earn-in by Donner, five separate joint ventures will be formed, covering the property and the area of interest. In each of the five joint venture areas, Xstrata Zinc has the option to earn back a 15% interest in each area by incurring up to $20 million on a feasibility study.

The Company's strategy is to explore for and discover zinc - copper deposits in the Matagami Camp and to leverage the general infrastructure and existing processing facilities within a known and well-established cost structure for developing VMS deposits. Donner's exploration objective is to investigate multiple stratigraphic horizons with potential for VMS mineralization including the prolific Key Tuffite horizon throughout the Matagami Camp. To date Donner has discovered new mineralization at Bracemac in the Upper Bracemac and Bracemac zones and the Key Tuffite horizon. In addition to delineation drilling at Old McLeod, Donner has discovered new mineralization at New McLeod and West McLeod at the Key Tuffite horizon at McLeod.

Supplementary Information

The field work on the Matagami Project is being carried out by project operator Xstrata Zinc Canada Division who is responsible for the sampling, submittal of samples for assay, assay verification and QA/QC. Assaying of samples reported in this news release was carried out and certified by ALS Chemex-Chimitec, of Val D'Or, Quebec (zinc, copper and silver by atomic absorption, and gold by standard fire assay procedures). Assays for MC-08-40 and BRC-08-74 are preliminary as assays and certification from ALS Chemex-Chimitec are pending. Sample preparation was done by ALS Chemex of Val D'Or, Quebec. Robin Adair, VP of Exploration for the Company is the Qualified Person responsible for the technical information in this news release.

ON BEHALF OF THE BOARD OF DONNER METALS LTD.

Harvey Keats, Chief Executive Officer

To view Appendix 1 please click on the following link: http://media3.marketwire.com/docs/DONNER0527.pdf


The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

CONTACT INFORMATION:

Donner Metals Ltd.
Harvey Keats
Chief Executive Officer
(604) 683-0564 or Toll Free: 1-800-909-8311
Fax: (604) 602-9311
Email: donner@bed-rock.com
Website: www.donnermetals.com

INDUSTRY: Manufacturing and Production - Mining and Metals

Footer

.
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Sphinx Resources

EXPLORATION STAGE
CODE : SFX.V
ISIN : CA8484221012
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Sphinx is a zinc and copper development stage company based in Canada.

Sphinx develops zinc, copper, gold and silver in Canada.

Its main asset in development is PD1 in Canada and its main exploration properties are SOUTH VOISEY BAY, WEST RAGLAN and MATAGAMI in Canada.

Sphinx is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 838 700 as of today (US$ 670 585, € 638 839).

Its stock quote reached its highest recent level on August 26, 2016 at CA$ 0.14, and its lowest recent point on December 06, 2022 at CA$ 0.01.

Sphinx has 83 870 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Sphinx Resources
8/8/2013Announces Second Closing of Private Placement
8/8/2013=3A Donner Metals announces closing of private placement
7/9/2013=3A Financing Update
6/24/2013Announces Financing
11/14/2012Announces Closing of C$1,439,000 Final Tranche Private Place...
2/28/2012Increases Private Placement Financing
2/27/2012Announces C$10,000,000 Private Placement Financing
10/27/2011Announces C$2,440,000 of Private Placement Financings
7/27/2011$3 Million Private Placement
7/25/2011Funds Received, Private Placement Closed
7/13/2011Financing News
2/15/2010Additional Private Placement Closings
11/16/2009Private Placements close
5/14/2009Non-Brokered Financing
1/7/2008 $3.2 Million Private Placement Closed
12/17/2007 Private Placement Increased to $3.2 Million
12/7/2007 $2.0 Million Private Placement
Project news of Sphinx Resources
12/10/2013Donner Metals Acquires Option on Valmond Gold Property from ...
10/30/2013(Matagami)Matagami Exploration Joint Ventures Update
9/3/2013=3A Donner Forfeits Interest in Bracemac=2DMcLeod
8/13/2013=3A Donner Metals Bracemac=2DMcLeod Interest
8/13/2013Bracemac-McLeod Interest
7/31/2013=3A Donner Metals Mineralization Extended=2C New Copper Zone...
7/12/2013=3A Donner Metals Update on Production at Bracemac=2DMcLeod
7/12/2013Update on Bracemac-McLeod Production
5/22/2013More High-Grade at McLeod Deep
5/16/2013Production has started!
5/16/2013Production Commences at Bracemac-McLeod
11/1/2012Development and Exploration Update
9/5/2012Bracemac-Mcleod Continues on Target
7/6/2012Provides Exploration Drilling Update
7/6/2012=3A Higher Production at Bracemac=2DMcLeod
7/5/2012Higher Production at Bracemac-McLeod
2/22/2012(Matagami)Ltd=2E: New Drilling Continues to Demonstrate Potential of M...
1/16/2012Ltd=2E: Bracemac-McLeod Mine Development Continues to Track ...
10/25/2011Ltd=2E: Bracemac-McLeod Mine Development Tracking On Budget ...
4/26/2011(Matagami)Completes Earn-In on the Matagami Project
3/6/2011(Matagami)Bracemac-McLeod Ramp Moves Past 660 Metres
2/10/2011(Pd1) Matagami Project Advances as the PD1 Deposit Moves to Feasi...
7/12/2010(Matagami)Drilling Extends McLeod Deep Discovery
3/7/2010(Matagami)Bracemac-McLeod Update
2/16/2010(Matagami)McLeod Deep Discovery Expanded-7.50 Metres Grading 10.27% Zi...
11/23/2009(Matagami)Expanded Winter Drill Progam Initiated at Matagami
10/1/2009(Matagami)Bracemac-McLeod Feasibility Advances as Exploration Continue...
7/15/2009(Matagami) BRACEMAC-MCLEOD advances to feasibility
6/5/2009(Matagami)on BNN and Matagami Project Details
5/25/2009(Matagami)Drilling to Resume at Matagami; Scoping Study Nears Completi...
2/26/2009(Matagami)BRACEMAC-MCLEOD NI 43-101 INDICATED RESOURCE: 3,623,000 TONN...
2/26/2009(Matagami)UPDATED BRACEMAC-MCLEOD NI 43-101
2/11/2009(Matagami)featured on Minesite.com
1/26/2009(Matagami)NI43-101 Resource
1/23/2009(Matagami)INITIAL BRACEMAC-MCLEOD NI43-101 INDICATED RESOURCE
11/12/2008(Matagami)Assays Return High-Grade Zincand Copper from the McLeod Disc...
9/5/2008Provides Initial Results From a Single Drill Hole Program on...
5/27/2008(Matagami)Four New High GradeIntersections at Bracemac/McLeod Includin...
5/9/2008(Matagami)13.47% Zinc, 2.33% Copper Over 6.95 Metres Intersected at Br...
4/11/2008High Grade Discovered Between Bracemac and McLeod
3/3/2008New High Grade Intersections Expand Zones at Bracemac and Mc...
1/9/2008 Drilling Intersects 9.48% Zinc and 2.81% Copper Over 6.00
Corporate news of Sphinx Resources
12/30/2013Announces Completion of Share Consolidation
12/13/2013Announces Results From AnnualGeneral and Special Meeting and...
11/14/2013Annual and Special General Meeting
7/18/2013Announces Closing of C$2,807,010 Placement
7/8/2013=3A Copper Stream with Sandstorm Amended
7/8/2013Donner Metals Copper Stream With Sandstorm Amended
3/14/2013Announces Financial Support from Quebec Institutions
1/15/2013Stock Options Granted
11/1/2012Ltd=2E: Increased Upfront Paymen =?ISO-8859-1?Q?t=20From=20S...
10/22/2012Announces Results from Annual General Meeting, Head Office M...
10/22/2012Announces Results from Annual General Meeting, Head Office M...
10/4/2012Underground photos and video updates from Donner Metals
9/19/2012Ltd=2E: Mcleod Zone Extended Up-Dip: Exploration Drilling In...
8/28/2012=3A President's Message
4/17/2012Normand Champigny Appointed President of Donner Metals
2/23/2012Sandstorm Partners With Donner Metals
2/22/2012Ltd=2E: Development to Reach the McLeod Zone a Year Ahead of...
2/22/2012News Release
1/20/2012Join us at at the Vancouver Resource Show and Exploration Ro...
9/1/2011September Video update from Donner Metals
7/13/2011Sandstorm Provides US$25 Million Senior Financing
4/14/2010Definition Drill Program Completed at Bracemac-McLeod
2/3/2010$2,409,930 Financing Closed
1/30/2010Financing Increased
9/8/2009engineering contract and fast-tracked feasibility
8/24/2009Two Near Term Production Stories
6/22/2009Industrial Alliance Features Report on Donner Metals
5/19/2009A "Green Shoot" Rising
5/14/2009Is At The Starting Gate
2/26/2009Hotsheet
2/18/2009positioned for success
2/9/2009featured in Mining Journal
12/12/2008$1,048,000 Financing Closes
12/4/2008 AND XSTRATA ZINC CANADA WIN INTERNATIONAL EXPLORATION AWARD
11/25/2008$1.0 Million Financing
11/18/2008Donner Metals has fast-track potential says Reinhard
7/31/2008 Drilling Continues toDelineate and Expand Mineralization at...
8/1/2008Hotsheet for 7/31/2008
5/28/2008$3 Million Debenture Offering
5/27/2008Hotsheet for 5/27/2008
4/11/2008Hotsheet for 4/11/2008
3/20/2008March Chairman's Letter
3/5/2008Hotsheet for 3/5/2008
2/1/2008Engages Mau Capital to Provide Investor Relations
1/8/2008Hotsheet for 1/8/2008
12/7/2007Chairman's Letter
11/28/2007Expands Interest in Matagami Camp
11/8/2007Join us at the San Francisco Hard Assets Investment Conferen...
10/22/2007 Hotsheet for 10/21/2007
8/2/20076 New Massive Sulphide =?ISO-8859-1?Q?=20Intersections,=20In...
6/14/2007New Zinc-Copper Discover 9.24% Zinc, 0.99% Copper Over 27.95...
6/7/2007Bracemac Yields Additional Results With New Mineralization I...
4/11/2007Copper-Rich Massive Sulphides Intersected in BRC-07-32 in th...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (SFX.V)
0.010+0.00%
TSX-V
CA$ 0.010
12/06 09:30 -
0%
Prev close Open
0.010 0.010
Low High
0.010 0.010
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.010 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : -9
Produces
Develops
Explores for Copper - Gold - Nickel - Palladium - Platinum - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :